2021 04 30 Atch 4 TechnicalWksheetRevised 21R R012.docx
DOCX document 37 KB Posted
- Solicitation number
- HTC711-21-R-R012
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
CUI
Source Selection Information – See FAR 2.101 and 3.104
TECHNICAL WORKSHEET
SOLICITATION #: HTC711-21-R-R012
STEVEDORING AND RELATED TERMINAL SERVICES
PORT(S): PORT OF AQABA, JORDAN
When completing this technical worksheet based on the posted requirements, the Offeror shall assume the Government has no prior knowledge of the experience past or present the Offeror may have or performed, and will base its evaluation SOLELY on the information presented within this Technical Worksheet questioner.
**Submission Rules**
· The Offeror shall provide convincing explanation and descriptions to address how the Offeror intends to meet each item in Sections 1 through 5 on the worksheet during the period of performance listed in the solicitation. The Offeror shall not simply restate the Government’s requirements or list their past performance and past experience.
· Statements that the Offeror understands, can, or will comply with the Performance Work Statement (PWS); statements paraphrasing the PWS or parts thereof; flowcharts simply listing activities related to performance requirements of the PWS; and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., without an explanation or description of how services will be performed during the period of performance listed, shall be considered unacceptable.
· Sections 1 through 4 of this Technical Worksheet shall not exceed 25 pages (a single-side is equal to 1-page). Section 5 of this Technical Worksheet will not be counted against the 25 pages.
· If more than 25 pages are received for Sections 1 through 4, only the first 25 pages will be evaluated and all other pages will be removed and therefore not evaluated.
· Documentary evidence (photos) and Material Handling Equipment (MHE) lists will not count against the page limits.
· Failure to provide a response to Sections 1 through 5, completing this document in its entirety and failure to attach all requested documentation may result in the Offeror’s proposal being ineligible for award.
NOTE** Failure to complete this document in its entirety or attach requested documents may result in a proposal being ineligible for award.
**Technical Evaluation Questions**
1. Labor/Management
1a. Describe/explain your capability to provide personnel within a 24-hour and 48-hour notice, in order to support multiple work sites, reception of cargo for truck and loading/discharging multiple decks simultaneously on multiple vessels on multiple berthing.
Click here to enter text.
1b. Describe/explain your plan for addressing labor shortages due to competing requirements; for example, commercial versus military, and moving from normal work schedules to working twenty-four hours per day for seven days (24/7) and how you would mitigate those personnel shortfalls.
Click here to enter text.
Controlled by: USTRANSCOM Controlled by: Directorate of Acquisition CUI Category/ies: SSEL Limited Dissemination Control: FED ONLY POC: Anthony Laudano, 618.220.7083
1c. Describe the type/class of labor that makes up the different work parties/gangs (i.e., truck, and vessel operations), and their supervision structure.
Click here to enter text.
1d. Describe/explain how you will maintain driver pool for the USG specialized military equipment (i.e., M1A2, M2, strikers, MRAPS). Describe any specialized training or experience you have with the operation of unique US Military equipment?
Click here to enter text.
2. Material Handling Equipment (MHE)
2a. Describe and provide a list with photos, of what equipment you have in your inventory that is available to use to handle all classes of supply (to include HAZMAT and Explosives). Please include details for LO/LO and RO/RO operation for vessel and truck operations with 500T ramp and mobile crane, 100T mobile ramp, 20T stationary crane.
Click here to enter text.
2b. Describe how you would supply equipment for working multiple vessels while conducting stevedoring operations working 24/7 operations to support loading/discharging multiple decks simultaneously on multiple vessels on multiple berthing while performing reception and depositing of USG cargo?
Click here to enter text.
2c. Describe and provide photos of what equipment you have in your inventory that would be used to tow/dray dead lined vehicles up to 160,000 lbs. on, and off a vessel with deck heights up to 10’6.’’ Describe also your plan to mitigate working multiple decks on a vessel loading/discharging inoperable vehicles to and from staging lots, while keeping up with minimum set productivity levels.
Click here to enter text.
2d. The Government requires that you provide a contact maintenance team, equipment and vehicle(s) capable of determining the condition of its cargo rapidly, describe how your company will support this requirement while working in multiple operations (i.e., staging lots, loading trucks, and on multiple vessel decks).
Click here to enter text.
2e. The Government requires that its contractor shall have the capability to make minor equipment repairs on site and during an operation (i.e., changing tire, refueling vehicles, changing batteries), describe how your company will provide this requirement?
Click here to enter text.
2f. Describe the personnel experience with the required MHE to support the mission.
3. Reception and Disposition
3a. The Government requires our stevedore contractor to provide receipt and disposition and transfer of cargo.
Please explain your current or past business practices with reception, transferring, and disposition of cargo at each of the named ports, per the requirements.
Click here to enter text.
3b. The Government maintains positive control of all cargo being imported and exported, please explain or show evidence of how (based on the requirements) you would maintain control of cargo placed in your care, including tallying, checking and inventory of cargo.
Click here to enter text.
3c. The Government may elect to operate on a 24/7 basis, please explain or show evidence of your management services to operate under those conditions, include available labor, skills sets, and include certifications, licensing, training as describe in the requirement.
Click here to enter text.
4. Vessel Operations
4a. The Government requires its contractor to be flexible in providing service. Can you provide flexible start times for receiving cargo at the port, starting vessels at odd hours or transitioning from normal work day schedules? Please explain your ability to provide this flexibility of varied start times and describe any impacts to Government.
Click here to enter text.
4b. Describe/explain your ability to load/discharge cargo to/from a vessel without causing damage and in accordance with (IAW) the Government’s safety requirements.
Click here to enter text.
4c. Explain or describe the loading and discharging of RO/RO and LO/LO cargo to/ from vessels.
Click here to enter text.
4d. Do you have experience with lashing/securing U.S. Military Cargo and specific tie down procedures related to vessel operations? Please Explain.
Click here to enter text.
4e. The Governments cargo is unique in that it comes in all weight classes, operable and inoperable (wheel vehicles, track vehicles, containers, breakbulk), where the working multiple decks is advantageous to the Government.
Explain your stevedore’s ability to conduct vessel discharge operations, by describing MHE, labor, lift capability, and staging, where barge operations, and rail operations are being worked simultaneously?
Click here to enter text.
5. Truck operations
5a. Does your company have the ability to provide access for loading and unloading trucks?
Click here to enter text.
5b. Explain your capabilities to successfully and efficiently conducting truck operations without causing damage to any Government cargo. Describe your management plan to safety load or discharge the Governments cargo per the Government’s requirements.
Click here to enter text.
5c. Explain your capabilities you have for cargo reception & disposition via trucks? Is the area used for loading/discharging trucks in close proximity of staging areas, and piers?
Click here to enter text.
5d. During truck operations there may be a need for portable end ramps (weight capacity of 140 tons). Please show evidence and describe your access to the named items above, (photographs accepted).
Click here to enter text.
5e. Government cargo as stated elsewhere is unique and loading or discharging trucks takes a broad range of MHE and skilled labor, please describe (photographs accepted) your ability to handle loading and unloading RO/RO and describe how you would handle dead lined or inoperable vehicles weighing from 15,000 to 150,000 lbs.
Click here to enter text.
5f. Describe/explain your ability to provide security for handling sensitive, classified, HAZMAT cargo.Click here to enter text.
File details come from the government source that posted it. Updated .