This document outlines the terms and conditions for a construction manager as general contractor (CMGC) services contract for the construction of two U.S. Geological Survey facilities on the Big Island of Hawaii. The solicitation will proceed in two phases, with phase one requesting technical qualifications and experience in areas such as CMGC project delivery, federal construction, and research laboratory construction. Phase two will invite price proposals after 35% design documents are available. Offerors must identify licensed subcontractors and will be evaluated on technical qualifications, past performance, project management plans, and small business subcontracting goals. The contract consists of design services at a firm-fixed price and an optional construction phase with a not-to-exceed price and potential shared savings incentive. The document provides additional details on proposal requirements, evaluation criteria, and contractual terms such as wage determinations, invoicing procedures, and performance reporting requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140G0321R0011_Amd_0002.pdf | ||
| HVO-PIERC_CMGC_Attch_4_QA2_0002.docx | DOCX document | |
| HVO-PIERC_CMGC_Attch_3_QA1_0001.docx | DOCX document | |
| Sol_140G0321R0011_Amd_0001.pdf | ||
| HVO-PIERC_CMGC_Attch_2_SOW_v6.docx | DOCX document | |
| Sol_140G0321R0011.pdf | ||
| Cover_page_of_USGS_Field_Station_Drawing_SD_20210730.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Terms and Conditions – Construction Manager as General Contractor (CMGC) Services for construction of USGS Facilities on Hawaii Island, Hawaii for HVO and PIERC Definitions “Contract clause” or “clause” means a term or condition used in contracts or in both solicitations and contracts, and applying after contract award or both before and after award.
“Solicitation provision” or “provision” means a term or condition used only in solicitations and applying only before contract award. Throughout this document, provisions are marked with an asterisk (*).
*52.252-1 -- Solicitation Provisions Incorporated by Reference (Feb 1998) This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at https://www.acquisition.gov/far/.
The following provisions are incorporated by reference, with fill-ins noted as appropriate:
*52.204-7 – System for Award Management (Oct 2018) *52.204-8 – Annual Representations and Certifications (Sep 2021) NAICS is 236220, size standard is $39.5M.
*52.204-16 – Commercial and Government Entity Code Reporting (Aug 2020) *52.215-1 – Instructions to Offerors – Competitive Acquisition (Jan 2017) *52.216-1 – Type of Contract (Apr 1984)
With regard to the fill-in for the provision at 52.216-1, insert “firm-fixed price.”
*52.217-5 – Evaluation of Options (July 1990) *52.222-5 – Construction Wage Rate Requirements – Secondary Site of the Work (May 2014) *52.222-23 – Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) With regard to the fill-in for provision 52.222-23, for Hawaii County, HI the minority participation goal is 70.4% and the nationwide female participation goal is 6.9%.
*52.225-12 – Notice of Buy American Act Requirement – Construction Materials Under Trade Agreements (May 2014)
*52.233-2 – Service of Protest (Sep 2006) With regarding to the fill-in at paragraph (a), agency-level protests and copies of GAO protests may be served on the Contracting Officer by email to jcaravelli@usgs.gov. Receipt confirmation will be provided.
*52.236-27 – Site Visit (Construction) (Feb 1995) With regard to the fill-in at paragraph (b), offerors may contact the Contracting Officer by email at jcaravelli@usgs.gov. Site visits will only be offered during phase 2 of the solicitation.
(End of Provision) *Solicitation Provisions Included by Full Text *52.204-24 – Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Oct 2020) The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services—Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.
(a) Definitions. As used in this provision— Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services".
(d) Representation. The Offeror represents that—
(1) It □ will, □ will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that— It □ does, □ does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.
(e) Disclosures.
(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment—
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services—
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment—
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services—
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(End of provision) *52.204-26 – Covered Telecommunications Equipment or Services – Representation
(a) Definitions. As used in this provision, "covered telecommunications equipment or services" and "reasonable inquiry" have the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services".
(c)
(1) Representation. The Offeror represents that it □ does, □ does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.
(2) After conducting a reasonable inquiry for purposes of this representation, the offeror represents that it □ does, □ does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services.
(End of provision) *Proposal Submission Instructions, Evaluation of Offerors This solicitation will proceed in two phases. Phase 1 will request only technical qualifications. Later, after 35% design documents are available, phase 2 will invite price proposals. This phasing is being done solely to accommodate the design schedule and allow ample time to evaluate proposals; there will not be a phase 1 down-select. Details follow.
In phase 1, we will evaluate offerors’ qualifications to perform the required scope. Offerors must identify key subcontractors with their proposals and must use those subcontractors throughout the project. All evaluation criteria below are inclusive of subcontractors (i.e., when we speak of experience, we mean experience of the prime and experience of all key subcontractors.)
· The prime contractor must be a currently licensed Hawaii class A general engineering contractor or class B general building contractor and all subcontractors must be currently licensed Hawaii class C specialty contractors in their respective trades. This is a pass/fail criterion.
· Experience, particularly:
· Prime contractor experience with the CMGC project delivery method;
· Experience in research laboratory construction;
· Experience in federal construction projects;
· Experience in the local market; and
· Experience of proposed team members working together previously.
· Past Performance
· Offerors are encouraged to submit references; and
· We will be utilizing the Contractor Performance Assessment Reporting System (CPARS) and reserve the right to use any other source of past performance information available.
· Project and Information Management Plan
· This is a narrative description of offerors’ project and information management framework for a project of this scope and size. We are also interested in which, if any, professional construction contracting management software will be utilized (e.g. Procore, Trimble ProjectSight).
· Each of the above factors, except for licensing in the first bullet, which is pass fail, will be rated on an adjectival scale of: outstanding, good, satisfactory, marginal, unsatisfactory.
· Small Business Subcontracting
· This is an unrestricted acquisition. The USGS’ small business subcontracting goal is 43.5%. Offerors must identify their size status and the size status of each proposed key subcontractor, along with the estimated percentage of dollars going to each. This factor will be rated on the same adjectival scale as the rest, but because offerors are competing for the same subcontractors in the same labor market, proposed small business subcontracting percentages will be compared across all other offerors, thus adjectival ratings will be relative.
· Note the small business subcontracting plan requirements at 52.219-9. The overall percentage goal will be incorporated into any contract resulting from this solicitation along with a draft subcontracting plan. A final subcontracting plan will be negotiated as part of the final proposal to construction/exercise of option to construct process.
The factors above are in generally declining order of importance and will be combined into an overall non-price rating on the same adjectival scale. There is no prescribed format for the phase 1 submission; however, failure to include relevant information will result in a lower rating. Limit 40 pages.
In phase 2, we will solicit price proposals from all offerors who have submitted phase 1 proposals. If you do not submit a phase 1 proposal before the indicated due date/time, you may not submit a phase 2 proposal. This is expected to occur when the design has reached the 35% milestone for both facilities and may occur before we have completed our evaluation of phase 1 proposals. The price proposal will have two components: a firm-fixed price for design-phase services, and a not-to-exceed (NTE) price for the optional construction phase. See SOW section 4.3 and clause USGS1 for more information on the construction phase option NTE, final proposal to construct, shared savings incentive, and organizational conflict of interest protection.
We will award a contract to the offeror judged to represent the best value overall, price and other factors considered, where factors other than price (combined) are significantly more important than price within the available budget.
(End of Provision) 52.252-2 -- Clauses Incorporated by Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at https://www.acquisition.gov/far/.
The following clauses are incorporated by reference, with fill-ins noted where appropriate.
52.203-3 – Gratuities (Apr 1984) 52.203-5 – Covenant Against Contingent Fees (May 2014) 52.203-6 – Restrictions on Subcontractor Sales to the Government (Sep 2006) 52.203-7 – Anti-Kickback Procedures (May 2014) 52.203-8 – Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 – Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 – Limitation on Payments to Influence Certain Federal Transactions (Oct 2010) 52.203-13 – Contractor Code of Business Ethics and Conduct (October 2015) 52.203-14 – Display of Hotline Posters (October 2015)
With regard to the fill-in at 52.203-14(b)(3), the Department of Interior Office of Inspector General’s “hotline” poster can be accessed here: https://www.doioig.gov/sites/doioig.gov/files/OIGFraudHotlinePoster_01242014jpg.jpg 52.203-17 – Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (Apr 2014) 52.203-19 – Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-10 – Reporting Executive Compensation and First-Tier Subcontract Awards (June 2020) 52.204-13 – System for Award Management Maintenance (Oct 2018) 52.204-14 – Service Contract Reporting Requirements (Oct 2016) 52.204-18 – Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 – Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-25 – Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2020) 52.209-6 – Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (June 2020) 52.209-9 – Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) 52.209-10 – Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.211-10 – Commencement, Prosecution, and Completion of Work (Apr 1984) Fill-ins TBD upon award. We expect approximately six to eight months for design-phase services and 24-36 months for construction.
52.215-2 – Audit and Records – Negotiation (Jun 2020) 52.219-4 – Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Sep 2021) 52.219-8 – Utilization of Small Business Concerns (Oct 2018) 52.219-9 – Small Business Subcontracting Plan (Sep 2021) 52.219-16 – Liquidated Damages – Subcontracting Plan (Sep 2021) 52.219-28 – Post-Award Small Business Program Rerepresentation (Sep 2021) 52.222-3 -- Convict Labor (Jun 2003) 52.222-4 – Contract Work Hours and Safety Standards – Overtime Compensation (May 2018) 52.222-6 – Construction Wage Rate Requirements (Aug 2018) 52.222-7 -- Withholding of Funds (May 2014) 52.222-8 -- Payrolls and Basic Records (Jul 2021) 52.222-9 -- Apprentices and Trainees (Jul 2005) 52.222-10 -- Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 -- Subcontracts (Labor Standards) (May 2014) 52.222-12 -- Contract Termination – Debarment (May 2014) 52.222-13 -- Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 -- Disputes Concerning Labor Standards (Feb 1988) 52.222-15 -- Certification of Eligibility (May 2014) 52.222-21 -- Prohibition of Segregated Facilities (Apr 2015) 52.222-26 -- Equal Opportunity (Sep 2016) 52.222-27 -- Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-35 – Equal Opportunity for Veterans (Jun 2020) 52.222-36 -- Affirmative Action for Workers With Disabilities (Jun 2020) 52.222-37 – Employment Reports on Veterans (Jun 2020) 52.222-40 – Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) 52.222-50 -- Combating Trafficking in Persons (Oct 2020) 52.222-54 – Employment Eligibility Verification (Oct 2015) 52.222-55 – Minimum Wages Under Executive Order 13658 (Nov 2020) 52.222-62 – Paid Sick Leave Under Executive Order 13706 (Jan 2017) 52.223-2 -- Affirmative Procurement of Biobased Products Under Service And Construction Contracts (Sep 2013) 52.223-3 Alt I – Hazardous Material Identification and Material Safety Data (Feb 2021, with Alt I (Jul 1995)) 52.223-5 -- Pollution Prevention and Right-to-Know Information (May 2011) 52.223-6 – Drug-Free Workplace (May 2001) 52.223-12 – Refrigeration Equipment and Air Conditioners (June 2016) 52.223-15 – Energy Efficiency in Energy-Consuming Products (May 2020) 52.223-17 – Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (Aug 2018) 52.223-18 – Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) 52.225-11 – Buy American – Construction Materials Under Trade Agreements (Oct 2019) With regard to fill-ins for clause 52.225-11, there are no excepted materials.
52.225-13 -- Restrictions on Certain Foreign Purchases (Feb 2021) 52.227-4 – Patent Indemnity – Construction Contracts (Dec 2007) 52.228-2 – Additional Bond Security (Oct 1997) 52.228-5 – Insurance – Work on a Government Installation (Jan 1997) Commercial general liability insurance shall be maintained in an amount of at least $1,000,000.00.
52.228-12 – Prospective Subcontractor Requests for Bonds (May 2014) 52.228-15 – Performance and Payment Bonds – Construction (Jun 2020) 52.229-3 – Federal, State, and Local Taxes (Feb 2013) 52.232-5 -- Payments Under Fixed-Price Construction Contracts (May 2014) Regarding 52.232-5(b), prior to commencing progress payments during the construction phase, the parties must agree to a schedule of values (SOV) prepared in the CSI MasterFormat, i.e. by Divisions. The SOV will be updated monthly to correspond with requests for progress payments.
52.232-23 -- Assignment of Claims (May 2014) 52.232-27 -- Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 -- Payment by Electronic Funds Transfer—System for Award Management (Oct 2018) 52.232-40 – Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) 52.233-1 – Disputes (May 2014) 52.233-3 -- Protest After Award (Aug 1996) 52.233-4 -- Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-1 – Performance of Work by the Contractor (Apr 1984) With regard to the fill-in: 12%.
52.236-2 -- Differing Site Conditions (Apr 1984) 52.236-3 -- Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 -- Material and Workmanship (Apr 1984) 52.236-6 -- Superintendence by the Contractor (Apr 1984) 52.236-7 -- Permits and Responsibilities (Nov 1991) 52.236-8 -- Other Contracts (Apr 1984) 52.236-9 -- Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-10 -- Operations and Storage Areas (Apr 1984) 52.236-11 -- Use and Possession Prior to Completion (Apr 1984) 52.236-12 -- Cleaning Up (Apr 1984) 52.236-13 -- Accident Prevention (Nov 1991) 52.236-15 – Schedules for Construction Contracts (Apr 1984) 52.236-21 – Specifications and Drawings for Construction (Feb 1997) 52.236-26 – Preconstruction Conference (Feb 1995) 52.242-14 -- Suspension of Work (Apr 1984) 52.243-5 -- Changes and Changed Conditions (Apr 1984) 52.244-6 – Subcontracts for Commercial Items (Jul 2021) 52.246-12 -- Inspection of Construction (Aug 1996) 52.246-21 -- Warranty of Construction (Mar 1994) 52.248-3 – Value Engineering – Construction (Oct 2015) 52.249-2 – Termination for Convenience of the Government (Fixed –Price) (Alt 1) (Sep 1996) 52.249-10 -- Default (Fixed-Price Construction) (Apr 1984) 52.253-1 -- Computer Generated Forms (Jan 1991) (End of Clause) Contract Clauses Included by Full Text
USGS 1 – Option to Construct, Shared Savings Incentive, and Organizational Conflict of Interest Protection
(a) This contract consists of design phase services at a firm-fixed price and an optional construction phase at a not-to-exceed (ceiling) price. The USGS may require the contractor to perform the optional construction phase at or below the ceiling price. The Contracting Officer may exercise this option by written notice to the Contractor within ninety (90) days of the delivery of the final proposal to construct as described in section 4.3.1 of the SOW.
(b) Shared Savings Incentive. If the final proposal to construct is less than the ceiling price, the USGS may exercise the option at the lesser amount and the USGS and the Contractor will share in any savings 50/50. If the option is exercised, the Contractor’s share of savings will be included in the contract as a separate line item payable upon contract completion.
(c) The construction option cannot be exercised above the ceiling price. If the final proposal to construct exceeds the ceiling price, the option may be exercised at the ceiling price only by mutual agreement of the parties.
(d) Organizational Conflict of Interest Protection. If the final proposal to construct exceeds the ceiling price and the parties cannot mutually agree to exercise the option at the ceiling price, and the USGS subsequently issues a competitive solicitation within two (2) years of the completion of the design-phase services, the Contractor is excluded from submitting a proposal in response to said solicitation and is not eligible for award. Further, the Contractor may not participate at any level (consultant, partner, joint venture, subcontractor, etc.) in any other prospective contractor’s proposal.
(End of Clause)
USGS 2 – Substantial Completion
(a) Definitions, General
(1) “Substantially complete” means that the Contractor has completed work and related contract obligations in accordance with the contract documents, such that the Government may enjoy the intended access, occupancy, possession, and use of the entire work without impairment due to incomplete or deficient work, and without interference from the Contractor’s completion of remaining work or correction of deficiencies in completed work.
(2) “Entire work” means the unit of physical space intended for occupancy in a single phase.
(3) In no event shall the work be deemed “substantially complete” if all fire and life safety systems are not tested and accepted by the authority having jurisdiction.
(4) Unless otherwise specifically noted, or otherwise clear from context, all references in the contract to “acceptance” shall refer to issuance of a written determination of substantial completion by the Contracting Officer.
(b) Notice of Substantial Completion
(1) The Contractor must submit to the Contracting Officer an initial proposed substantial completion date at least ninety (90) days in advance thereof. This will trigger the pre-substantial-completion inspection at SOW 5.6.3.
(2) The contractor must submit to the Contracting Officer a revised proposed substantial completion date, if necessary, at least thirty (30) days in advance thereof. This will trigger the substantial completion inspection at SOW 5.6.4.
(3) If the Contracting Officer takes exception to a proposed substantial completion date, the Contracting Officer will notify the Contractor in writing as to the conditions that preclude determination of substantial completion. The Contractor will be entitled to additional time to address such conditions only if the Contracting Officer provides notice of such conditions more than thirty (30) days after receiving the proposed substantial completion date.
(c) Acceptance of Substantial Completion
(1) The Contracting Officer will conduct inspections and decide whether the project is substantially complete within a reasonable time. The decision will be documented in writing with a specific date.
(d) Contract Completion
(1) The contract is complete once the Contractor has completed all work and related contract obligations, corrected all deficiencies and all punch list items, submitted all closeout documentation, and complied with all conditions for final payment.
(End of Clause)
USGS 3 -- Green Acquisition
The USGS is committed to promoting the natural environment and protecting the health and well-being of people. In the performance of work under this contract, the Contractor shall exert its best efforts to provide services in a manner that will promote the natural environment and protect health and well-being. Green purchasing or environmentally preferable contracting includes the initiatives described below:
Alternative Fuels and Vehicles are described at http://www.afdc.energy.gov/afdc/ Biobased Products are described at http://www.biopreferred.gov/ Energy efficient products are described at http://energystar.gov/products for Energy Star products and at http://www.eere.energy.gov/femp/procurement for FEMP designated products.
Environmentally Preferable Computers are described at http://www.epeat.net Significant New Alternatives Program (SNAP) are described at http://www.epa.gov/snap/overview-snap The Comprehensive Procurement Guidelines promote the use of recovered and recycled products at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program Water efficient products and services are described at https://www.epa.gov/watersense
(End of Clause)
USGS 4 -- Authorities and Delegations
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer hereby appoints as Contracting Officer’s Representative (COR):
Martin Smith Architect 303-260-9064 msmith@usgs.gov
The COR is responsible for technical monitoring of the contractor’s performance and deliveries. Changes to this appointment must be made in writing by the Contracting Officer.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer and his authorized representative(s), such as the COR, acting within the scope and authority of their appointments. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, if the COR or any other USGS employee has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the individual’s authority, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within the scope of his authority, shall be at the Contractor's risk.
(End of Clause) USGS 5 -- Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform system (IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
See FAR 52.222-8 and 52.232-5.
· Payrolls corresponding to the period being invoiced. Additionally:
· For progress payments, see 52.232-5(b) and (c)
· For final payment, a release of claims in accordance with 52.232-5(h)(3)
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131. If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Clause) USGS 6 -- Incorporation of Wage Determination
Wage determination HI20210001, available here: https://beta.sam.gov/search?index=wd, is hereby incorporated and made a part of this contract through the revision current on the effective date of this contract. If this contract is modified, the wage determination shall update to its most current revision.
(End of Clause)
USGS 7 -- Unilateral Deobligation
The contractor shall submit all invoices under this award no later than ninety (90) calendar days after the period of performance has expired, unless a request for extension has been submitted to, and granted by, the Contracting Officer. After 120 calendar days have passed after the expiration of the period of performance, the Contracting Officer reserves the right to issue a unilateral modification deobligating any unexpended funds, and to initiate closeout procedures.
(End of Clause) USGS 8 -- Contractor Performance Assessment Reporting System
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of Clause)
52.223-99 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Oct 2021) (DEVIATION)
(a) Definition. As used in this clause - United States or its outlying areas means—
(1) The fifty States;
(2) The District of Columbia;
(3) The commonwealths of Puerto Rico and the Northern Mariana Islands;
(4) The territories of American Samoa, Guam, and the United States Virgin Islands; and
(5) The minor outlying islands of Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Midway Islands, Navassa Island, Palmyra Atoll, and Wake Atoll.
(b) Authority. This clause implements Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, dated September 9, 2021 (published in the Federal Register on September 14, 2021, 86 FR 50985).
(c) Compliance. The Contractor shall comply with all guidance, including guidance conveyed through Frequently Asked Questions, as amended during the performance of this contract, for contractor or subcontractor workplace locations published by the Safer Federal Workforce Task Force (Task Force Guidance) at https:/www.saferfederalworkforce.gov/contractors/
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts at any tier that exceed the simplified acquisition threshold, as defined in Federal Acquisition Regulation 2.101 on the date of subcontract award, and are for services, including construction, performed in whole or in part within the United States or its outlying areas.
(End of clause)