This document describes a use case for building a new family home. It outlines the process by which Mr. and Mrs. Charles planned, designed, financed, and constructed their new nine-acre property with a 3,600 square foot home in northern Illinois between January 2017 and November 2018. Key details include: Mr. Charles serving as general contractor and coordinating various subcontractors such as land surveyors, foundation companies, framers, roofers, plumbers, electricians, heating and cooling repairmen, siding installers, drywallers, painters, carpenters, and appliance installers. Mrs. Charles selected design features like paint colors and flooring while the architect developed plans within two months. Mr. Charles obtained financing through a local bank after six weeks of negotiations, securing a 30-year, 4% interest loan. Construction was completed on schedule and the home passed final inspection on November 1, 2018, allowing the Charles family to move in the following day.

Attachment 10 - Architecture Use Case

View the file

Other files for this federal contract opportunity

Other files attached to Enterprise Architecture, Data, and Engineering (EADE), newest first.
File Type Posted
HTC71119RD007_Amend_0004.pdf PDF
Attachment_7_-_EADE_Pricing_Template_AMD_0003.xlsx XLSX spreadsheet
HTC71119RD007_Amendment_0003.pdf PDF
2019.06.10_Q_&_A_Supplemental.xlsx XLSX spreadsheet
HTC71119RD007_-_Amendment_0002.pdf PDF
Attachment_4_-_Past_Performance_Information_Sheet.docx DOCX document
Attachment_4_-_Past_Performance_Information_Sheet.pdf PDF
Attachment_7_-_EADE_Pricing_Template.xlsx XLSX spreadsheet
Attachment_9_-_DD_Form_254.pdf PDF
HTC71119RD007_Amendment_0001.pdf PDF
Attachment_1_-_Performance_Work_Statement.pdf PDF
2019.05.21_Solicitation_Question__Answer.xlsx XLSX spreadsheet
Attachment_10_-_Architecture_Use_Case.pdf PDF
Attachment_5_-_Past_Performance_Reference_Sheet.pdf PDF
Attachment_6_-_Past_Performance_Questionnaire_Form.pdf PDF
Attachment_8_-_Labor_Category_Descriptions.pdf PDF
Attachment_5_-_Past_Performance_Reference_Sheet.pdf PDF
Attachment_4_-_Past_Performance_Information_Sheet.pdf PDF
HTC71119RD007.pdf PDF
Attachment_7_-_EADE_Pricing_Template.xlsx XLSX spreadsheet
Attachment_3_-_Question_&_Answer_Template.xlsx XLSX spreadsheet
Attachment_10_-_Architecture_Use_Case.pdf PDF
Attachment_8_-_Labor_Category_Descriptions.xlsx XLSX spreadsheet
Attachment_6_-_Past_Performance_Questionnaire_Form.pdf PDF
Attachment_9_-_DD_Form_254.pdf PDF
Attachment_2_-_Quality_Assurance_Surveillance_Plan.pdf PDF
Attachment_1_-_Performance_Work_Statement.pdf PDF
2019.05.03_Presolicitation_Q&A.xlsx XLSX spreadsheet
EADE_IDIQ_PWS.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A New Charles Family Farm House Use Case

In January 2017, Mrs. Charles informed her husband it was time that they begin planning to build a new family home in southern Illinois. She would like to be involved in the details with the contractors on matter of location, building design, paint and siding color. The couple intended to add to the family and their current, 1800 square foot, 3 bedroom, house was already too small. A larger residence was always in the plans for the Charles family however, they could not afford two mortgages for more than a six month period and the current housing market was taking eight to twelve months to sell a house.

Mr. Charles wanted to build his own house and start his own farm with at least eight acres with a move in date that was prior to the start of winter. He knew it would take approximately six months to build the new family home. It took only 14 days from the time Mrs. Charles informed her husband to begin planning to the time the realtor had located three plots of land, one with six acres, one with nine acres and one with eight areas in northern Illinois. After reviewing the three plots of land the Charles’ decided on the nine acres within 7 days.The realtor located three plots of land, one with six acres, one with nine acres and one with eight acres in northern Illinois. After reviewing the three plots of land the Charles’ decided on the nine acres. There was much to be completed over the next several months in order for the Charles family to successfully work their way through the process of relocating to the new residence. Mr. Charles was the general contractor responsible for the coordination with all the appropriate offices/contractors and ensured payment draw from the bank after completion of each install and passing inspection. The architect only took two months, from the time Mrs. Charles had informed her husband that she was ready to plan the new house, to create plans and drawings based on the requirements of Mrs. Charles.

Mr. Charles attempted to obtain a thirty year loan, at four percent, at the local credit union. After six weeks of negotiations to obtain a loan Mr. Charles left the credit union and was able to obtain a loan at the local bank with his terms.

Mr. Charles hired several contractors, starting with a land surveyor who used 3D scanners and drones to examine the property and mark the layout of the house on the land. Then he hired a foundation company contractor to come in and pour the basement walls based on those markings. Once the walls were dry, the county inspector came out to inspect to ensure rebar was in place and concrete poured correctly. A passing inspection was required before the plumber could come in to rough in the plumbing in the basement for bathrooms and sump pump. The county inspector returns to the property to inspect the plumbing to ensure it is installed correctly prior to the foundation company coming back out to pour more concrete to form the basement and garage floor.

Mr. Charles hired the house framers to come out and frame the entire house and garage over a period of two weeks and then Mr. Charles called the county inspector to come out to inspect the framing prior to the roofers installing a water tight roof. While the roof was being inspected the plumber roughed in the waterlines before the heating and cooling repairmen contractor was able to install the new Geothermal system. Mr. Charles ensured close coordination with the electrician to enable the connections.

The Charles current residence sold in April 2018.

The electrician roughed in the electrical wiring and cabling which required an inspector to complete an inspection of the electrician’s work. At the same time the siding company came out to install siding on the house once the masons had completed the laying of the brick on the front of the house.

The insulation contractor insulated the house using the blown in method and coordinated with plumbing, heating, and the electricians to ensure the county inspection passed upon completion of the install.

The drywall and finishing contractors came in over a period of three weeks to drywall, tape, and mud the entire house and garage. Mr. Charles pointed out areas that required rework and a seven day drying period prior to the required inspection taken place.

The painters primed and painted the entire house based on Mrs. Charles color selections. The carpenter contractor trimmed out the entire house to include doorframes, baseboards, crown molding and doors. This required a drying period of eight days prior to them coming back in to hang the doors. Meanwhile, the electrician installed the lighting fixtures throughout the house.

In order to save money, Mr. Charles installed the tile in the kitchen and entryways. The carpenter installed the kitchen and bathroom cabinets and upon completion, the Lowe’s contracted support installed carpet throughout the rest of the house.

The contractor delivered all the appliances into the new garage for the general contractor to install. The plumber hooked up water to all faucets, the dishwasher, and the refrigerator; then, the inspector came out to inspect the connections. The general contractor notified the county that they were ready for a final inspection. The inspector inspected the entire house to ensure the contracted items were in a finished state, and the smoke detection and the fuse panel were installed to ensure the house was ready to be occupied by the owner. The final inspector confirmed with the general contractor that the home was ready. Mrs.

Charles’ plan was to move in the day after receiving the occupancy permit. The move in permit was provided to the general contractor on 1 November 2018. Mr.

Charles completed all transactions with the bank and closed on the loan paperwork two week later.

File details come from the government source that posted it. Updated .