I-75 I-275 WLS 01-2021.pdf
PDF 95 KB Posted
- Solicitation number
- RFB 605 2100000413 2
- Issued by
- Campbell County, Kentucky
About this file
I-75 I-275 WLS 01-2021 Mowing Work Location Sheet Summary
This is a Mowing Work Location Sheet for a state and local contract opportunity involving roadway maintenance services in Kentucky, specifically for Interstate 75, Interstate 275, Interstate 471, and state routes (KY 9, KY 237, KY 17, and US 27) across Campbell, Kenton, and Boone counties. The contract encompasses mowing, litter removal, and centerline mowing services across multiple highway segments with a combined total length of 73.303 miles and 1,126.16 acres. The scope includes Type 2 mowing (estimated 388.8 cycles), Type 3 centerline mowing (estimated 73.3 cycles), and litter removal services. The work locations are distributed across nine primary highway segments plus detention basin mowing, with the maximum time to complete a cycle specified as 15 working days. Batwing mowers are permitted on designated routes marked with asterisks.
The work location sheet provides detailed segment-by-segment breakdowns listing specific milepost ranges, estimated acreage, and required mowing cycles for each route section. Type 2 mowing is estimated to require four cycles per segment, while Type 3 centerline mowing requires seven cycles per segment. Detention basin mowing on I-75 in Kenton County requires two cycles and covers approximately 6.711 acres. The document does not contain information regarding pricing, set-asides, incumbent contractors, funding sources, bid submission dates, or contract award timelines, as it functions primarily as a technical specification sheet for work locations and estimated quantities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOWING WORK LOCATION SHEET
Estimated Litter Estimated Estimated Type 3 Number Removal Number Type 2 Number
Route Project Project Mowing of Cntrln. of Mowing of Number System County Number FROM TO Length Acres Cycles Miles Cycles Acres Cycles
I-75* MP Boone FE01 008-0075 0.9 Mile North of the Kenton County Line 9.712 270 4 9.7 7 35.6 1 173-184 I-71 Under-Pass (MP 183.312)
(MP 173.600)
I-75* MP Kenton FE01 059-0075 Boone Co. Ln. 2,600 Feet South of 6.711 132 4 6.7 7 24.7 1 183-191 (MP 183.312) KY 1120 (12th Street)
(MP 190.023)
I-275* MP Campbell FE01 019-0275 Ohio River Kenton County Line 3.778 96 4 3.8 7 27.6 1
073-078 (MP 73.777) (MP 77.555)
I-275* MP Kenton FE01 059-0275 Campbell Co. Line I-75 6.225 109 4 6.2 7 45.3 1
077-084 (MP 77.555) (MP 83.780)
I-275* MP Kenton FE01 059-0275 I-75 Boone County Line 1.582 9 4 1.6 7 5.8 1
000-002 (MP 0.000) (MP 1.582)
I-275* MP Boone FE01 008-0275 Kenton Co. Line Indiana State Line 12.313 202 4 12.3 7 89.5 1
001-014 (MP 1.582) (MP 13.895)
I-471* MP Campbell FE01 019-0471 I-275 Ohio River 4.828 57 4 4.8 7 17.6 1
001-006 (MP 1.000) (MP 5.828)
KY 9* MP Campbell FE01 019-0009 Rocky View Dr. I-275 4.803 83 4 4.8 7 17.5 1
(AA) 013-018 (MP 13.175) (MP 17.978)
KY 237* MP Boone FE01 008-0237 Wright Blvd I-275 0.448 2.4 4 0.5 7 1.5 1
004-010 (MP 8.771) (MP 9.219)
KY 17* MP Kenton FE01 059-0017 KY 16 I-275 8.997 82.11 4 9 7 65.4 1
009-019 (MP 9.516) (MP 18.513
US 27* MP Campbell FE01 019-0027 Nagel Road Constable Drive 7.195 77.65 4 7.2 7 52.3 1
001-010 (MP 1.988) (MP 9.183)
Subtotal MP 66.592 1120.16 66.6 382.8
* A Batwing Mower will be allowed on this route(s)
WORK LOCATION SHEET
MOWING WORK LOCATION SHEET
Estimated Litter Estimated Estimated Type 3 Number Removal Number Type 2 Number
Route Project Project Mowing of Cntrln. of Mowing of Number System County Number FROM TO Length Acres Cycles Miles Cycles Acres Cycles
WORK LOCATION SHEET
Mowing of Detention Basins:
I-75* MP Kenton FE01 059 0075 Boone Co Line 2600' South of 6.711 6 2 6.7 2
183 191 (MP 183.312) KY 1120
(MP 190.023)
Subtotal Detention Basins 6.711 6 6.7
Grand Total 73.303 1126.16 73.3 388.8
* A Batwing Mower will be allowed on this route(s)
Maximum time to complete a cycle: 15 working days.
Sheet1
File details come from the government source that posted it. Updated .