HWAD Lightening Protection Inspection Results - Jan 2025.pdf

PDF 19 KB Posted

Attached to
Hawthorne Army Depot Operation, Maintenance, and Modernization Sources Sought
Solicitation number
W519TC-25-V-HWAD
Issued by

About this file

This document is a comprehensive Lightning Protection Inspection Results report for Hawthorne Army Depot, documenting grounding and structural visual inspections conducted across multiple locations from January 6-29, 2025. The report includes detailed measurement data for 79 different building locations, with each entry recording ground and building contact measurements using two separate instruments (numbered 79111 and 82314). Measurements were taken at specific points designated with alphanumeric codes (e.g., A1853, B1853) and consistently tracked lower and upper measurement limits between 0.001 and 25.000 for building ground measurements, and 0.001 and 2.000 for building contact measurements.

The inspection process covered a wide range of depot locations, with work orders spanning from 010-001 to 067-003, totaling 127 work orders. Inspections were performed as Preventive Maintenance (PM) checks, with each location systematically reviewed for structural and grounding integrity. Most inspections occurred between January 6-29, 2025, with a single notation of a "Broken Door Ground" at location 041-011. The comprehensive nature of the document suggests a thorough and methodical approach to maintaining lightning protection infrastructure at the Hawthorne Army Depot, ensuring electrical safety and equipment protection across multiple facility sections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2/4/25 9:21 AM 1 / 9

LIGHTNING PROTECTION INSPECTION RESULTS

LOCATIO MEASURE

DATE

MEASURE

VALUE

POINT

NUM

POINT NAME LOWER

LIMIT

UPPER

LIMIT

INSTRU

#1

INSTRU

#2

010-001 1/6/25 4.60 A1853 BLDG GRND 0.001 25.000 79111 82314

010-001 1/6/25 0.10 B1853 BLDG CONT 0.001 2.000 79111 82314

010-002 1/6/25 4.40 A1850 BLDG GRND 0.001 25.000 79111 82314

010-002 1/6/25 0.10 B1850 BLDG CONT 0.001 2.000 79111 82314

010-004 1/6/25 4.20 A1848 BLDG GRND 0.001 25.000 79111 82314

010-004 1/6/25 0.10 B1848 BLDG CONT 0.001 2.000 79111 82314

010-006 1/6/25 4.80 A1845 BLDG GRND 0.001 25.000 79111 82314

010-006 1/6/25 0.10 B1845 BLDG CONT 0.001 2.000 79111 82314

010-007 1/6/25 4.70 A1846 BLDG GRND 0.001 25.000 79111 82314

010-007 1/6/25 0.10 B1846 BLDG CONT 0.001 2.000 79111 82314

010-008 1/6/25 4.10 A1847 BLDG GRND 0.001 25.000 79111 82314

010-008 1/6/25 0.10 B1847 BLDG CONT 0.001 2.000 79111 82314

010-009 1/6/25 3.80 A1843 BLDG GRND 0.001 25.000 79111 82314

010-009 1/6/25 0.10 B1843 BLDG CONT 0.001 2.000 79111 82314

010-011 1/6/25 3.30 A1840 BLDG GRND 0.001 25.000 79111 82314

010-011 1/6/25 0.10 B1840 BLDG CONT 0.001 2.000 79111 82314

010-012 1/6/25 4.20 A1841 BLDG GRND 0.001 25.000 79111 82314

010-012 1/6/25 0.10 B1841 BLDG CONT 0.001 2.000 79111 82314

010-014 1/6/25 4.50 A1838 BLDG GRND 0.001 25.000 79111 82314

010-014 1/6/25 0.10 B1838 BLDG CONT 0.001 2.000 79111 82314

010-015 1/7/25 4.30 A1839 BLDG GRND 0.001 25.000 79111 82314

010-015 1/7/25 0.10 B1839 BLDG CONT 0.001 2.000 79111 82314

010-017 1/7/25 4.20 A1837 BLDG GRND 0.001 25.000 79111 82314

010-017 1/7/25 0.10 B1837 BLDG CONT 0.001 2.000 79111 82314

010-018 1/7/25 4.40 A1834 BLDG GRND 0.001 25.000 79111 82314

010-018 1/7/25 0.10 B1834 BLDG CONT 0.001 2.000 79111 82314

010-019 1/7/25 4.50 A1835 BLDG GRND 0.001 25.000 79111 82314

010-019 1/7/25 0.10 B1835 BLDG CONT 0.001 2.000 79111 82314

010-020 1/7/25 4.30 A1832 BLDG GRND 0.001 25.000 79111 82314

010-020 1/7/25 0.10 B1832 BLDG CONT 0.001 2.000 79111 82314

011-001 1/7/25 5.20 A1833 BLDG GRND 0.001 25.000 79111 82314

011-001 1/7/25 0.10 B1833 BLDG CONT 0.001 2.000 79111 82314

011-002 1/8/25 6.80 A1830 BLDG GRND 0.001 25.000 79111 82314

011-002 1/8/25 0.10 B1830 BLDG CONT 0.001 2.000 79111 82314

011-003 1/8/25 6.50 A1831 BLDG GRND 0.001 25.000 79111 82314

011-003 1/8/25 0.10 B1831 BLDG CONT 0.001 2.000 79111 82314

011-004 1/8/25 5.00 A1826 BLDG GRND 0.001 25.000 79111 82314

2/4/25 9:21 AM 2 / 9

LOCATIO MEASURE

DATE

MEASURE

VALUE

POINT

NUM

POINT NAME LOWER

LIMIT

UPPER

LIMIT

INSTRU

#1

INSTRU

#2

011-004 1/8/25 0.10 B1826 BLDG CONT 0.001 2.000 79111 82314

011-005 1/8/25 4.90 A1827 BLDG GRND 0.001 25.000 79111 82314

011-005 1/8/25 0.10 B1827 BLDG CONT 0.001 2.000 79111 82314

011-006 1/8/25 6.30 A1824 BLDG GRND 0.001 25.000 79111 82314

011-006 1/8/25 0.10 B1824 BLDG CONT 0.001 2.000 79111 82314

011-007 1/8/25 6.20 A1825 BLDG GRND 0.001 25.000 79111 82314

011-007 1/8/25 0.10 B1825 BLDG CONT 0.001 2.000 79111 82314

011-008 1/8/25 5.50 A1822 BLDG GRND 0.001 25.000 79111 82314

011-008 1/8/25 0.10 B1822 BLDG CONT 0.001 2.000 79111 82314

011-009 1/8/25 6.60 A1823 BLDG GRND 0.001 25.000 79111 82314

011-009 1/8/25 0.10 B1823 BLDG CONT 0.001 2.000 79111 82314

011-010 1/8/25 5.10 A1820 BLDG GRND 0.001 25.000 79111 82314

011-010 1/8/25 0.10 B1820 BLDG CONT 0.001 2.000 79111 82314

011-011 1/8/25 4.40 A1821 BLDG GRND 0.001 25.000 79111 82314

011-011 1/8/25 0.10 B1821 BLDG CONT 0.001 2.000 79111 82314

011-012 1/9/25 6.40 A1818 BLDG GRND 0.001 25.000 79111 82314

011-012 1/9/25 0.10 B1818 BLDG CONT 0.001 2.000 79111 82314

011-013 1/9/25 5.90 A1819 BLDG GRND 0.001 25.000 79111 82314

011-013 1/9/25 0.10 B1819 BLDG CONT 0.001 2.000 79111 82314

011-014 1/9/25 5.70 A1815 BLDG GRND 0.001 25.000 79111 82314

011-014 1/9/25 0.10 B1815 BLDG CONT 0.001 2.000 79111 82314

011-015 1/9/25 5.60 A1816 BLDG GRND 0.001 25.000 79111 82314

011-015 1/9/25 0.10 B1816 BLDG CONT 0.001 2.000 79111 82314

011-016 1/8/25 5.80 A1817 BLDG GRND 0.001 25.000 79111 82314

011-016 1/8/25 0.10 B1817 BLDG CONT 0.001 2.000 79111 82314

011-017 1/9/25 6.40 A1813 BLDG GRND 0.001 25.000 79111 82314

011-017 1/9/25 0.10 B1813 BLDG CONT 0.001 2.000 79111 82314

011-018 1/13/25 6.30 A1814 BLDG GRND 0.001 25.000 79111 82314

011-018 1/13/25 0.10 B1814 BLDG CONT 0.001 2.000 79111 82314

011-019 1/13/25 5.30 A1811 BLDG GRND 0.001 25.000 79111 82314

011-019 1/13/25 0.10 B1811 BLDG CONT 0.001 2.000 79111 82314

011-020 1/13/25 5.70 A1812 BLDG GRND 0.001 25.000 79111 82314

011-020 1/13/25 0.10 B1812 BLDG CONT 0.001 2.000 79111 82314

012-001 1/13/25 5.90 A1808 BLDG GRND 0.001 25.000 79111 82314

012-001 1/13/25 0.10 B1808 BLDG CONT 0.001 2.000 79111 82314

012-002 1/13/25 6.10 A1809 BLDG GRND 0.001 25.000 79111 82314

012-002 1/13/25 0.10 B1809 BLDG CONT 0.001 2.000 79111 82314

2/4/25 9:21 AM 3 / 9

LOCATIO MEASURE

DATE

MEASURE

VALUE

POINT

NUM

POINT NAME LOWER

LIMIT

UPPER

LIMIT

INSTRU

#1

INSTRU

#2

012-003 1/14/25 4.70 A1810 BLDG GRND 0.001 25.000 79111 82314

012-003 1/14/25 0.10 B1810 BLDG CONT 0.001 2.000 79111 82314

012-004 1/14/25 5.50 A1806 BLDG GRND 0.001 25.000 79111 82314

012-004 1/14/25 0.10 B1806 BLDG CONT 0.001 2.000 79111 82314

012-005 1/14/25 5.80 A1807 BLDG GRND 0.001 25.000 79111 82314

012-005 1/14/25 0.10 B1807 BLDG CONT 0.001 2.000 79111 82314

012-006 1/14/25 6.40 A1804 BLDG GRND 0.001 25.000 79111 82314

012-006 1/14/25 0.10 B1804 BLDG CONT 0.001 2.000 79111 82314

012-007 1/14/25 6.40 A1805 BLDG GRND 0.001 25.000 79111 82314

012-007 1/14/25 0.10 B1805 BLDG CONT 0.001 2.000 79111 82314

012-008 1/14/25 6.80 A1802 BLDG GRND 0.001 25.000 79111 82314

012-008 1/14/25 0.10 B1802 BLDG CONT 0.001 2.000 79111 82314

012-009 1/15/25 6.20 A1803 BLDG GRND 0.001 25.000 79111 82314

012-009 1/15/25 0.10 B1803 BLDG CONT 0.001 2.000 79111 82314

012-010 1/15/25 5.60 A1800 BLDG GRND 0.001 25.000 79111 82314

012-010 1/15/25 0.10 B1800 BLDG CONT 0.001 2.000 79111 82314

012-011 1/15/25 6.30 A1801 BLDG GRND 0.001 25.000 79111 82314

012-011 1/15/25 0.10 B1801 BLDG CONT 0.001 2.000 79111 82314

012-012 1/15/25 5.80 A1798 BLDG GRND 0.001 25.000 79111 82314

012-012 1/15/25 0.10 B1798 BLDG CONT 0.001 2.000 79111 82314

012-013 1/20/25 4.60 A1799 BLDG GRND 0.001 25.000 79111 82314

012-013 1/20/25 0.10 B1799 BLDG CONT 0.001 2.000 79111 82314

012-014 1/20/25 2.90 A1795 BLDG GRND 0.001 25.000 79111 82314

012-014 1/20/25 0.10 B1795 BLDG CONT 0.001 2.000 79111 82314

012-015 1/20/25 3.00 A1796 BLDG GRND 0.001 25.000 79111 82314

012-015 1/20/25 0.10 B1796 BLDG CONT 0.001 2.000 79111 82314

012-016 1/20/25 4.80 A1797 BLDG GRND 0.001 25.000 79111 82314

012-016 1/20/25 0.10 B1797 BLDG CONT 0.001 2.000 79111 82314

012-017 1/20/25 4.80 A1793 BLDG GRND 0.001 25.000 79111 82314

012-017 1/20/25 0.10 B1793 BLDG CONT 0.001 2.000 79111 82314

012-018 1/20/25 4.50 A1794 BLDG GRND 0.001 25.000 79111 82314

012-018 1/20/25 0.10 B1794 BLDG CONT 0.001 2.000 79111 82314

012-019 1/20/25 5.30 A1791 BLDG GRND 0.001 25.000 79111 82314

012-019 1/20/25 0.10 B1791 BLDG CONT 0.001 2.000 79111 82314

012-020 1/20/25 6.80 A1792 BLDG GRND 0.001 25.000 79111 82314

012-020 1/20/25 0.10 B1792 BLDG CONT 0.001 2.000 79111 82314

013-001 1/20/25 2.80 A1788 BLDG GRND 0.001 25.000 79111 82314

2/4/25 9:21 AM 4 / 9

LOCATIO MEASURE

DATE

MEASURE

VALUE

POINT

NUM

POINT NAME LOWER

LIMIT

UPPER

LIMIT

INSTRU

#1

INSTRU

#2

013-001 1/20/25 0.10 B1788 BLDG CONT 0.001 2.000 79111 82314

013-002 1/20/25 3.00 A1789 BLDG GRND 0.001 25.000 79111 82314

013-002 1/20/25 0.10 B1789 BLDG CONT 0.001 2.000 79111 82314

013-007 1/21/25 3.30 A1785 BLDG GRND 0.001 25.000 79111 82314

013-007 1/21/25 0.10 B1785 BLDG CONT 0.001 2.000 79111 82314

013-009 1/21/25 3.40 A1783 BLDG GRND 0.001 25.000 79111 82314

013-009 1/21/25 0.10 B1783 BLDG CONT 0.001 2.000 79111 82314

013-011 1/21/25 3.50 A1781 BLDG GRND 0.001 25.000 79111 82314

013-011 1/21/25 0.10 B1781 BLDG CONT 0.001 2.000 79111 82314

014-007 1/21/25 4.60 A1765 BLDG GRND 0.001 25.000 79111 82314

014-007 1/21/25 0.10 B1765 BLDG CONT 0.001 2.000 79111 82314

014-008 1/21/25 2.90 A1762 BLDG GRND 0.001 25.000 79111 82314

014-008 1/21/25 0.10 B1762 BLDG CONT 0.001 2.000 79111 82314

014-009 1/21/25 3.00 A1763 BLDG GRND 0.001 25.000 79111 82314

014-009 1/21/25 0.10 B1763 BLDG CONT 0.001 2.000 79111 82314

014-011 1/21/25 4.70 A1761 BLDG GRND 0.001 25.000 79111 82314

014-011 1/21/25 0.10 B1761 BLDG CONT 0.001 2.000 79111 82314

014-014 1/21/25 4.50 A1755 BLDG GRND 0.001 25.000 79111 82314

014-014 1/21/25 0.10 B1755 BLDG CONT 0.001 2.000 79111 82314

014-015 1/21/25 5.30 A1756 BLDG GRND 0.001 25.000 79111 82314

014-015 1/21/25 0.10 B1756 BLDG CONT 0.001 2.000 79111 82314

014-017 1/21/25 5.80 A1753 BLDG GRND 0.001 25.000 79111 82314

014-017 1/21/25 0.10 B1753 BLDG CONT 0.001 2.000 79111 82314

041-002 1/22/25 5.90 A1022 BLDG GRND 0.001 25.000 79111 82314

041-002 1/22/25 0.10 B1022 BLDG CONT 0.001 2.000 79111 82314

041-011 1/21/25 5.90 A1013 BLDG GRND 0.001 25.000 79111 82314

041-011 1/21/25 0.10 B1013 BLDG CONT 0.001 2.000 79111 82314

062-001 1/22/25 8.00 A849 BLDG GRND 0.001 25.000 79111 82314

062-001 1/22/25 0.10 B849 BLDG CONT 0.001 2.000 79111 82314

062-006 1/22/25 12.30 A840 BLDG GRND 0.001 25.000 79111 82314

062-006 1/22/25 0.10 B840 BLDG CONT 0.001 2.000 79111 82314

062-007 1/22/25 7.40 A835 BLDG GRND 0.001 25.000 79111 82314

062-007 1/22/25 0.10 B835 BLDG CONT 0.001 2.000 79111 82314

063-004 1/22/25 6.00 A831 BLDG GRND 0.001 25.000 79111 82314

063-004 1/22/25 0.10 B831 BLDG CONT 0.001 2.000 79111 82314

064-005 1/22/25 6.00 A821 BLDG GRND 0.001 25.000 79111 82314

064-005 1/22/25 0.10 B821 BLDG CONT 0.001 2.000 79111 82314

2/4/25 9:21 AM 5 / 9

LOCATIO MEASURE

DATE

MEASURE

VALUE

POINT

NUM

POINT NAME LOWER

LIMIT

UPPER

LIMIT

INSTRU

#1

INSTRU

#2

064-006 1/22/25 6.10 A817 BLDG GRND 0.001 25.000 79111 82314

064-006 1/22/25 0.10 B817 BLDG CONT 0.001 2.000 79111 82314

064-008 1/22/25 7.20 A815 BLDG GRND 0.001 25.000 79111 82314

064-008 1/22/25 0.10 B815 BLDG CONT 0.001 2.000 79111 82314

064-010 1/22/25 7.30 A812 BLDG GRND 0.001 25.000 79111 82314

064-010 1/22/25 0.10 B812 BLDG CONT 0.001 2.000 79111 82314

065-005 1/22/25 6.70 A798 BLDG GRND 0.001 25.000 79111 82314

065-005 1/22/25 0.10 B798 BLDG CONT 0.001 2.000 79111 82314

067-003 1/22/25 5.80 A783 BLDG GRND 0.001 25.000 79111 82314

067-003 1/22/25 0.10 B783 BLDG CONT 0.001 2.000 79111 82314

# of Locations 79

2/4/25 9:21 AM 6 / 9

GROUNDING / STRUCTURAL VISUAL INSPECTION RESULTS

WONUM LOCATION INSPECTION NOTES DATE

620056 010-001 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/6/25

620057 010-002 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/6/25

620058 010-004 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/6/25

620059 010-006 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/6/25

620060 010-007 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/6/25

620061 010-008 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/6/25

620062 010-009 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/6/25

620063 010-011 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/6/25

620064 010-012 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/6/25

620065 010-014 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/6/25

620066 010-015 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/7/25

620067 010-017 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/7/25

620068 010-018 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/7/25

620069 010-019 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/7/25

620070 010-020 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/7/25

620071 011-001 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/7/25

620072 011-002 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/8/25

620073 011-003 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/8/25

620074 011-004 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/8/25

620075 011-005 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/8/25

620077 011-006 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/8/25

620076 011-007 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/8/25

620078 011-008 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/8/25

620079 011-009 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/8/25

620080 011-010 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/8/25

620081 011-011 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/8/25

620082 011-012 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/9/25

620083 011-013 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/9/25

620084 011-014 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/9/25

620085 011-015 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/9/25

620086 011-016 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/9/25

620087 011-017 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/9/25

620088 011-018 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/13/25

620089 011-019 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/13/25

620090 011-020 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/13/25

620091 012-001 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/13/25

620092 012-002 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/13/25

620093 012-003 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/14/25

2/4/25 9:21 AM 7 / 9

WONUM LOCATION INSPECTION NOTES DATE

620094 012-004 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/14/25

620095 012-005 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/14/25

620096 012-006 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/14/25

620097 012-007 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/14/25

620098 012-008 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/14/25

620099 012-009 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/15/25

620100 012-010 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/15/25

620101 012-011 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/15/25

620102 012-012 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/15/25

620103 012-013 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/20/25

620104 012-014 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/20/25

620105 012-015 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/20/25

620106 012-016 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/20/25

620107 012-017 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/20/25

620108 012-018 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/20/25

620109 012-019 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/20/25

620110 012-020 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/20/25

620111 013-001 MILT 1/20/25

620112 013-002 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/20/25

620008 013-004 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620133 013-007 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/21/25

620113 013-009 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/21/25

620114 013-011 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/21/25

620009 013-015 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620010 013-019 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620011 014-006 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620115 014-007 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/21/25

620134 014-008 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/21/25

620116 014-009 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/21/25

620117 014-011 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/21/25

620118 014-014 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/21/25

620119 014-015 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/21/25

620120 014-017 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/21/25

620121 041-002 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

620122 041-011 BROKEN DOOR GROUND - 624996 1/21/25

620012 061-001 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620013 061-003 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620014 061-004 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

2/4/25 9:21 AM 8 / 9

WONUM LOCATION INSPECTION NOTES DATE

620015 061-005 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620016 061-006 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620017 061-007 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620018 061-008 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620019 061-009 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620020 061-010 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620021 061-011 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620022 061-012 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620023 061-013 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620024 061-014 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620025 061-015 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/23/25

620123 062-001 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

620026 062-002 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620027 062-003 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620028 062-004 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620029 062-005 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620124 062-006 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

620125 062-007 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

620030 063-001 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620031 063-002 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620032 063-003 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620126 063-004 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

620033 063-005 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620034 063-006 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620035 063-007 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620036 064-001 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620037 064-002 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/27/25

620038 064-003 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/28/25

620039 064-004 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/28/25

620127 064-005 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

620128 064-006 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

620040 064-007 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/28/25

620129 064-008 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

620041 064-009 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/28/25

620130 064-010 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

620042 064-011 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/28/25

620043 064-012 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/28/25

620044 064-013 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/28/25

2/4/25 9:21 AM 9 / 9

WONUM LOCATION INSPECTION NOTES DATE

620045 064-014 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/28/25

620046 064-015 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/28/25

620047 065-001 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/29/25

620048 065-002 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/29/25

620049 065-003 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/29/25

620050 065-004 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/29/25

620131 065-005 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

620051 065-006 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/29/25

620052 065-007 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/29/25

620053 066-003 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/29/25

620054 066-004 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/29/25

620055 066-005 LPS VISUAL GROUNDING AND STRUCTURAL PM 1/29/25

620132 067-003 BUILDING STRUCTURAL & GROUNDING (PHYSICAL) PM 1/22/25

# of Work Orders 127