I-75 South Roadway Embankment Dams WLS January 2026.pdf

PDF 126 KB Posted

Attached to
RoW Mow Trim and Litter Removal I-75 South D11
Solicitation number
RFB 605 2600000344 1
Issued by
Casey County, Kentucky

About this file

This is a project specification document for the I-75 South Roadway Embankment Dams Mowing Work, involving the Kentucky Department of Transportation across two districts: District 8 (Rockcastle County) and District 11 (Laurel County). The project encompasses mowing and litter removal services along Interstate 75, with two distinct work locations: a 0.246-mile segment north of the US 25 Interchange Overpass in Rockcastle County (MP 62.400 to MP 62.646) covering 7.59 acres, and a 0.189-mile segment north of KY 80 Underpass in Laurel County (MP 47.800 to MP 47.989) covering 6.50 acres. The combined project totals 0.435 miles and 14.09 acres, with mowing cycles scheduled for two cycles across both locations. The project is designated as Litter Project Type 3 and is scheduled for January 2026.

The document does not contain information regarding pricing terms, set-asides, bidding procedures, response deadlines, site visit requirements, bidder's meetings, award dates, contract terms, funding sources, or renewal options. No incumbent contractor information or current environment details are provided in this specification sheet.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1 of 1 Litter

Project Type 3 Number Removal Number Route Project Length Mowing of Cntrln of

Number System County Number Begin End (Miles) Acres Cycles Miles Cycles

I-75 Interstate Rockcastle FE01 102 0075 0.392 Miles North of Green Hill Road 0.246 7.59 2 NA NA 062-063 US 25 Interchange Overpass

(MP 62.400) (MP 62.646)

Subtotal (District 8) 0.246 7.59

I-75 Interstate Laurel FE01 063 0075 7.096 Miles North of 0.189 Miles North of 0.189 6.50 2 NA NA 047-048 KY 80 Underpass the Beginning

(MP 47.800) (MP 47.989)

Subtotal (District 11) 0.189 6.50

Grand Total 0.435 14.09

Limits of Project

I-75 South Roadway Embankment Dams Mowing Work Location Sheet

Sheet1

File details come from the government source that posted it. Updated .