Performance-Based Work Statement for

Honeywell Engineering Services

Date:

Eng Services-PWS-22-0001

Approved by:

Prepared by: AFSC/GUMB Tinker AFB

DISTRIBUTION STATEMENT D: Distribution authorized to U.S. Government Agencies and their contractors (Critical Technical). Other requests for this document shall be referred to AFSC/GUMB. Questions concerning the technical content should be directed to

AFSC/GUMB.

HANDLING AND DESTRUCTION NOTICE: Comply with distribution statement and destroy by any method that will prevent disclosure of the contents or reconstruction of the document.

DISTRIBUTION STATEMENT D: Distribution authorized to U.S. Government Agencies and their contractors (Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

Air Force Sustainment Center

Engineering & Technical Management Directorate

Table of Contents 1 Description of Services

1.1 Objective(s)

1.2 Benefit to United States Air Force

1.3 Background

1.4 EECP General Information

1.5 Non-Personal Services

2 Services Summary

3 Government Property and Services

3.1 Government Property

3.1.1 Contractor Responsibility

3.2 Government Property to be Provided

3.2.1 Government-Furnished Equipment

3.2.2 Government-Furnished Information

3.3 Applicable Documents

3.4 Base Support

3.5 Reporting of Government Property

3.6 Loss of Government Property

3.7 Return/Retention of Government Property

3.7.1 Property of the Government

3.7.2 Material Generated

3.7.3 For Specific Contract Types

3.8 Government System(s)

4 Technical Requirements

4.1 Period and Place of Performance

4.1.1 Contract/TO Period of Performance

4.1.2 Place of Performance

4.2 Duty Hours

4.3 Holidays and facility closings

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

4.4 Contract Data Requirements List

4.4.1 Quarterly Status Report

4.4.2 TO-Specific CDRL Requirements

4.4.3 Technical Error

4.5 Item Unique Identification

4.5.1 Item Identification and Valuation

4.5.2 Contractor Markings

4.5.3 IUID Registry Update

4.6 Packaging

4.7 Counterfeit Electronic Parts

4.8 Travel

4.9 Technical Requirement Details

4.9.1 Aircraft Integrity Program Support

4.9.1.1 Aircraft Structural Integrity Program

4.9.1.2 Avionics/Electronics Integrity Program

4.9.1.3 Mechanical Equipment and Subsystems Integrity Program

4.9.2 Reliability-Centered Maintenance

4.9.3 Maintenance Steering Group

4.9.4 Data Mining/Trend Identification

4.9.5 Structural Engineering Support

4.9.6 Prototype Design Engineering

4.9.7 Reverse Engineering

4.9.8 NDI Support

4.9.9 Supportability Improvement

4.9.10 Software Development and Cyber Security

4.9.11 Technology Insertion

4.9.12 Development and Sustainment of Aircraft Tools

4.9.13 Reliability/Maintainability Engineering

4.9.14 Industrial Engineering

4.9.15 Aerospace Engineering

4.9.16 Electrical Engineering

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

4.9.17 Human Factors Engineering

4.9.18 Test and Evaluation

4.9.19 Maintenance Engineering Support

4.9.20 Modeling, Simulation, and Optimization

4.9.21 Energy Management

4.9.22 Operational Safety, Suitability, and Effectiveness

4.9.23 Fleet Management

4.9.24 Specialized Studies

4.10 Program Management

4.11 Quality Control Provisions

4.12 Meetings and Reviews

4.13 Display of ID Badges

4.14 Removal of Contractor Personnel

4.15 Access to Government Systems

4.16 Copyright Considerations

5 General Information

5.1 Continuation of Mission-Essential Services during a Crisis

5.2 Security Requirements

5.2.1 Classified or Controlled Unclassified Information

5.2.2 Protection of Government Information

5.2.3 Security Regulations

5.2.3.1 Physical Security

5.2.4 Operations Security

5.2.5 Communications Security

5.2.6 Security Clearance

5.2.6.1 Security Clearance Requirement

5.2.6.2 Security Requirements that Exceed Those of the DD Form 254

5.2.6.3 Work Performed on the EECP

5.2.7 Security Incident or Violation

5.2.8 Security of Contractor System(s)

5.2.9 Access to Government Facility or Military Installation

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

5.2.10 Requirements for a Common Access Card

5.3 Environmental Management System

5.3.1 Subcontractor EMS requirements

5.4 Affirmative Procurement Programs

5.5 Safety Requirements

5.5.1 Contractor Compliance

5.5.1.1 Contractor Safety Compliance

5.5.2 Safety and Environmental

5.5.3 Mishap Notification/Investigation

5.5.4 Safety and Health Plan

5.5.4.1 Submission and Approval

5.5.4.2 Revisions

5.5.4.3 Subcontractor Compliance

5.5.5 Voluntary Protection Program

5.6 Inspection of Services

5.7 Contractor Manpower Reporting

5.7.1 Record for the Contract/TO

5.7.2 Contractor Inventory

5.7.3 Contractor Labor Hours

5.8 Invoicing/Payment and Receipt/Acceptance

5.9 Trafficking in Persons

6 Quality Assurance

6.1 Monitor the Contractor's Performance

7 Appendices

7.1 Appendix A: References

8 Definitions and Acronyms

8.1 Definitions

8.2 Acronyms

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

1 Description of Services This Indefinite Delivery Indefinite Quantity (IDIQ) Performance-Based Work Statement (PWS) and subsequent delivery orders (DOs) will supplement Tinker Air Force Base (TAFB) essential engineering capabilities to include, but are not limited to Integrity Program Support (e.g., ASIP, AVIP, MECSIP); Reliability-Centered Maintenance (RCM); Maintenance Steering Group (MSG- 3); Data Mining/Trend Identification; Structural Engineering Support; Mechanical/Electronic Prototype Design Engineering; Mechanical/Electronic/Software Reverse Engineering; Non-destructive Inspection (NDI) Support; Supportability Improvement; Software Development and Cyber Security; Technology Insertion; Development and Sustainment of Aircraft Tools;

Reliability/Maintainability Engineering; Industrial Engineering; Aerospace Engineering;

Electrical Engineering; Human Factors Engineering; Test and Evaluation; Maintenance Engineering Support; Modeling, Simulation, and Optimization; Energy Management; Operational Safety, Suitability, and Effectiveness (OSS&E); Fleet Management; and Specialized Studies. The Contractor shall perform studies, analyses, and engineering and document the results in accordance with individual TOs.

The Contractor shall provide engineering support for the NSNs identified on the contract to resolve shortfalls and deficiencies concerning safety, supportability, reliability, availability, and maintainability. Engineering efforts may include, but are not limited to: identifying and correcting obsolete parts and Diminishing Manufacturing Sources and Material Shortages (DMSMS) Health Analysis Report (DI-MGMT- 81900), performing engineering analysis, mishap/safety investigations, prototyping, assess and resolve materiel deficiencies, reverse engineering, modeling, simulation, and providing engineering data. Requirements will be detailed and cited in mutually agreed upon separately funded task orders accompanied by applicable documents.

1.1 Objective(s)

The objectives of this PWS fully support the fundamental and overarching objective of providing technological, supportable products and services to the warfighter. A continuing, structured, and systematic approach for essential engineering support is critical to the Hill, Robins and Tinker AFB mission and will be affected through this PWS. Additionally, the objective of the Essential Engineering Capability Program (EECP) is to provide mission essential engineering support capabilities for all bases mentioned. TOs shall be used to provide technically competent, rapidly responding engineering support for Air Force weapon systems and platforms.

An additional advantage of this effort is to provide unbiased, independent, rapid, non-product affiliated essential engineering and research services. The Contractor will perform tasks identified to insert new supportable technologies, products, or processes to improve weapon system availability and reduce operating costs.

This PWS describes the basic requirements that shall apply to the individual TOs that are placed under the EECP Program. The applicability of these requirements and any other specific requirements shall be set forth in each individual TO.

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

1.2 Benefit to United States Air Force

This acquisition will benefit the USAF by providing specialized engineering and research services required to solve complex technical warfighter problems. These actions enhance organic capabilities with technically competent, rapidly responding resources. This effort will enable mission success by providing supportable technologies, products, or processes to improve weapon system availability and reduce operating costs.

1.3 Background

A strategic reserve of technical expertise and engineering presence is invaluable to the Air Force’s engineering workforce and the programs they support. Without this assistance to accomplish the aforementioned tasks, the war fighter’s mission would be gravely impacted. As an outcome of a Command-level reorganization, the majority of the engineering division positions were eliminated or realigned to specific individual offices within AFLCMC and AFSC. Whereas these services were previously available to all stakeholders, they now reside in specific programs and are not generally accessible to other organizations at Hill, Robins and Tinker. In addition, availability of essential engineering skills is limited due to the lack of specialized skills available. This environment has reinforced the need for a technically competent, rapidly responding supplemental workforce knowledgeable of existing military weapon systems and platforms in close proximity to ALCs. This source must be capable of providing timely, integrated engineering solutions to difficult technical challenges. The operational environment will not accommodate the timeframe necessary for the development of an alternative engineering capability when a problem develops.

It is essential to maintain this engineering capability at the Air Force for continuity, dependability, and follow-on work since a loss of this rapid response capability to respond to warfighter requirements would adversely impact the Air Force mission.

While the EECP IDIQ contract is specifically established within the Air Force Materiel Command (AFMC), this contract vehicle may be used by other Air Force organizations, Services, and Department of Defense (DoD) agencies.

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

1.4 EECP General Information

The EECP shall be executed on a DO basis with each DO being a stand-alone effort with unique requirements, period of performance, funding, and deliverables.

If there is a conflict between the IDIQ PWS and the DO PWS, the DO PWS shall take precedence.

Funding is not provided for the EECP basic contract PWS. Rather, all funding is provided through the issuance of subsequent DOs.

1.5 Non-Personal Services

This contract is a “non-personal services contract” as defined in Federal Acquisition Regulation (FAR) 37.101. Therefore, it is understood and agreed that:

a. The Contractor shall perform the services specified herein as an independent contractor, not as employees of the Government;

b. The Contractor shall manage and administer the work required and bear sole responsibility for complying with any and all technical, schedule, or financial requirements or constraints attendant to the performance of this contract;

c. The Contractor shall be free from supervision or control by any Government employee with respect to the manner or method of performance of the services specified; but,

d. The Contractor shall comply with the terms and conditions of the basic contract and each DO.

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

2 Services Summary Performance Objective PWS Reference Performance Threshold

Promptly provide accurate Quarterly Status Report

4.4.1 Data submissions shall be timely, accurate.

and comprehensive with no more than one (1) data submission received late during each contract year and no late submissions in consecutive quarters. No report shall be received later than five (5) business days after its scheduled submission date. Any mandatory rewrites shall be due within five

(5) business days after the Government’s identification of error(s).

Security Requirements 4.0 – 5.2.10 All security requirements met 100% of the time at the order level.

Establish and Maintain Contractor Manpower Reporting

5.8 – 5.8.3 Within 30 calendar days of contract/DO award, the Contractor shall establish a record for the contract/DO in eCMRA including Order Data, Contract Data, and Location Data and submit the annual report no later than October 31 of the following fiscal year.

NOTE: The Government will include a detailed Service Summary in each DO.

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

3 Government Property and Services

3.1 Government Property

The Contractor shall ensure accurate control and accountability of all Government-Furnished Property (GFP) in accordance with Government regulations.

3.1.1 Contractor Responsibility

The Contractor shall be responsible for Government property in their possession in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract/DO.

3.2 Government Property to be Provided

No Government property will be provided at the basic contract level. GFP may be provided to support individual DOs. Any GFP to be provided to the Contractor will be identified in each DO and provided in accordance with the DO GFP attachment(s). The GFP clauses of the DO will be supplemented by specific delivery and disposition instructions provided in the corresponding individual DOs. Additionally, if Government facilities are provided, they will be specified in individual DOs. The designated Government DO manager will provide the Contractor access to all GFP as required to perform individual DOs. The Contractor shall manage all GFP in accordance with its approved Government Property System. At the end of the contract/DO, all GFP will revert to the Government.

3.2.1 Government-Furnished Equipment

Government-Furnished Equipment (GFE) may be provided to support individual DOs. In such cases, the GFE clauses of the DO will be supplemented by specific delivery and disposition instructions provided in the corresponding individual DOs. Additionally, if Government facilities are provided, they will be specified in individual DOs. The designated Government DO manager will provide the Contractor access to all GFE as required to perform individual DOs. At the end of the contract/DO, all GFE will revert to the Government.

3.2.2 Government-Furnished Information

Unless otherwise indicated, the Government will furnish or make available to the Contractor any documentation required to support performance on a DO basis under this contract. The designated Government DO manager will provide the Contractor access to all Government-Furnished Information (GFI) as required to perform individual TOs. At the end of the contract/DO, all GFI will revert to the Government.

3.3 Applicable Documents

Applicable publications, directives, handbooks, and standards provide guidance and direction in performance of the requirements. Applicable publications, directives, and/or standards will be specified within each DO and the Contractor shall comply with the most current version of any applicable document. Unless otherwise specified, the issue of these documents is those listed in the effective Department of Defense Index of Specifications and Standards, maintained online at http://www.dtic.mil/whs/directives. In the event of a conflict between this PWS and any document http://www.dtic.mil/whs/directives

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

referred to herein, the requirements of this PWS shall prevail unless the document is mandated by law.

The Contractor shall be responsible for notifying the Government contracting officer (CO) in writing within 30 days of publication revisions/changes/supplements if there is any impact on the scope of work to be performed under this contract or any DO.

3.4 Base Support

If base support is required, it will be identified in the individual DO. The Government will furnish property incidental to the place of performance including office space and equipment, i.e., computer equipment, software, output device(s), phone/phone line, facsimile equipment, reproduction equipment, and office supplies in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract/DO.

3.5 Reporting of Government Property

The Contractor shall create and maintain records of all Government property accountable to the contract/DO, including GFP and Contractor-Acquired Property (CAP) in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract/DO.

3.6 Loss of Government Property

If there is any loss of Government property, the Contractor shall report the loss of Government property in the Government-Furnished Property (GFP) Modules of the Procurement Integrated Enterprise Environment (PIEE), in lieu of Defense Contract Management Agency (DCMA) eTool software application in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract/DO. The reporting requirement does not change any liability provisions or other reporting requirements that may exist under the contract/DO.

3.7 Return/Retention of Government Property

3.7.1 Property of the Government

All property provided by the Government remains the property of the Government and shall be returned to the Government upon completion of the contract/DO unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successive contract/DO. Retention of the property by the Contractor will require modification of both losing and gaining contracts in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract/DO. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO.

3.7.2 Material Generated

All material generated under the contract/DO becomes the property of the Government and shall be returned to the Government upon completion of the contract/DO. All Department of Defense

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

DD Form 1423-1s, Contract Data Requirements List (CDRL) items, and deliverables become the property of the Government upon receipt.

3.7.3 For Specific Contract Types

For cost type and time-and-material contracts, the Government obtains title to CAP acquired or fabricated by the Contractor to perform tasks under the contract in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract/DO. CAP shall be returned to the Government upon completion of the contract/DO unless retained by the Contractor for continued use under a successive contract/DO. If retained by the Contractor for a successive contract, CAP becomes GFP added to the successive contract by modification of both losing and gaining contracts in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract/DO.

3.8 Government System(s)

Access to Government system(s) required to perform tasks under DOs, if applicable, will be defined in each individual DO. The Government will provide Contractor personnel access to the system(s) necessary to perform tasks under individual DOs.

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

4 Technical Requirements The objectives and requirements identified within this PWS are described in general terms. Each DO will address specific task requirements, scheduling, and other related performance criteria, as applicable.

The EECP will provide a variety of engineering, scientific, and technical capabilities to support the Government's current organic resources. This support includes, but is not limited to, providing disciplined engineering, research, scientific, and technical studies and support using established industry best practices.

The Contractor shall utilize a combination of the appropriate level of engineering, scientific, and sustainment technical staff for the period identified in each DO. The contractor shall maximize the use of Engineering Interns to reduce DO labor costs, provide best value to the government, and train a local nucleus of talent to support future government requirements. The contractor shall utilize the support of other subject matter experts as required to meet any specialized needs of individual DOs.

The Contractor shall provide all supervision, personnel, equipment, supplies, facilities, regional transportation, tools, materials, training, technical and analytical support, and supply chain management necessary to perform the EECP as defined in this PWS and subsequent DOs, except for those items specified as GFI, GFP, and GFE or as otherwise specified in an individual DO.

The contractor shall possess and maintain a SECRET facility clearance from the Defense Security Service. The Contractor’s employees, when performing classified work in support of this contract shall have been granted a SECRET security clearance from the Defense Industrial Security Clearance Office. A DD 254 will be provided for each DO as required.

4.1 Period and Place of Performance

4.1.1 Contract/TO Period of Performance

The period of performance for the basic EECP IDIQ is forty-eight (48) months. The period and place of performance for each task will be specified in each DO. The Contractor shall provide all facilities, including office space, classified and unclassified storage, utilities, materials, equipment (all computer hardware), and any other property necessary and sufficient for any DO not taking place onsite at a Government location, unless otherwise specified in the DO.

4.1.2 Place of Performance

These services will be performed at the Contractor’s location and/or at a Government facility, as determined by individual DOs.

4.2 Duty Hours

Normal core duty hours are Monday through Friday, 0800-1500 local time for the organization being supported. Contractor personnel shall be available during core hours. In the event of a surge in requirements to support DoD mission activities, the Contractor may be called upon for performance outside of core hours to support Government objectives/missions. In that event, the

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

Contractor will be notified by the Government CO concerning the additional performance requirements.

4.3 Holidays and facility closings

Unless otherwise stated in a DO, the Contractor shall observe Federal holidays and shall otherwise conduct business Monday through Friday of each week. The Contractor shall observe any Federal holiday that falls on a weekend in accordance with the Government's observation of that holiday.

Contractor personnel will only be permitted access to Government facilities when Government personnel are present.

The following Federal holidays are observed under this contract

Holidays Dates New Year’s Day 01 January

Martin Luther King Third Monday of January President’s Day Third Monday of February Memorial Day Last Monday in May

Independence Day 04 July Labor Day First Monday in September

Columbus Day Second Monday in October Veteran's Day 11 November

Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

4.4 Contract Data Requirements List

The Contractor shall deliver all data/reports associated with all Contract Data Requirements Lists (CDRLs) required at both the basic contract level and as required by each DO.

4.4.1 Quarterly Status Report

The Contractor shall submit Quarterly Status Reports (QSRs). QSRs will be in Contractor format.

The Contractor shall provide a summary and status of work being performed during the reporting period to include, but not limited to: Contract Number, Award Date, Contract Value, Period of Performance, Funded to Date, Funds Expended to Date (Burn Rate), and Project Status (brief synopsis of efforts with the project). The last status report shall include any analysis not previously delivered under a separate CDRL. The QSR shall be delivered no later than the 15th of each month it is due. The contractor’s report shall be complete and accurate. The number of report rejections shall not exceed one per contract year. The contractor shall have five working days to correct identified deficiencies after receipt of a Government rejection letter. (CDRL A001, DI- MGMT-80368A, Status Report)

4.4.2 TO-Specific CDRL Requirements

Each DO will provide all DO-specific CDRL requirements including where and how they are to be delivered. The deliverables will be accepted, rejected, or require correction of any deficiencies

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

found. In the event of rejection of any deliverable, the Contractor will be notified in writing by the contracting officer of the specific corrective action needed. All deficiencies must be rectified within the DO period of performance.

4.4.3 Technical Error

A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS, or contract/DO. A minor error is defined as a typographical or grammatical error. A rejected deliverable shall be corrected and resubmitted within number of days specified in the associated DD Form 1423 instructions/requirements. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date accepted by the Government.

4.5 Item Unique Identification

Item Unique Identification (IUID), when required, will be specified by and will apply to the Task Order Level.

4.5.1 Item Identification and Valuation

IUID is a method of marking items with unique item identifiers, which have machine-readable data elements. IUID is required for all items to be delivered to the DoD that meet the criteria established in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract/DO.

4.5.2 Contractor Markings

The Contractor shall mark items in accordance with contract clauses and Military Standard MIL- STD-130N, Identification Marking of U.S. Military Property.

4.5.3 IUID Registry Update

In accordance with the Department of Defense Guide to Uniquely Identifying Items Assuring Valuation, Accountability, and Control of Government Property, the Government agent or Contractor representative that is responsible for causing “life cycle events” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged

– sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update applicable item record(s) in the IUID Registry.

4.6 Packaging

Packaging, when required, will be specified by and will apply to individual DOs.

The Contractor shall package and mark material in accordance with the contract/DO in accordance with the attached AFMC Form 158, Packaging Requirements. The Contractor shall ensure that classified material is packaged, marked, and delivered in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). The Contractor shall

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

package and mark material in accordance with other applicable Government regulations including, but not limited to, those regarding security, safety, and environmental concerns.

The Contractor shall package and mark material for movement, shipment, receipt, and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination. The Contractor shall package electronic parts susceptible to electrostatic discharge damage in accordance with MIL-STD-1686C, Electrostatic Discharge Control Program For Protection Of Electrical And Electronic Parts, Assemblies And Equipment (Excluding Electrically Initiated Explosive Devices), and MIL-HDBK-263B, Electrostatic Discharge (ESD) Control Handbook For Protection Of Electrical And Electronic Parts, Assemblies, And Equipment (Excluding Electrically Initiated Explosive Devices).

In accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging, shipping containers received, which meet the requirements of the AFMC Form 158 and are suitable for return shipment of serviceable assets, shall be reclaimed and stored for reutilization. Unsuitable shipping containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158.

4.7 Counterfeit Electronic Parts

Counterfeit Electronic Parts, when required, will be specified by and will apply to individual TOs.

The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit electronic parts being installed in end items or otherwise entering the USAF/DoD inventory.

The system shall incorporate processes/procedures to address the requirements listed in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract/DO. The Government's review of the Contractor’s system will be accomplished as part of the evaluation of the Contractor’s purchasing system in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract/DO.

4.8 Travel

Travel requirements will be specified by individual DOs. Travel requests for Contractor personnel shall be submitted for approval to the PCO prior to costs being incurred and a minimum of five business days in advance of departure. Travel by Contractor personnel shall be conducted in accordance with the Joint Travel Regulations (JTR), FAR, and applicable supplements and shall comply with all applicable guidance and clauses listed in the contract and individual DOs.

The Contractor shall be responsible for making travel and lodging arrangements as necessary to support the requirements of each DO.

4.9 Technical Requirement Details

4.9.1 Aircraft Integrity Program Support

The Air Force will operate its aircraft well beyond their original service lives. While structures and engines are known to be life limiting, other aircraft systems can limit life, pose safety risks, (Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

and affect availability, effectiveness, and cost. As our fleet continues to age, aircraft mission capable rates degrade and there is a potential for increased risk to safety of flight. This PWS addresses Aircraft Structural Integrity Program (ASIP), Avionics/Electronics Integrity Program (AVIP), and Mechanical Systems Integrity Program (MECSIP) for aircraft, weapon systems, and support systems.

4.9.1.1 Aircraft Structural Integrity Program

The Contractor shall perform the primary tasks associated with ASIP as described in the specific DO. They include but are not limited to

a. Establish, evaluate, and substantiate the structural integrity (airframe strength, rigidity, damage tolerance, and durability) of aircraft structures;

b. Acquire, evaluate, and apply operational usage data to provide a continual update of the structural integrity of operational aircraft;

c. Provide quantitative information for decisions on force structure planning, inspection, modification priorities, and related operational and support decisions; and,

d. Provide a basis for improving structural criteria and methods of design, evaluation, and substantiation for future aircraft systems and modifications.

The Contractor shall accomplish tasks identified in MIL-STD-1530D, Aircraft Structural Integrity Program (ASIP), as defined in specific DOs.

4.9.1.2 Avionics/Electronics Integrity Program

The Contractor shall perform AVIP tasks to improve the operational readiness and mission success of avionics and reduce demand for maintenance manpower and logistics support. The Contractor shall have expertise in avionics environmental design and qualification, equipment design for operational environments, equipment verification for operational environments, durability/life requirement assessment, the impact of lead-free and anti-tamper electronics, critical flight/safety functions and parts identification, and maintenance and inspection data analysis for actionable engineering recommendations to the government. The Contractor shall accomplish tasks identified in MIL-STD-1796A, Avionics Integrity Program (AVIP), as defined in specific TOs.

4.9.1.3 Mechanical Equipment and Subsystems Integrity Program The Contractor shall perform MECSIP tasks to assure the integrity, durability, safety, reliability, and supportability of subsystems and equipment are achieved in development and maintenance throughout the operational service life. The Contractor shall understand failure processes and consequences to operational life and understand total system operational and support needs to include service life and operating environments. The Contractor shall conduct early trade studies to evaluate operation and support factors, design usage, material characteristics, and operational limits. The Contractor shall develop maintenance and inspection requirements and provide recommendations to the government to improve system supportability. The Contractor shall accomplish tasks identified in MIL-STD-1798C, Mechanical Equipment and Subsystems Integrity Program, as defined in specific DOs.

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

4.9.2 Reliability-Centered Maintenance

The Contractor shall perform RCM tasks to determine total maintenance requirements for organizational, intermediate, and depot levels of maintenance. The Contractor shall develop corrective and preventive equipment maintenance procedures for weapon systems within the planned Air Force maintenance management system. The Contractor shall develop maintenance procedures for inclusion in class maintenance plans at the organizational, intermediate, and depot level. The Contractor shall apply detailed Failure Mode Effects Criticality Analysis (FMECA), maintenance repair data analysis, and user/maintainer input and cost data to best meet safety and mission requirements. The Contractor shall provide data visualization tools to display RCM analyses and recommendations for government review and approval. The Contractor shall retain engineering and weapon system maintenance expertise as required to support Reliability Assessment Team activities. The Contractor shall accomplish tasks identified in MIL- STD-3034A, Reliability-Centered Maintenance (RCM) Process, as defined in specific DOs.

4.9.3 Maintenance Steering Group

The Contractor shall perform MSG-3 tasks to improve aircraft safety and address hidden functional failures. The Contractor shall ensure that maintenance-significant items are addressed at the system level to improve maintenance efficiency and eliminate redundant tasks. The Contractor shall capture savings in maintenance man-hours, materials, and tooling to substantiate all recommendations to the government. The Contractor shall provide data visualization tools to display MSG-3 analyses and recommendations for government review and approval. The Contractor shall accomplish MSG-3 tasks in accordance with Airlines for America (A4A) Operator/Manufacturer Scheduled Maintenance Development v2011.1, as defined in specific DOs.

4.9.4 Data Mining/Trend Identification

The Contractor shall perform data mining/trend identification to extract hidden predictive information from large databases to improve weapon system supportability and reduce operating costs. The Contractor shall have knowledge of government databases and apply search tools as required to analyze data and provide actionable recommendations to the government. The Contractor shall accomplish data mining/trend identification tasks as defined in specific DOs.

4.9.5 Structural Engineering Support

The Contractor shall perform structural engineering support to include both material strength testing and nondestructive evaluation. This structural engineering support may include coupon, component, and fastener level tests. Coupon testing may include shear, elastic and shear modulus, and tensile and compressive strength on any shape/specimen. Additionally, the contractor will have the ability to characterize composite layups and sandwich panels to include constituent material properties using combinations of tensile, direct shear, and flexural beam testing to ASTM standards. The contractor will maintain NDI Level III certified personnel in all five NDI techniques to support structural engineering TOs. The Contractor shall accomplish tasks associated with structural engineering support as defined in specific DOs.

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

4.9.6 Prototype Design Engineering

The Contractor shall provide mechanical/electronic/software engineering to the design and development of prototypes as specified in TO requirements. The prototype design/development effort shall produce a form, fit, function, and interface compatible item and include the delivery of technical data in accordance with TO requirements. The contractor shall maintain in-house mechanical/electronic/software test equipment and tools to support DO requirements.

The Contractor shall accomplish tasks associated with prototyping (mechanical/electronic/software) as defined in specific DOs.

4.9.7 Reverse Engineering

The Contractor shall perform mechanical/electronic/software reverse engineering tasks to address obsolescence, diminishing manufacturing sources, and shortfalls in technical data. The Contractor shall have capability to apply 3-D coordinate measuring machines, electronic/mechanical computer aided software design tools, and software/firmware development environments to develop re-procurement data packages to support critical part needs. The Contractor shall have the electronic/mechanical test and measurement equipment and software tools to characterize electronic/avionic assemblies and derive the requirements to support design and development of the replacement item. The Contractor shall accomplish tasks associated with reverse engineering (mechanical/electronic/software) as defined in specific DOs.

4.9.8 NDI Support

The contractor shall maintain both advanced NDI technology and Level III certification in support of critical and routine customer requirements. The contractor shall maintain experience with eddy current, magnetic particle, liquid penetration, radiographic, and ultrasonic testing methods to accelerate inspection processes, collect/analyze data, and provide actionable information for engineers and maintenance personnel. The Contractor shall accomplish tasks identified in MIL-HDBK-6870B Inspection Program Requirements Nondestructive for Aircraft and Missile Materials and Parts, as defined in the specific DO. The Contractor shall accomplish tasks associated with NDI support as defined in specific DOs.

4.9.9 Supportability Improvement

The Contractor shall provide supportability improvement recommendations to improve weapon system and support equipment reliability and maintainability while reducing operating costs and risks. The Contractor shall provide engineering weapon system knowledge and maintenance expertise to conduct root cause analyses and provide actionable recommendations to the government. The Contractor shall accomplish tasks associated with supportability improvements as defined in specific DOs.

4.9.10 Software Development and Cyber Security

The contractor shall provide software development, support, and upgrades for operational flight programs, mission data, diagnostic systems, training systems, modeling/simulations tools, and other custom information technology software tools. The Contractor shall provide cyber security software support for network design, monitoring, and response for ensuring data security and

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

integrity. The Contractor shall provide cyber security software support for the Risk Management Framework, secure coding techniques, and system penetration testing. The contractor shall maintain Level III Capability Maturity Model Integration (CMMI) appraised software procedures and use agile software development processes to ensure requirements are thoroughly analyzed and test cases executed prior to fielding. The Contractor shall analyze and characterize information technology, and document and apply best practices when assessing and implementing information systems. The Contractor accomplish tasks associated with software development, support, and security as defined in specific DOs.

4.9.11 Technology Insertion

The Contractor shall integrate new technologies into current system architectures as specified by individual TOs. The Contractor shall apply a systems design approach to ensure that mission objectives and system criteria requirements are fulfilled. Emphasis shall be on open system architecture and the demonstration of clear and definable improvements in the performance, logistics supportability, reliability, and maintainability of the item. All efforts shall employ the best technology in consonance with economic considerations.

If applicable, the Contractor shall provide design concepts to include provisions for continuous technological upgrades, maximizing adaptation of emerging technological advances in the commercial marketplace. Commercial-off-the-shelf (COTS) equipment and software meeting the requirements of individual TOs shall be used whenever possible. The Contractor shall accomplish tasks associated with technology insertion as defined in specific DOs.

4.9.12 Development and Sustainment of Aircraft Tools

The Contractor shall develop and sustain tools that enhance the support of aircraft and associated support equipment. The contractor shall maintain the capability to develop new and innovative tools to reduce maintenance man-hours and material cost, while improving production flow, safety, and product quality. The contractor shall maintain specific reverse engineering toolsets applicable to aging aircraft tools with limited or no data. The contractor shall maintain rapid prototyping machine shop support for the fabrication of new or reverse engineered aircraft tools.

The Contractor shall accomplish tasks associated with the development and sustainment of aircraft tools as defined in specific DOs.

4.9.13 Reliability/Maintainability Engineering

The Contractor shall have the expertise to apply reliability/maintainability engineering to optimize weapon system availability. The Contractor shall be knowledgeable in extracting and analyzing large amounts of data from Air Force and DoD information systems. The contractor shall have the knowledge and software tools to organize data by end items, major systems, subsystems, individual components, and components parts. The Contractor shall have the capability to perform detailed root cause analysis evaluations and provide actionable engineering recommendations to the government to improve weapon system availability. The Contractor shall have the capability to perform FMECA, severity, repair cost, and schedule analyses to support all recommendations

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

to the government. The Contractor shall accomplish tasks associated with reliability/maintainability engineering as defined in specific DOs.

4.9.14 Industrial Engineering

The Contractor shall provide industrial engineering support to streamline maintenance processes to increase efficiency and reduce cycle times. The Contractor shall develop procedures for the application of tooling, support equipment, and maintenance processes in accordance with the DO.

The contractor shall retain computer-based simulation software and data modeling resources to assist Government personnel with the optimization/display of manpower, materials, and tooling resources. The Contractor shall accomplish tasks associated with industrial engineering as defined in specific DOs.

4.9.15 Aerospace Engineering

The Contractor shall provide aerospace engineering support to include finite element modeling supporting static, modal, dynamic transient, and nonlinear methods. The Contractor shall provide meshing/pre-processing tools such as Femap and HyperMesh and support importing of geometry from a variety of CAD and solid modeling platforms such as SolidWorks, PTC Creo, Catia, and AutoCAD. The contractor shall provide engineering support for stress analysis using NASTRAN and support pre/post processing of information using Hyperworks and Femap for structural design studies, damage tolerance analysis, and mishap investigations. The Contractor shall provide computational fluid dynamics (CFD) engineering support using Kestrel – DoD/High Performance Computing Advanced Navier-Stokes equation solver. The contractor shall provide advanced CFD computing resources for rapid convergence of large, whole aircraft problems. The Contractor shall provide CFD analyses to include pressure distribution and drag to support modifications and load estimation for structural models. The Contractor shall support mishap investigations with analyses, data review/collection, and repair design engineering. The Contractor shall accomplish tasks associated with aerospace engineering as defined in specific TOs.

4.9.16 Electrical Engineering

The contractor shall provide electrical engineering support to analyze and document existing specification requirements and identify hardware and software modifications to correct known and potential system deficiencies. Corrective actions will include design, fabrication, prototyping, test, and qualification of avionic/electrical system hardware to include modification/redesign of line replaceable units, circuit card assemblies, wiring, connectors, and antennas. Avionic/electrical system modifications include the development and implementation of software in support of known and potential system updates. The contractor shall provide electrical engineering hardware and software support to design, build, document, test, and qualify automatic test systems, test benches, integrated support stations, and performance evaluation equipment. The contractor shall provide electrical engineering support to include the analysis and study of energy systems, industrial process energy, and energy management systems. The contractor shall include cost-effective, risk-based, anti-tamper solutions in electrical engineering tasks. The contractor shall accomplish tasks associated with electrical engineering as defined in specific DOs.

(Critical Technical). Other requests for this document shall be referred to AFSC/GUMB, Tinker AFB, OK 73045.

4.9.17 Human Factors Engineering

The Contractor shall provide human factors engineering support to analyze, adapt, and redesign work and work environments to optimize human performance. Analyses may include human factor, crew station, usability analysis, design of tools and workspace, ergonomic risk and mitigation, training, and rehabilitation engineering. The Contractor shall quantify physical and cognitive requirements of tasks, develop criteria for matching people and tools with task requirements, identify ergonomic risks and mitigation, and develop design criteria for tools and work environments. The Contractor shall provide biomechanical laboratory resources to include biomechanical sensing systems and simulation software to include 3-dimensional motion capture, floor load, wireless sensors, and video. The Contractor shall be proficient in the application of simulation software such as Open Sim, AnyBody, and Visual3D for the estimation of physiological responses at the joint and tissue level. The Contractor shall accomplish tasks associated with human factors engineering as defined in specific DOs.

4.9.18 Test and Evaluation

The Contractor shall provide mechanical, electrical, and software test and evaluation resources to support DO requirements. The Contractor shall provide mechanical testing load frames capable of testing up to 265,000 pounds and support up to 15-foot assemblies. These load frames shall be capable of static, fatigue, and dynamic testing with 110,000 and 22,000 load frames available for coupon and component level testing.