I.14. CDRL_EHFRepair_12072022.pdf
PDF 200 KB Posted
- Attached to
- Electrical Hull Fittings Repairs Federal contract opportunity
- Solicitation number
- N666023R0101
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ Amendment 2 - Responses due 24 Jan and one clause removed.pdf | ||
| RFQ_Amendment 1_Date extension.pdf | ||
| I.5.a. 103122 Encl (7) Appendix_A.pdf | ||
| I.5.b. 103122 Encl (8) Appendix_F.pdf | ||
| I.12.ii. GFP_SAP_Repair.xlsx | XLSX spreadsheet | |
| EHF Repairs RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(2 Data Items)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions searching existing data sources gathering and maintaining the data needed and completing the reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington DC, Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0002 A TDP TM OTHER See Block 16
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
SUBSAFE/L1 Hardware, Engineering and Technical Services
PR 1301044891 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Inspection and Test Plan Inspection System Procedures
4. AUTHORITY (Date Acquisition Document No.) 5. CONTRACTING REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED DI-QCIC-81110 SOW para. 4.0 NUWCDIVNPT Code 8541 TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
ONE/R See Block 16 b. COPIES
8. APP CODE D
See Block 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
N/A N/A N/A Drafts Reg Repro
16. REMARKS:
NUWC Code 8541 1
BLK C: Category is Other – QCIC
BLK 9: See BLK 16 Addendum attached.
BLK 12: 30 days after task order award.
NUWC Code 45 COR 1
15. TOTAL 0 2 0
A002 N/A Technical Report
4. AUTHORITY (Date Acquisition Document No.) 5. CONTRACTING REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B
SOW para 4.1 NUWCDIVNPT Code 8541 TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ONE/R See Block 16 b. COPIES
8. APP CODE D
See Block 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
N/A N/A N/A Drafts Reg Repro
16. Remarks:
BLK C: Category is Other - MISC
BLK 9: See BLK 16 Addendum
BLK 10 & 12: No Later Than (NLT) 30 days after receipt of failed EHFs.
G. PREPARED BY:
Brian Wohler
H. DATE
12/7/2022
I. APPROVED BY
J. DATE
DD Form 1423-2, AUG 96 1059/183
Previous editions may be used of 4
Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions searching existing data sources gathering and maintaining the data needed and completing the reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington DC, Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing contracting Officer for the
SUBSAFE/L1 Hardware, Engineering and Technical Services
A003 Test/Inspection Report
N/A
4. AUTHORITY (Date Acquisition Document No.) 5. CONTRACTING REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B
SOW Para. 4.2 NUWCDIVNPT Code 8541 TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
See block 16 See block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
N/A See block 16 N/A N/A Drafts Reg Repro
BLK C: Category is Other - NDTI
Block 10 & 12: Delivery expected 30 days after successful repair of failed EHFs.
S
A004 N/A Certification/Data Report
4. AUTHORITY (Date Acquisition Document No.) 5. CONTRACTING REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80678
SOW Paragraph 4.2 NUWCDIVNPT Code 8541 TOTAL PRICE
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT See Block 16 See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
N/A See Block 16 N/A N/A Drafts Reg Repro
16. Remarks:
BLK C: Category is Other – MISC
NUWC Code 40 COR 1
Block 10 & 12: Contractor shall deliver a report within 10 days after completion of failure inspection of each failed EHF. Upon Government disapproval the contractor shall return The hardware to the Government.
Brian Wohler
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions searching existing data sources gathering and maintaining the data needed and completing the reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington DC, Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing contracting Officer for the
A005 Certification Data for Non-Nuclear Level I Material
4. AUTHORITY (Date Acquisition Document No.) 5. CONTRACTING REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-81020
SOW Para. 4.2 NUWCDIVNPT Code 8541 TOTAL PRICE
REQUIRED
See block 16 See block 16 b. COPIES
SUBMISSION
a. ADDRESSEE Final
Block 10 & 12: Contractor shall deliver a report within 15 days after successful completion of Electrical Hull Fitting (EHF) repairs and tests.
A006 N/A Certificate of Compliance
4. AUTHORITY (Date Acquisition Document No.) 5. CONTRACTING REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-81356A
SOW Paragraph 4.2 NUWCDIVNPT Code 8541 TOTAL PRICE
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT See Block 16 See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
N/A See Block 16 N/A N/A Drafts Reg Repro
16. Remarks:
BLK C: Category is Other – MISC
Block 10 & 12: Contractor shall deliver a report within 30 days after repairing EHFs.
G t F i h d M t i l f EHF i
Brian Wohler
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions searching existing data sources gathering and maintaining the data needed and completing the reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington DC, Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A
0002 TDP TM OTHER See Block 16
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A007 Contract Status Report
4. AUTHORITY (Date Acquisition Document No.) 5. CONTRACTING REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81991
SOW Para. 5.0 NUWCDIVNPT Code 8541 TOTAL PRICE
REQUIRED
MTHLY 30 DARC b. COPIES
SUBMISSION
a. ADDRESSEE Final
4. AUTHORITY (Date Acquisition Document No.) 5. CONTRACTING REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Final
16. Remarks:
15. TOTAL
Brian Wohler
H. DATE
DD FORM 1423
PR 1301044891
BLOCK 16 ADDENDUM
Export Warning
The following “EXPORT CONTROL WARNING NOTICE” must be used in conjunction with DISTRIBUTION STATEMENTS identified in all CDRL Items.
Warning - This document contains technical data whose export is restricted by the Arms Export Control Act Title 22, U.S.C. Sec. 2751 et seq.) or the Export Administration Act of 1979; as amended, Title 50 ,U.S.C., App 2401 et seq.
Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25.
THE FOLLOWING DISTRIBUTION APPLIES TO:
CDRL A001 – A007
Distribution Statement D:
Distribution authorized to the Department of Defense and U.S. DoD contractors only, Critical Technology (26 March 2020). Other requests for this document shall be referred to NUWCDIVNPT Code 8541.