I-25-2001_CMGC_I-294Bridges_11062026.pdf

PDF 3 MB Posted

Attached to
I-25-2001 Tri-State Tollway (I-294) Bridge Construction 107th St to Illinois Rte 43 (Harlem Ave. )
Solicitation number
27-557THA-ENGCO-B-54761
Issued by
Illinois

About this file

This Notice of Intent (NOI) document issued by the Illinois Tollway announces an upcoming Construction Manager/General Contractor (CM/GC) procurement for bridge reconstruction along the Tri-State Tollway (I-294) in Cook County, Illinois, spanning from 107th Street to Illinois Route 43 (Harlem Avenue) at mile posts 15.6 to 16.8. The Project encompasses reconstruction of nine structures including I-294 bridges over 107th Street, Norfolk Southern Railroad, Southwest Highway, Stony Creek culvert, and Illinois Route 43, along with associated roadway improvements. The procurement will follow a two-step Best Value selection process: Step 1 consists of a Request for Qualifications (RFQ) with a Statement of Qualifications (SOQ) due January 29, 2027, followed by Step 2 with a Request for Proposals (RFP) estimated for release on March 15, 2027. The RFQ is estimated to be released on December 7, 2026. Shortlisted Proposers (between two and five firms) will advance to the RFP phase, which will require submission of Technical, Price, and Administrative proposals. A site visit may be made available to Proposers for visual inspection on a date to be determined in the RFP. No stipend will be offered for this procurement.

The estimated contract price is $150 to $200 million, categorized as Category F. The CM/GC Contractor will provide Phase One Services during the design phase, including cost modeling, schedule development, constructability reviews, risk identification, site investigations, and value-engineering recommendations, with potential for early work packages and long-lead material procurement. The Contractor will transition to General Contractor during Phase Two for construction services. Thirteen firms are explicitly excluded from participation due to known conflicts of interest, including AECOM, WSP USA, Inc., HNTB Corporation, and others. Proposers must certify compliance with Illinois Procurement Code conflict-of-interest statutes and disclose any past, present, or planned interests that could result in organizational conflicts. The Illinois Tollway Point of Contact is Sherita Kelly, Senior Contract Negotiator, at skelly@getipass.com.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION MANAGER / GENERAL CONTRACTOR

Notice of Intent (NOI)

I-25-2001

TRI-STATE TOLLWAY (I-294)

BRIDGE RECONSTRUCTION

107th STREET TO ILLINOIS ROUTE 43 (HARLEM AVENUE)

MILE POST 15.6 to MILE POST 16.8

November 6, 2026

County: Cook Route: I-294

1. PROJECT IDENTIFICATION

1.1 INTRODUCTION

The Illinois Tollway hereby informs industry via this Notice of Intent (NOI) of an upcoming

Request for Qualifications (RFQ) solicitation associated with the “Project”. The Project is anticipated to be delivered under a Construction Manager / General Contractor (CM/GC) contract. A project map is provided in Appendix A.

The intent of this NOI is solely to inform industry of the Project for prospective Proposers to start preparing for the upcoming CM/GC procurement.

The Tollway Point of Contact for this Procurement is:

Sherita Kelly

Senior Contract Negotiator E-Mail: skelly@getipass.com

INTRODUCTION TO CM/GC

CM/GC is an alternative contracting method in which the Illinois Tollway contracts with a CM/GC

Contractor that serves as a Construction Manager (CM) in the role of a consultant to the Illinois

Tollway during the design phase (Phase One) and then transitions to a General Contractor (GC) during the construction phase (Phase Two).

The CM/GC Contractor is typically procured at a conceptual design stage, maximizing the ability to influence the scope, schedule, budget and risks of the Project. Procurement of a CM/GC

Contractor will require a two-step, Best Value procurement, which includes the evaluation of a

Request for Qualifications (RFQ) and a Request for Proposals (RFP), inclusive of a Technical

Proposal and a Price Proposal. Please see Section 1.4 (Selection Process Overview) for more information. A stipend will not be offered for this procurement.

CM/GC projects are divided into two phases: Phase One (design) and Phase Two (construction).

In Phase One, the CM/GC Contractor provides Phase One Services, which will typically include, but are not limited to, the following activities:

• Developing the Cost Model, and Open Book Estimates for Phase Two services, including providing Illinois Tollway a transparent view into Project direct costs, indirect costs, and risk pricing;

• Establishing the project schedule and exploring potential schedule-saving initiatives such as early works projects and long-lead material procurements;

• Performing constructability reviews;

• Reviewing and providing input on construction phasing;

• Identifying project risks and providing recommendations for risk mitigation;

• Performing site investigations;

• Reviewing project scope and providing input for potential value-engineering opportunities;

• Assist with third-party coordination; and

• Assist with permits.

CM/GC is typically utilized on projects which would benefit from early involvement from the

CM/GC Contractor during Phase One.

While there appears to be a distinct line between Phase One and Phase Two Services, the CM/GC delivery method allows the CM/GC Contractor, during Phase One (and subject to (i) Illinois

Tollway Approval and (ii) the successful negotiation of price), to identify and procure/construct

“early work” packages for severable elements of the Project (e.g., procurement of long lead items, clearing/grubbing, utility clearing, demolition, etc.) in advance of agreeing to a price for the remainder of the Project construction. This can be advantageous to the overall Project schedule. It is expected that the CM/GC Contractor will assist in identifying such packages.

1.2 ESTIMATED PROJECT SCHEDULE

Below is a tentative schedule of dates for the procurement of this Project.

1.3 PROJECT INFORMATION

1.3.1 Scope

The Project generally consists of reconstruction of multiple structures and associated roadway improvements along the Tri-State Tollway (I-294) between 107th Street and

Illinois Route 43 (Harlem Avenue) in Cook County.

The following structures are included in this project:

I-294 over 107th Street (two structures)

I-294 over Norfolk Southern Railroad (two structures)

I-294 over Southwest Highway (two structures)

I-294 over Stony Creek (culvert)

I-294 over Illinois Route 43 (Harlem Avenue) (two structures)

Additional details will be provided in the Request for Qualifications.

Milestone Date

Issue NOI 11/6/2026

Estimated release of RFQ 12/7/2026

Estimated SOQ Submission Due Date 1/29/2027

Estimated release of RFP 3/15/2027

1.3.2 Project Goals

The Project goals are:

• Construct high-quality infrastructure:

• Successfully negotiate Phase Two services.

• Start and finish construction as early as possible.

• Complete construction while maintaining safety for workers and public.

• Minimize impacts to Illinois Tollway, IDOT, and local agency roadway operations and other stakeholders:

• Engage and coordinate effectively with stakeholders and third-party agencies, including utilities and railroads.

• Provide feedback on the CM/GC process.

1.3.3 Estimated Contract Price

The project is anticipated to be a Category F with an estimated cost of $150 to $200 million.

CATEGORY

A $10 - $25M

B $25 - $50M

C $50 - $75M

D $75 - $100M

E $100 - $150M

F $150 - $200M

G >$200M

1.4 SELECTION PROCESS OVERVIEW

The Illinois Tollway will use a two-step process to select a CM/GC Contractor to deliver the

Project. Step 1 consists of an RFQ phase followed by Step 2 which is an RFP phase.

The RFQ will provide more in-depth information about the Project and request certain administrative and clerical information from each Proposer. Additionally, the RFQ will request qualifications, such as experience on relevant past projects as well as skills and experience of potential Proposer’s Key Personnel. The Illinois Tollway will assess Proposers’ Statement of

Qualifications (SOQ) submitted in response to the RFQ. A group of Proposers (at least two but no more than five) will be shortlisted, granting them eligibility to respond to the subsequent RFP.

Shortlisted Proposers will be invited to respond to the RFP. The RFP will request Proposers submit a Proposal, which consists of three components: (i) Technical Proposal, (ii) Price Proposal, and (iii)

Administrative Proposal. The Technical Proposal should describe the Proposer’s technical approach to delivering the Project, including its approach to Phase One Services and Phase Two

Services. The Price Proposal will be outlined in the RFP and may include costs for Phase One

Services and/or a Phase Two Construction Fixed-Markup Fee.

After Proposals are submitted, they will be reviewed by the Illinois Tollway and evaluated. The

Proposer with the highest total combined score consisting of the Technical Proposal and Price

Proposal will be designated as the Apparent Best Value Proposer. The Illinois Tollway reserves the right to reject any or all Proposals.

1.5 SITE VISIT

The Illinois Tollway may make all parts of the Project worksite available to Proposers for visual inspection on a date to be determined and provided in the RFP.

2. RESTRICTIONS ON PARTICIPATION IN CM/GC CONTRACTS

2.1 CONFLICT OF INTEREST

Proposers must identify potential conflicts of interest related to this procurement. These may arise from prior or existing contractual obligations between a company and a federal, state, or local agency relative to the Project or the Illinois Tollway’s CM/GC program. Proposers must disclose all relevant facts concerning any past, present, or currently planned interests which may result in an organizational conflict of interest upon Award of a contract. If a potential conflict of interest is identified, the Proposer must submit relevant information to the Illinois Tollway’s Purchasing Agent contact listed above.

The Illinois Tollway in conjunction with the Chief Procurement Office for General Services is solely responsible for deciding if conflicts of interest. When the Illinois Tollway finds a participating entity has a conflict of interest or holds a competitive advantage that cannot be mitigated, it must be excluded from the Proposer. Interested contractors and parties may submit questions via email with respect to conflicts of interest at the parties’ earliest opportunity to the Illinois Tollway Purchasing Agent contact identified above.

Proposers will be required to certify, by the signature of duly authorized representatives, that they are legally entitled to enter into a contract pursuant to this solicitation and that they shall not be violating, either directly or indirectly, any conflict-of-interest statute under Section 50-35 and Section 50-10.5(e) and 50-35 of the Illinois Procurement Code.

2.1.1 The firms listed below are not allowed to participate in this Project due to a known conflict of interest:

• AECOM

• American Surveying & Engineering, Ltd.

• Bravo Company Engineering, Inc

• GSG Consultants, Inc.

• Egis (formerly known as H.W. Lochner, Inc.)

• Innleadair, LLC

• Rubinos & Mesia Engineers, Inc.

• SE3, LLC

• WSP USA, Inc.

• Ardmore Roderick

• HOH Group

• Morreale Communications

• HNTB Corporation

• Future Construction Oversite Team (COT)- pending selection by the Illinois Tollway

3. Attachment A: Project Map

I-294 Over Illinois Route 43

(Harlem Avenue)

(B.N. 167 & 168)

I-294 Over Stony Creek

(B.N. 164C)

I-294 Over Southwest

Highway

(B.N. 165 & 166)

I-294 Over Norfolk

Southern Railroad

(B.N. 163 & 164)

I-294 Over 107th Street

(B.N. 161 & 162)

File details come from the government source that posted it. Updated .