I-26 Corridor Improvement from Near Exit 136 to Exit 145.pdf
PDF 665 KB Posted
- Solicitation number
- P041362
- Issued by
- Charleston County, South Carolina
About this file
This is a Notice to Contractors issued by the South Carolina Department of Transportation (SCDOT) for a federal-aid highway improvement project on Interstate 26 from near Exit 136 to Exit 145, spanning approximately 18 miles across Calhoun and Orangeburg counties. The project encompasses comprehensive corridor improvements including bridge construction and removal, utility relocations for both Calhoun County Water System and Orangeburg DPU Water Division, pavement milling and resurfacing, drainage system installation, traffic control infrastructure, signage and marking systems, earthwork and excavation, retaining walls, and erosion control measures. The contract includes over 500 distinct line items with substantial quantities, including approximately 785,387 cubic yards of unclassified excavation, 835,713 cubic yards of borrow excavation, over 109,000 square yards of existing asphalt pavement removal, and extensive pavement markings totaling over 7.8 million linear feet. Electronic bids will be publicly opened on September 9, 2026, at 2:00 p.m. at SCDOT Headquarters in Columbia, South Carolina. Proposal bid forms, plans, and supporting documents became available on August 9, 2026, through the Bid Express website and SCDOT Construction Extranet, with hardcopy plans available for purchase at $2 per sheet. The project completion date is June 30, 2030.
This federal-aid project is funded through Title 23, United States Code, and is subject to Davis-Bacon prevailing wage requirements and Work Hours and Safety Act compliance. All bidders must be prequalified by SCDOT prior to bid submission and must submit a bid bond equal to 5% of the approximate bid amount through the BidX electronic system. The project requires a Disadvantaged Business Enterprise (DBE) goal of 0.00%, and utility work under Section 105 mandates the use of prequalified utility contractors from SCDOT's approved list—bidders must utilize contractors from the specified Calhoun County Water System and Orangeburg DPU Water Division prequalified lists or their bids will be deemed nonresponsive. Apparent low bidders must submit utility worksheets and prequalified subcontractor names within three business days following the letting. The SCDOT reserves the right to reject any or all proposals and waive technicalities, with all bid totals to be posted on the SCDOT website, Bid Express, and Construction Extranet immediately after bids are opened.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
NOTICE TO CONTRACTORS
For September 09, 2026
Letting Location:
SCDOT Headquarters Building
Conference Room 331 955 Park Street, Columbia, SC
Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet immediatley after bids are opened.
The following items will be made available on August 9, 2026 unless otherwise noted:
• Proposal bid forms on the Bid Express website (www.bidx.com)
• Construction Standards can be found under Business via SCDOT web site (www.scdot.org)
Access the Construction Extranet (https://www.scdot.org/business/constructionletting-extranet.aspx). for the following items:
• Proposals
• Plans
• Announcements
• Bids as Received
• CPM Schedule Templates
• Contractor Discussin Board
Contractors are encouraged to utilize the Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password.
Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737- 2031.
Hardcopy plans and proposals are available via Engineering Publications:
o Printed upon request only, call ahead for pickup orders o Located in room G23 SCDOT Headquarters o Email PlanStorage@scdot.org /Phone (803)737-4533/ Fax (803)737-4530 o Proposals are $15 and Plans are $2 per sheet o Cash, check, money order, VISA/MC accepted payable to SCDOT (No refunds) o Contractors do not have to buy plans to be able to bid o The Voluntary Plan Holders List is available on BIDX.
Please contact the Contract Administration Office at (803)737-7469 with all Letting related questions.
Notice
Call Number: 010 SC File Number: 5777250
This proposal includes utility work under Section 105: Public Utility Relocation and requires the use of a contractor from the SCDOT prequalified utility contractor list (see the next page). This is a material requirement of the solicitation. Any bid that does not utilize a contractor included on this list at the time of bid submission will be considered nonresponsive and will not be considered for award.
Contractors seeking to be added to the prequalified utility contractor list for this proposal must submit a completed Utility Subcontractor Approval Form, signed by the utility owner, to SCDOT no later than seven (7) days prior to the letting. The Utility Subcontractor Approval Form is available on the SCDOT Construction Extranet and included within the proposal documents. Upon approval, the prequalified contractor list will be updated and issued by amendment to the proposal.
Requests received after this deadline will not be considered for that letting.
Utility worksheets are included within the proposal documents. For the apparent low bidder, utility worksheets and prequalified utility subcontractor names must be submitted to Contract Administration via email at ContractAdmin@scdot.gov within three (3) business days following the letting.
CALHOUN COUNTY
WATER SYSTEM RELOCATIONS
INTERSTATE 26 - MM 137-146
Prequalified Contractors:
SCOOT Project No. P041362 HPG File No. 22055
Date: November 4, 2025
1. G.H. Smith Construction, Inc.
430 Shuler Court Columbia, SC 29212 803-622-5139 Contact: J eny Smith
2. CBG Inc.
500 State Road 424 Gaston, South Carolina 29053
(803) 791-8457 Contact: Kyle Godley
3. Barwick Plumbing Co., LLC 15 E Clark Street Pinewood, South Carolina 29125
(803) 452-5755 Contact: Adam Barwick
WHERE EASY LIVING MEETS OPPORTUNITY
102 Courthouse Drive I St. Matthews, SC 29135 I (803} 874-2435 I calhouncounty.sc.gov
ORANGEBURG DPU WATER DIVISION 2025
PREQUALIFIED CONTRACTOR’S LIST
Carolina Tap & Bore 2430 Morningside Drive West Columbia, SC 29169 803-739-7056(office) / 803-600-5365(cell) Mr. Richard Young
G.H. Smith Construction, Inc 430 Shuler Court Columbia, SC 29212 803-622-5139(cell) / 803- 781-5460, FAX 803- 781-1644
GD5, WL5, WP5, G-16126
Mr. Jerry Smith ghsmithconst@aol.com
Porth Contracting 151 Beacon Light Rd St. Matthews, SC 29135 SC Contractors License # 96595 (803)378-4466 (C) Mr. Chris Owens c.s.owens.co@gmail.com
McClam & Associates, Inc.
1642 Holy Trinity Church Road Little Mountain, SC 29075
(803) 345-9194, FAX (803) 345-5362
GD5, WL5, G-10203
Mr. Jesse McClam jmcclam@mcclam.net
R. H. Moore Construction 10601 Hwy 707 | PO Box 830 Murrells Inlet SC 29576
(843) 650-2155 Office Mr. Kevin Moore kevinmoore@rhmoorecompany.com
LAD Construction, LLC 221 Martin Neese Road Swansea, SC 29160
GD5, WL5, WP5
(803) 568-2196 (O) Mr. Mike
CBG, Inc 500 Frontage Road Gaston, SC 29053
(803) 791-8457 (O), (803) 201-1546 (C)
GD5, WL5, WP5
Mr. Benjamin Godley bgodley@cbgsitework.com
Shady Grove Construction, LLC 1540 Dutch Fork Road Irmo, SC 29063
GD5, WL5, WP5
(803) 781-2516 (O), (803) 572-2700 (C) Mrs. Dana McCall Danamccall77@yahoo.com
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 1
South Carolina Department of Transportation 8/3/2026
SC File NO(S).: 5777250
DBE Goal Percent: 0.00%
Approx. Length (miles):18.0000
CO(S).: Calhoun Orangeburg Description: I-26 CORRIDOR IMPROVEMENT FROM NEAR
EXIT 136 TO EXIT 145
Completion Date: 6/30/2030 Days Funding: FED
ITEMS OF WORK INCLUDE THE FOLLOWING:
P041362P041362PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
MOBILIZATION - SUBCONTRACTOR 1.000 LS
BRIDGE CONSTRUCTION ACCESS 1.000 LS
BONDS AND INSURANCE 1.000 LS
RAILROAD INSURANCE NS 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
UTILITY STAKING 1.000 LS
SMALL PUBLIC WATER RELOCATION NO. ____ CALHOUN COUNTY WATER
SYSTEM
1.000 EA
LARGE PUBLIC WATER RELOCATION NO. ____ ORANGEBURG DPU WATER
DIVISION
1.000 EA
CROSS SLOPE VERIFICATION 1.000 LS
LAW ENFORCEMENT OFFICER (DPS) 10,000.000 HR
CPM PROGRESS SCHEDULE 1.000 LS
CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS
REMOVAL OF STRUCTURES & OBSTRUCTIONS 1.000 LS
REMOVAL & DISPOSAL OF CONTAMINATED SOIL 100.000 TON
REMOVAL & DISPOSAL OF CONTAMINATED LIQUIDS 400.000 GAL
REMOVAL & DISPOSAL ITEM NO. 01 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 02 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 03 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 04 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 05 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,613.000 SY
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 109,518.000 SY
REMOVAL OF EXIST. GUARDRAIL 13,602.000 LF
REMOVAL & DISPOSAL OF CABLE BARRIER 41,847.000 LF
REMOVAL & DISPOSAL OF EXISTING BRIDGE 1 1.000 LS
REMOVAL & DISPOSAL OF EXISTING BRIDGE 2 1.000 LS
REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS
REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS
REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS
REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS
REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 2
Description Quantity Units
REMOVAL & DISPOSAL OF EXISTING CULVERT(__)'X(__) 4'X6' 1.000 EA
REMOVAL & DISPOSAL OF EXISTING CULVERT(__)'X(__) 6'X4' 1.000 EA
REMOVAL & DISPOSAL OF EXISTING CULVERT(__)'X(__) 6'X6' 1.000 EA
REMOVAL & DISPOSAL OF EXISTING TRIPLE CULVERT(__)'X(__) 10'X8' 2.000 EA
REMOVAL & DISPOSAL OF EXISTING TRIPLE CULVERT(__)'X(__) 8'X6' 1.000 EA
UNCLASSIFIED EXCAVATION 785,387.617 CY
BORROW EXCAVATION 835,713.568 CY
BORROW PIT SET-UP 1.000 LS
MUCK EXCAVATION 65,294.000 CY
18" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 8,490.550 LF
24" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 2,314.350 LF
30" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 1,195.700 LF
36" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 155.000 LF
42" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 37.950 LF
48" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 4.000 LF
54" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 7.350 LF
GEOTEXTILE, SEPARATION 13,000.000 SY
GEOGRID REINFORCEMENT (UNIAXIAL) 1,660.000 SY
GEOGRID STABILIZATION 13,000.000 SY
GEOTEXTILE SOIL REINFORCEMENT 1,175.000 SY
STRUCTURE EXCAVATION FOR CULVERTS 15,325.000 CY
STRUCTURE EXCAVATION FOR RETAINING WALL 19,715.000 CY
WET & DRY EXCAVATION FOR BRIDGES 3,479.000 CY
TEMPORARY SHORING SYSTEM 09 71.000 LF
TEMPORARY SHORING SYSTEM 10 70.000 LF
TEMPORARY SHORING SYSTEM 11 54.000 LF
TEMPORARY SHORING SYSTEM 12 71.000 LF
TEMPORARY SHORING SYSTEM 13 68.000 LF
TEMPORARY SHORING SYSTEM 14 160.000 LF
TEMPORARY SHORING SYSTEM 15 160.000 LF
TEMPORARY SHORING SYSTEM 16 40.000 LF
TEMPORARY SHORING SYSTEM 17 40.000 LF
TEMPORARY SHORING SYSTEM 18 40.000 LF
TEMPORARY SHORING SYSTEM 19 40.000 LF
TEMPORARY SHORING SYSTEM 20 405.000 LF
TEMPORARY SHORING SYSTEM 21 180.000 LF
TEMPORARY SHORING SYSTEM 22 180.000 LF
TEMPORARY SHORING SYSTEM 23 102.000 LF
TEMPORARY SHORING SYSTEM 24 102.000 LF
TEMPORARY SHORING SYSTEM 25 83.000 LF
TEMPORARY SHORING SYSTEM 26 83.000 LF
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 3
Description Quantity Units
TEMPORARY SHORING SYSTEM 27 120.000 LF
TEMPORARY SHORING SYSTEM 28 120.000 LF
TEMPORARY SHORING SYSTEM 29 142.000 LF
TEMPORARY SHORING SYSTEM 30 141.000 LF
TEMPORARY SHORING SYSTEM 31 141.000 LF
TEMPORARY SHORING SYSTEM 32 100.000 LF
TEMPORARY SHORING SYSTEM 33 30.000 LF
TEMPORARY SHORING SYSTEM 34 203.000 LF
TEMPORARY SHORING SYSTEM 35 17.000 LF
TEMPORARY SHORING SYSTEM 36 19.000 LF
TEMPORARY SHORING SYSTEM 37 170.000 LF
TEMPORARY SHORING SYSTEM 38 400.000 LF
TEMPORARY SHORING SYSTEM 39 470.000 LF
TEMPORARY SHORING SYSTEM 40 34.000 LF
TEMPORARY SHORING SYSTEM 41 58.000 LF
TEMPORARY SHORING SYSTEM 42 358.000 LF
TEMPORARY SHORING SYSTEM 43 260.000 LF
TEMPORARY SHORING SYSTEM 44 170.000 LF
TEMPORARY SHORING SYSTEM 45 396.000 LF
TEMPORARY SHORING SYSTEM NO. 1 01 99.000 LF
TEMPORARY SHORING SYSTEM NO. 2 02 53.000 LF
TEMPORARY SHORING SYSTEM NO. 3 03 74.000 LF
TEMPORARY SHORING SYSTEM NO. 4 04 47.000 LF
TEMPORARY SHORING SYSTEM NO. 5 05 95.000 LF
TEMPORARY SHORING SYSTEM NO. 6 06 36.000 LF
TEMPORARY SHORING SYSTEM NO. 7 07 81.000 LF
TEMPORARY SHORING SYSTEM NO. 8 08 37.000 LF
STONE BRIDGE LIFT MATERIAL 7,000.000 TON
GRANULAR BRIDGE LIFT MATERIAL 1,381.000 CY
OVERHAUL 235,190.000 CYHM
FINE GRADING 506,032.000 SY
FLOWABLE FILL 618.000 CY
DEWATERING SYSTEM NO. 1 1.000 LS
DEWATERING SYSTEM NO. 2 1.000 LS
DEWATERING SYSTEM NO. 3 1.000 LS
DEWATERING SYSTEM NO. 4 1.000 LS
DEWATERING SYSTEM NO. 5 1.000 LS
DEWATERING SYSTEM NO. 6 1.000 LS
GRADED AGGREGATE BASE COURSE (6" UNIFORM) 457,263.000 SY
GRADED AGGREGATE BASE COURSE (8" UNIFORM) 46,354.000 SY
MAINTENANCE STONE 140.000 TON
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 4
Description Quantity Units
HMA SHOULDER WIDENING COURSE 400.000 TON
PRIME COAT 128,362.590 GAL
LIQUID ASPHALT BINDER PG64-22 19,732.000 TON
LIQUID ASPHALT BINDER PG76-22 5,447.000 TON
FULL DEPTH ASPH. PAV. PATCHING 12"UNIF 2,500.000 SY
MILLING EXISTING ASPHALT PAVEMENT 2.0" 284,973.000 SY
MILLING EXISTING ASPHALT PAVEMENT 4.0" 46,571.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,340.000 SY
ASPHALT BASE COURSE - TYPE A 219,049.000 TON
ASPHALT BASE COURSE - TYPE B 38,732.500 TON
ASPHALT INTERMEDIATE COURSE TYPE B 155,817.350 TON
ASPHALT SURFACE COURSE TYPE B 21,450.100 TON
ASPHALT SURFACE COURSE TYPE E 13,477.000 TON
DRIVEWAY PAVING-SURFACE TYPE B 400.000 TON
STONE MATRIX ASPHALT SURFACE COURSE - 9.5 MM 85,519.000 TON
TRAFFIC CONTROL 1.000 LS
MAINTENANCE OF TRAFFIC 1.000 LS
BARRICADE - TYPE III 2,096.000 LF
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 10,055.000 SF
PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 3-70 MPH 46.000 EA
ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 3) 70MPH 327.000 EA
TEMPORARY CONCRETE BARRIER - UNANCHORED 111,150.000 LF
TEMP CONC. BARR W/ ANCHOR FOR ROADWAY SURFACES 3,730.000 LF
TEMP CONC BARRIER WITH ANCHORAGE FOR BRIDGE DECKS 1,200.000 LF
TEMPORARY POLYETHYLENE WATER-FILLED BARRIER 650.000 LF
CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 67.000 EA
TEMPORARY GLARE SCREENS FOR TRAFFIC CONTROL 28,000.000 LF
PAVEMENT MARKINGS(TEMP-THERMOPLASTIC) 4" WHITE BROKEN LINES 19,230.000 LF
PAVEMENT MARKINGS(TEMP-THERMOPLASTIC) 4" YELLOW BROKEN LINES 1,145.000 LF
PAVEMENT MARKINGS(TEMP-THERMOPLASTIC) 6" WHITE BROKEN LINES 329,480.000 LF
PAVEMENT MARKING(TEMPORARY-THERMOPLASTIC)-4"WHITE SOLID LINE 403,065.000 LF
PAVEMENT MARKING(TEMP.-THERMOPLASTIC)4" YELLOW SOLID LINES 433,550.000 LF
PAVEMENT MARKING(TEMPORARY-THERMOPLASTIC)-6"WHITE SOLID LINE 1,908,685.000 LF
PAVEMENT MARKINGS(TEMP-THERMOPLASTIC)-6" YELLOW SOLID LINES 1,709,145.000 LF
PAVEMENT MARKING(TEMPORARY-THERMOPLASTIC)-8"WHITE SOLID LINE 50,000.000 LF
PAVEMENT MARKING(TEMPORARY-THERMOPLASTIC)12"WHITE SOLID LINE 62,785.000 LF
PAVEMENT MARKING(TEMPORARY-THERMOPLASTIC)24"WHITE SOLID LINE 4,565.000 LF
PAVEMENT MARKINGS (TEMP-THERMOPLASTIC) 24” X 36” WHITE TRIANGLE
YIELD BAR
5,000.000 LF
PAVEMENT MARKING(TEMPORARY-THERMOPLASTIC)-WHITE SINGLE ARROW 23.000 EA
PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE LANE DROP ARROWS 3.000 EA
PAVEMENT MARKINGS(TEMPORARY-THERMOPLASTIC)-WHITE WORD 'ONLY 21.000 EA
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 5
Description Quantity Units
TEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.- 4"X4" 16,500.000 EA
TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,080.000 EA
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 19,230.000 LF
6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 329,480.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 403,065.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,908,685.000 LF
12" WHITE SOLID LINES - FAST DRY PAINT 62,785.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 4,565.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1,145.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 433,550.000 LF
6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 1,709,145.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,732.000 LF
6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 63,248.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 58,377.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 133,054.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 755.350 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 23.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 21.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 6.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 3.000 EA
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 30,629.000 LF
6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 130,985.000 LF
6"YELLOW SOLID LINES ON CURB/MED.-HIGH BUILD PAINT-25 MIL. 1,248.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 850.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,050.000 EA
PERM.RED/CLEAR PAVEMENT MARKERS BI-DIR. - 4"X 4" 9,630.000 EA
MILLED-IN RUMBLE STRIP 36.676 MI
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 3,130.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"WH.SOLID 1,820.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 1,745.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)6"YEL.SOL. 1,854.000 LF
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 1,188.000 SF
FLAT SHEET, TYPE III, SIZE DETERMINED BY MSG 496.750 SF
FLAT SHEET, TYPE XI, SIZE DETERMINED BY MSG, OVERHEAD 363.500 SF
MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE 12.000 EA
F&I MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MAST ARM 12.000 EA
EXTRUDED PANEL SIGNS - GROUND MOUNTED EXTRUDED 1,009.250 SF
EXTRUDED PANEL SIGNS- MOUNTED OVERHEAD 2,313.750 SF
REMOVAL OF OVERHEAD SIGN NO.(____)ON STRUC.NO.(_____) OH-01 ON ROH-
1.000 EA
REMOVAL OF OVERHEAD SIGN NO.(____)ON STRUC.NO.(_____) OH-15A ON ROH-
1.000 EA
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 6
Description Quantity Units
REMOVAL OF OVERHEAD SIGN NO.(____)ON STRUC.NO.(_____) OH-15B ON ROH-
1.000 EA
REMOVAL OF OVERHEAD SIGN NO.(____)ON STRUC.NO.(_____) OH-16A ON ROH-
1.000 EA
REMOVAL OF OVERHEAD SIGN NO.(____)ON STRUC.NO.(_____) OH-16B ON ROH-
1.000 EA
U-SECTION POST FOR SIGN SUPPORTS - 2P 512.000 LF
U-SECTION POST FOR SIGN SUPPORTS - 3P 2,056.000 LF
U-SECTION POST FOR SIGN BRACING - 2P 270.670 LF
BREAK-AWAY SIGN SUPPORTS 25,077.000 LB
REMOVAL OF I-BEAM SUPPORTS 74.000 EA
DELINEATORS, SINGLE, MONO., INCL. SUPPORTS 120.000 EA
DELINEATORS, DOUBLE, MONO., INCL. SUPPORTS 59.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-02 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-03 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-04 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-05 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-06 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-07 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-08 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-09 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-10 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-11 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-12 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) OH-13 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) SW-01 1.000 EA
OVERHEAD SIGN STRUCTURE NO.(____) SW-02 1.000 EA
REMOVAL OF OVERHEAD SIGN STRUCTURE NO.(____) ROH-01 1.000 EA
REMOVAL OF OVERHEAD SIGN STRUCTURE NO.(____) ROH-15 1.000 EA
REMOVAL OF OVERHEAD SIGN STRUCTURE NO.(____) ROH-16 1.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 200.000 LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 9,106.600 LF
FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 80.000 LF
FURNISH ADDITIONAL CONDUIT WITHIN DIRECTIONAL BORE 913.000 LF
FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (TRENCHLESS) 494.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 1,560.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 1,520.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 5,600.000 LF
FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 4.000 EA
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 5.000 EA
F&I-17"X30"X24"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 12.000 EA
FURNISH & INSTALL 40' WOOD POLE - CLASS II-CCA TREATED(0.60) 13.000 EA
FURNISH & INSTALL 3/8" BACK GUY FOR WOOD POLE 25.000 EA
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 7
Description Quantity UnitsEA
FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 1,580.000 LF
FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 8.000 EA
VARIABLE MESSAGE SIGN (PERMANENT WITH STRUCTURE) 4.000 EA
F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 01 4.000 EA
FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD 2.000 EA
FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 01 35.000 EA
F&I - COUNTDOWN PEDESTRIAN SIGNAL HEAD 8.000 EA
F&I - 1-WAY-1SECT.(COUNTDOWN HAND/MAN EMBLEM)PED.SIG.HEAD 8.000 EA
F&I-PED PUSH BUT.SOLID STATE W/ TONE ASSEM 9"X15"&SIGN (R-10-3E or R10- 4a)
8.000 EA
F&I VEHICLE TRAFFIC SINGAL HEAD MOUNTING ASSEMBLY FOR MAST ARM 14.000 EA
BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. 37.000 EA
REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LS
TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT 8.000 EA
FURNISH & INSTALL CONCRETE CABINET FOUNDATION 4.000 EA
FURNISH & INSTALL RADAR FOR STOP BAR DETECTION, INC 150' CABLE &
MOUNTING HARDWARE
8.000 EA
FURNISH & INSTALL CABINET INTERFACE COMPONENTS FOR RADAR
DETECTION
2.000 EA
FURNISH & INSTALL RADAR DETECTION CABLE TO CROSS ROADWAY 3,580.000 LF
POWDERCOATING PER MAST ARM OVER GALVANIZED 4.000 EA
DESIGN, FURNISH & INSTALL STEEL POLE WITH TWIN MAST ARMS INCLUDING
FOUNDATION 01
2.000 EA
DESIGN, FURNISH & INSTALL STEEL POLE WITH MAST ARM INCLUDING
FOUNDATION
2.000 EA
POWDERCOATING OPTION FOR 10' ALUMINUM PEDESTAL POLE 8.000 EA
WORK ZONE ITS 1.000 LS
CONC. FOR STRUCTURES - CLASS 4000 10,692.400 CY
CONC. FOR STRUCTURES - CLASS 4000(CULVERT) 89.200 CY
GROOVED SURFACE FINISH 14,648.000 SY
REINF. STEEL FOR STRUCTURES (ROADWAY) 10,922.000 LB
REINF. STEEL FOR STRUCTURES (BRIDGE) 2,512,874.000 LB
HOOP REINFORCING STEEL FOR STRUCTURES (BRIDGE) 11,030.000 LB
PRESTRESSED CONC. BEAM (TYPE II) 2,035.000 LF
PRESTRESSED CONC. BEAM (TYPE III) 5,802.600 LF
PRESTRESSED CONCRETE BULB TEE BEAM(63"MOD.) 2,552.900 LF
PRESTRESSED CONCRETE BULB TEE BEAM(65"MOD.) 4,206.300 LF
42" MASH CONCRETE BARRIER PARAPET/RAILING WALL 4,953.300 LF
56" CONCRETE MEDIAN BARRIER (TL-5)-BRIDGE 1 350.000 LF
STRUCTURAL STEEL (WEATHERING TYPE) 1.000 LS
STRUCTURE DRAINAGE SYSTEM 1.000 LS
DYNAMIC PILE ANALYZER TEST SET-UP DYNAMIC PILE ANALYZER TEST SETUP 67.000 EA
PILE DRIVING SET-UP 526.000 EA
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 8
Description Quantity Units
PREST. CONC. PILING (24"SQ.) 2,104.000 LF
PILE BUILD-UP PREPARATION (24"SQ) 6.000 EA
PREDRILLING FOR PREST. CONC. PILING (24"SQ.) 1,258.000 LF
PRESTRESSED INDEX PILING (24" SQUARE) 140.000 LF
PRESTRESSED PILE POINT (HP12X53) 306.000 LF
REINF. PILE TIPS (HP12 X 53) 34.000 EA
PREDRILLING FOR STEEL PILE (HP14 X 89) 960.000 LF
REINF. PILE TIPS (HP14 X 117) 34.000 EA
STEEL H BEARING PILING (HP14 X 89) 46,959.000 LF
STEEL H BEARING INDEX PILING (HP14 X 89) 3,470.000 LF
STEEL H BEARING PILING (HP14 X 117) 3,064.000 LF
STEEL H BEARING INDEX PILING (HP14X 117) 200.000 LF
MECH. STAB.EARTH RETAINING WALL BACKFILL(GRANULAR) 17,545.000 CY
MECHANICALLY STABILIZED EARTH RETAINING WALL(PANEL FACING) BRIDGE 22,225.000 SF
COPING FOR MSE RETAINING WALL(BRIDGE) 1,603.000 LF
18" REINFORCED CONCRETE PIPE (CLASS V SPECIAL)TRENCHLESS 1,939.000 LF
24" REINFORCED CONCRETE PIPE (CLASS V SPECIAL)TRENCHLESS 1,543.000 LF
30" REINFORCED CONCRETE PIPE (CLASS V SPECIAL)TRENCHLESS 926.000 LF
36" REINFORCED CONCRETE PIPE (CLASS V SPECIAL)TRENCHLESS 1,037.000 LF
42" REINFORCED CONCRETE PIPE (CLASS V SPECIAL)TRENCHLESS 483.000 LF
48" REINFORCED CONCRETE PIPE (CLASS V SPECIAL)TRENCHLESS 166.000 LF
54" REINFORCED CONCRETE PIPE (CLASS V SPECIAL)TRENCHLESS 197.000 LF
18" SMOOTH WALL PIPE 19,331.000 LF
24" SMOOTH WALL PIPE 5,935.000 LF
30" SMOOTH WALL PIPE 3,704.000 LF
36" SMOOTH WALL PIPE 333.000 LF
42" SMOOTH WALL PIPE 253.000 LF
48" SMOOTH WALL PIPE 4.000 LF
54" SMOOTH WALL PIPE 49.000 LF
LINE EXISTING 18" PIPE 428.000 LF
LINE EXISTING 24" PIPE 2,073.000 LF
LINE EXISTING 30" PIPE 422.000 LF
LINE EXISTING 36" PIPE 234.000 LF
LINE EXISTING 48" PIPE 106.000 LF
CLEANING EXISTING PIPE 1,842.000 LF
CATCH BASIN - TYPE 1 SPECIAL 7.000 EA
CATCH BASIN -TYPE 9 5.000 EA
CATCH BASIN TYPE 25 - SINGLE 4' X 6' BOX 13.000 EA
CATCH BASIN T-25 - SINGLE 4' X 6' BOX W/MOD. BOX NO.(___) 01 12.000 EA
CATCH BASIN TYPE 25 - DOUBLE 4' X 8' BOX 57.000 EA
CATCH BASIN T-25 - DOUBLE 4' X 8' BOX W/MOD. BOX NO.(___) 01 38.000 EA
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 9
Description Quantity Units
CATCH BASIN -TYPE 16 3.000 EA
CATCH BASIN -TYPE 17 3.000 EA
DROP INLET (24" X 36") 5.000 EA
DROP INLET TYPE 112 62.000 EA
DROP INLET TYPE 112 WITH 4X4 BOX 5.000 EA
DROP INLET TYPE 112 WITH 5X5 BOX 3.000 EA
DROP INLET TYPE 112 WITH 6X6 BOX 2.000 EA
DROP INLET TYPE 115 WITH STANDARD 5' X 5' BOX 3.000 EA
MANHOLE 11.000 EA
48" X 48" JUNCTION BOX 12.000 EA
60" X 60" JUNCTION BOX 2.000 EA
EXTRA DEPTH OF BOX 60.000 LF
CONCRETE COLLAR FOR UP TO 24" PIPE 25.000 EA
CONCRETE COLLAR FOR UP TO 36" PIPE 3.000 EA
CONCRETE COLLAR FOR UP TO 48" PIPE 1.000 EA
CATCH BASIN T-17 (CONVERT C.B. TYPE 5) 1.000 EA
JUNCTION BOX - CONVERT CB T-12 5.000 EA
BEVELING OF PIPE END 51.000 EA
4' SLOPE FLUME (6" CURB STYLE WITH CUTOFFS) 355.000 LF
CONCRETE GUTTER-TYPE 6 5,000.000 LF
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 1,988.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 2,952.000 SY
CONCRETE MEDIAN 265.000 SY
7'X 7' P.C. BOX CULVERT {AASHTO M-259} FH = 7 294.000 LF
7'X 7' P.C. BOX CULVERT {AASHTO M-259} FH = 8 246.000 LF
7'X 7' P.C. BOX CULVERT {AASHTO M-259} FH = 9 301.000 LF
ELASTOMERIC BEARING 406.000 EA
WATERPROOFING 549.300 SY
AGGREGATE UNDERDRAIN(AGG#789)WITH 4"PERF.PIPE FOR STRUC 3,728.000 TON
RIP-RAP (CLASS A) 1,283.000 TON
RIP-RAP (CLASS B) 2,908.000 TON
RIP-RAP (CLASS C) 3,042.000 TON
RIP-RAP (CLASS D) 118.000 TON
SLOPE PROTECTION-4" CONCRETE(FIBER REINFORCED) 7,215.000 SY
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 1)TYPE B 2,516.000 SY
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 1)TYPE C 125.000 SY
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B 6,632.000 SY
PREMASH W-BEAM STRONG POST SYSTEM WSP3 7,450.000 LF
MT3 LEADING END TREATMENT TL3 32.000 EA
MT2 LEADING END TREATMENT TL2 17.000 EA
PREMASH W-BEAM BRIDGE CONN TL2 WBBC2 14.000 EACH
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 10
Description Quantity Units
MEDIAN CABLE BARRIER 7,493.000 LF
MB TRAILING END TREATMENT 27.000 EA
MGS3 GR STANDARD SHOULDER 19,187.500 LF
PREMASH TRAILING W-BEAM TYPE B 12.5' 9.000 EA
CABLE BARRIER END ANCHOR 10.000 EA
PREMASH THRIEBEAM BRIDGE CONN TBBC3 1.000 EA
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 21.000 EA
MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 10.000 EA
FLUME INLET AT GUARDRAIL (HANDWORK) 32.000 EA
NON-MOW STRIP UNDER GUARDRAIL 354.120 SY
PREMASH W-BEAM TIGHT CURVED SYSTEM 207.670 LF
PREMASH W-BEAM MEDIUM SHOP BENT SYSTEM 755.750 LF
PREMASH SHORT TRIEBEAM BRIDGE CON TBBC2 2.000 EA
PREMASH TYPE T TL2 LEADING 25FT 9.000 EA
PREMASH TYPE T TL3 LEADING 50' 2.000 EA
2' CRASH CUSHION 3A 3.000 EA
36SS REINFORCED BARRIER WALL 11,996.000 LF
46SS REINFORCED BARRIER WALL 10,613.000 LF
56SS REINFORCED BARRIER WALL 25,569.000 LF
56ZOI VF BARRIER MEDIAN SYSTEM 730.000 LF
FRENCH DRAIN AND WEEP SYSTEM 1,874.000 LF
CONC BARR TRANSITION BETWEEN TWO SHAPES 40.000 LF
WOVEN WIRE FENCE - TYPE 6 WITH 2 STRANDS BARBED 34,600.000 LF
BRIDGE FENCE 1.000 LS
72" CHAIN LINK FENCE 72" CHAIN-LINK FENCE 108,562.000 LF
TEMPORARY BARRIER FENCE (ORANGE) 9,040.000 LF
MOVING ITEM NO. 01 1.000 LS
MOVING ITEM NO. 02 1.000 LS
MOVING ITEM NO. 03 1.000 LS
MOVING ITEM NO. 04 1.000 LS
MOVING ITEM NO. 05 1.000 LS
MOVING ITEM NO. 06 1.000 LS
MOVING ITEM NO. 07 1.000 LS
MOVING ITEM NO. 08 1.000 LS
MOVING ITEM NO. 09 1.000 LS
MOVING ITEM NO. 10 1.000 LS
MOVING ITEM NO. 11 1.000 LS
MOVING ITEM NO. 12 1.000 LS
MOVING ITEM NO. 13 1.000 LS
MOVING ITEM NO. 14 1.000 LS
RIGHT OF WAY MARKER(REINFORCED CONCRETE) 321.000 EA
Call No.: 010 Letting Date: September 09, 2026 Letting Time: 2:00 pm Page: 11
Description Quantity Units
RIGHT OF WAY MARKER(REBAR AND CAP) 321.000 EA
RIGHT OF WAY PLAT 1.000 LS
PERMANENT COVER 309.044 ACRE
TEMPORARY COVER 154.522 ACRE
FERTILIZER (NITROGEN) 32,445.280 LB
FERTILIZER (PHOSPHORIC ACID) 32,445.280 LB
FERTILIZER (POTASH) 32,445.280 LB
AGRICULTURAL GRANULAR LIME 772,176.000 LB
SELECTIVE WATERING 334,261,583.
GAL
MOWING 927.132 ACRE
TURF REINFORCEMENT MATTING (TRM) TYPE 1 14.150 MSY
TEMPORARY EROSION CONTROL BLANKET (ECB) 263.225 MSY
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1 481.920 ACRE
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 160.640 ACRE
HYDR.EROS.CONTRL.PROD.(HECP) - TYPE 1 AS TRACER UNDER TRM 53.430 ACRE
INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 672.000 LF
INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 672.000 LF
SEDIMENT TUBES FOR DITCH CHECKS 19,437.000 LF
SILT FENCE 56,100.000 LF
REPLACE/REPAIR SILT FENCE 5,610.000 LF
FLOATING TURBIDITY BARRIER-MEDIUM DUTY 500.000 SF
CLEANING SILT BASINS 10,599.000 CY
REMOVAL OF SILT RETAINED BY SILT FENCE 14,025.500 LF
INLET FILTER CLEANING 132.000 EA
INLET STRUCTURE FILTER - TYPE D1 27.000 EA
FILTER MATERIAL FOR INLET STRUCTURE FILTER - TYPE D1 54.000 EA
INLET STRUCTURE FILTER - TYPE B 45.000 EA
INLET STRUCTURE FILTER - TYPE D2 45.000 EA
FILTER MATERIAL FOR INLET STRUCTURE FILTER - TYPE D2 47.000 EA
AGGREGATE NO.5 OR 57 FOR EROSION CONTROL 463.000 TON
STABILIZED CONSTRUCTION ENTRANCE 8,633.000 SY
TEMPORARY FLEXIBLE PIPE SLOPE DRAIN - 8" 4,460.000 LF
82SS REINFORCED BARRIER WALL 9,857.000 LF
97SS REINFORCED BARRIER WALL 4,188.000 LF
BAT EXCLUSION DEVICE 12.000 EA
BAT EXCLUSION DEVICE MAINTENANCE 12.000 EA
ON-THE-JOB TRAINEE (ROADWAY) 76,440.000 HR
ON-THE-JOB TRAINEE (BRIDGE) 11,440.000 HR
Notice is hereby given that in addition to the Standard Specifications for Highway Construction, Edition of 2025, the "Supplemental Specifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings:
STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisement contemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways.
The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the Federal Highway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, religion or national origin in consideration for award. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and Special Provision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of the proposal.
Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsible for carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called to the fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours and Safety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations.
PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED A
PREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BE
ALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the Contracts Administration office, Room 332 in the Headquarters building, 955 Park Street, Columbia, SC, or by contacting Maria Devito at (803)737-2043 or Prequal@scdot.org.
BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT, written by a SURETY satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal).
SUBMISSION OF BID BONDS. Bid Bonds must be submitted electronically, utilizing the Bid Bonds feature within the BidX Bid Form. The Bond ID number must be provided on the Surety 2000 or Tinubu (SurePath) Network electronic bond form. NO OTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED.
IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the following reasons:
1. In the schedule of Prices,
(a) alteration of a part of bid item except for the unit price; or
(b) failure to enter a bid item unit price; or
(c) a bid item unit price is not in the proper form or is incomplete.
2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete.
3. In the PROPOSAL FORM,
(a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked.
4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished.
5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.
TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the sole judge of determining the local time and the arrival of the designated time for the opening and reading of the bids.
THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECT
ANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES.
MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARY
OF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THE
FEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH IN
THE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETY
ACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS.
CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNING
SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED IN
THIS CONTRACT.
Information in this notice is the latest available at the time of its publication. The information contained in the proposals, plans, and any addenda issued shall govern over this notice. Quantities shown herein are approximate for information only and should not be used for bidding purposes. The Department reserves the right to change these quantities without notice.
Issued by: Travis Driggers Contract Administrator
File details come from the government source that posted it. Updated .