I. G. N6660423Q0389_SOW_B11 and B447_20230612.docx

DOCX document 34 KB Posted

Attached to
Window Treatments and Installation Federal contract opportunity
Solicitation number
N6660423Q0389
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Window Treatments and Installation, newest first.
File Type Posted
N6660423Q0389-0001_20230622.docx DOCX document
I. G. N6660423Q0389-0001_SOW_B11 and B447_20230622.docx DOCX document
N6660423Q0389 SITE VISIT INSTRUCTIONS.docx DOCX document
N6660423Q0389.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

v1.2_FEBRUARY2021

PR NO. 1301075456

PID NO: 10-0089

STATEMENT OF WORK (SOW)

B11 and B447 Window Treatments PR No. 1301075456

1.0 Background

The Naval Undersea Warfare Center Division Newport requires new Window Treatments within two of its buildings located on Naval Station Newport. The window treatments include mini blinds, Mylar solar shades and vertical blinds.

1.1 Places of Performance

Installation shall be performed at Naval Station Newport, Newport, RI.

1.2 Authorized Users

NUWCDIVNPT Code 10 is the sole authorized user of this contract.

1.3 Sponsors

This contract is sponsored by NUWCDIVNPT.

1.4 Types of Funding

This requirement is funded using NUWCDIVNPT Overhead.

2.0 Scope

The contractor shall remove existing window treatments in NUWCDIVNPT Buildings 11 (B11) and 447 (B447) and deliver and install new window treatments. The contractor is responsible for measuring the windows to confirm window dimensions prior to delivery of materials.

B11 required window treatments - See Attachment #1, B11 Drawings:

· 1" Aluminum Mini Blinds – approximately 113 blinds –

B447 required window treatments – See Attachment #2, B447 Drawings:

· Solar Sun Shades – approximately 19 units

· Solid PVC Vertical Blinds – White or color to be selected by the Government from standard color chart. (Note: some areas span two window sections) - Approximately 24 units

· 1" Aluminum Mini Blinds – approximately 17 units

3.0 Applicable Documents

The contractor shall perform the tasking required in Section 4.0 in accordance with the manufacturers’ specifications, Attachment #1 - B11 Drawings, and Attachment #2 - B447 Drawings.

4.0 Technical Requirements

4.1 Site Prep and Cleanup

The contractor shall verify all existing window dimensions and locations for the new mini blinds, vertical blinds & Mylar solar Sun Shades on site before ordering materials. The Government is not responsible for measurement errors.

The contractor shall remove and dispose of existing window treatments. The contractor shall clean the existing windows surfaces of dust on the interior windows, before installing the new mini blinds, Mylar Solar Sun Shades and Vertical blinds. The Contractor is responsible for protecting, as necessary, wall surfaces, office furniture and equipment in the area where work is being done.

The contractor shall vacuum clean all areas affected by their operations upon completion of installation. The contractor shall remove all debris upon completion of work.

4.2 Mini Blind Installation

The contractor shall provide and install new 8 gauge aluminum mini blinds with 1” slats, spring tempered, with profile head rail and closed bottom rail, and are similar or equal to Hunter Douglas brand blinds. Refer to Attachments 1 and 2 for required mini blinds locations.

4.3 Vertical Blind Installation

4.3.1 Vertical Blinds:

The contractor shall provide and install new white solid PVC vertical blinds with associated hardware; head-rail with white finish or to match window mullion with all associated hardware at B-447 on four separate floors. Refer to Attachment #2 B-447 drawings for the required vertical blinds locations.

4.3.2 Headrail System

The contractor shall provide a headrail system not less than 0.047 inch thick and made of anodized aluminum alloy or 0.027 inch thick phosphate treated steel with a baked on ivory gloss enamel paint finish. The contractor shall provide a headrail that extends the full width of the blind and can be closed with an end cap at each end. One cap shall contain the traversing and tilting controls. The opposite cap shall house the pulley for the traversing cord. The headrail shall be a self-aligning headrail.

4.3.3 Louvers

The contractor shall provide louvers that traverse one way to match existing window blind orientation. The traversing control cord shall comly wih ANSI/WCMA A100.1 and will be minimum 0.070 inch in diameter with a minimum breaking strength of 125 pounds. The contractor shall anchor the cord to a lead carrier linked to all adjacent carriers. The contractor shall provide louvers that traverse along the headrail by pulling one side of the looped cord fastened to a cord tension pulley.

4.4 Mylar Solar Shade Installation

The contractor shall provide and install new Mylar Solar Sun Shades at B-447 in areas shown in Attachment 2 – B47 Drawing. The contractor shall provide sun shades that meet the following requirements:

· Transparent Mylar Solar Sun Shades made of a 3 ply, 4 mil Mylar (polyester) material; with a thin coating laminated between two glare reducing sheets of dyed polyester, which shall achieve the following:

· Heat is reduced by 74%

· Reduces glare by 90%

· Rejects 99% of ultraviolet rays which prevents fading of furniture, carpet, flooring, draperies

· Retains 25% of the inside heat in winter

· Cuts down on air-conditioning cost

· Increases comfort by maintaining an even, comfortable temperature year round

· Eliminates glare in the work area reducing eye strain and fatigue while increasing readability

· Provide Mylar Solar Sun Shades with bead operator chain, clutch control and metal bottom rail. Color shall be smoke/smoke #11 transparent Mylar.

The contractor shall install the new Mylar solar sun shades in between window mullions.

5.0 Government Furnished Information

The following Government Furnished Information (GFI) will be made available under this contract:

Attachment 1 – B11 Drawings Attachment 2 – B447 Drawings

6.0 Reserved

7.0 Reserved