I-75 South Roadway Embankment Dams WLS January 2026.pdf
PDF 126 KB Posted
- Attached to
- RoW Mow Trim and Litter Removal I-75 South D11
- Solicitation number
- RFB 605 2600000344 1
- Issued by
- Casey County, Kentucky
About this file
This is a project specification document for the I-75 South Roadway Embankment Dams Mowing Work, involving the Kentucky Department of Transportation across two districts: District 8 (Rockcastle County) and District 11 (Laurel County). The project encompasses mowing and litter removal services along Interstate 75, with two distinct work locations: a 0.246-mile segment north of the US 25 Interchange Overpass in Rockcastle County (MP 62.400 to MP 62.646) covering 7.59 acres, and a 0.189-mile segment north of KY 80 Underpass in Laurel County (MP 47.800 to MP 47.989) covering 6.50 acres. The combined project totals 0.435 miles and 14.09 acres, with mowing cycles scheduled for two cycles across both locations. The project is designated as Litter Project Type 3 and is scheduled for January 2026.
The document does not contain information regarding pricing terms, set-asides, bidding procedures, response deadlines, site visit requirements, bidder's meetings, award dates, contract terms, funding sources, or renewal options. No incumbent contractor information or current environment details are provided in this specification sheet.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1 of 1 Litter
Project Type 3 Number Removal Number Route Project Length Mowing of Cntrln of
Number System County Number Begin End (Miles) Acres Cycles Miles Cycles
I-75 Interstate Rockcastle FE01 102 0075 0.392 Miles North of Green Hill Road 0.246 7.59 2 NA NA 062-063 US 25 Interchange Overpass
(MP 62.400) (MP 62.646)
Subtotal (District 8) 0.246 7.59
I-75 Interstate Laurel FE01 063 0075 7.096 Miles North of 0.189 Miles North of 0.189 6.50 2 NA NA 047-048 KY 80 Underpass the Beginning
(MP 47.800) (MP 47.989)
Subtotal (District 11) 0.189 6.50
Grand Total 0.435 14.09
Limits of Project
I-75 South Roadway Embankment Dams Mowing Work Location Sheet
Sheet1
File details come from the government source that posted it. Updated .