CMS_Q A_7.25.2013.pdf
PDF 88 KB Posted
- Attached to
- Container Management Streamlining Federal contract opportunity
- Solicitation number
- HTC711-13-R-R010
About this file
CMS Master Lease Contract (HTC711-13-R-R010) Questions and Answers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CMS_Q A_8.07.2013.pdf | ||
| HTC711-13-R-R010_Amendment_03.zip | ZIP file | |
| CMS_Q A_7.29.2013.pdf | ||
| HTC711-13-R-R010_Amendment_2.zip | ZIP file | |
| HTC711-13-R-R010_Amendment_01.zip | ZIP file | |
| ATTACHMENT_1_-_PWS.pdf | ||
| Attachment_2_-_Pricing.xlsx | XLSX spreadsheet | |
| Attachment_L-2_-_SB_Subcontracting_Plan_Template.doc | DOC document | |
| ATTACHMENT_3_-_CMS_Zone_Map.pdf | ||
| Attachment_L-1_-_Past_Performance_Questionnaire.docx | DOCX document | |
| HTC711-13-R-R010_CMS_Solicitation.pdf | ||
| ATTACHMENT_1_-_PWS.pdf | ||
| Attachment_2_-_Pricing.xlsx | XLSX spreadsheet | |
| HTC711-13-R-R010_CMS_Solicitation.pdf | ||
| HTC711-13-R-R010_CMS_Solicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question # Par. Ref. Category Question Government Response
PWS pg. 6, Par. 1.3.2.3 FOB
Destination vs. FOB Origin
Inspection
PWS
How will mobile repairs needed by the consignee whilst equipment is on lease to the GOV’T be handled when it exceeds the 7 calendar days needed for initial inspection .
After the 7 day initial inspection window, the Government will assume responsibility for damages they are responsible for, however, should damages occur due to faulty equipment leased to the Government by the contractor and found during the lease, the contractor will be held liable for all damages in question.
PWS pg. 8, Par. 1.3.2.6
Reconcile Damages
PWS
Do the 21 calendar days start from official redelivery request date or from EIR date once off‐hired at contractor’s container yard?
PWS par. 1.3.2.6 has been changed (Amendment 02) to clarify the 21 day clock begins from the date the equipment is off‐hired.
PWS pg. 8, Par. 1.3.2.6
Reconcile Damages
PWS
PWS does not address number of days once damage claim has been received by AOA of intensions to conduct off‐hire survey to the contractor?
PWS par. 1.3.2.6 changed (Amendment 02) to clarify the AOA will have 10 days to notify the contractor of intensions to conduct off‐ hire survey for damage claims. The reference to "chassis" in regards to a third party off‐hire survey is deleted. A third party survey may be requested for any equipment type.
PWS pg. 8, Par. 1.3.2.5 Order
Consolidation
PWS
Will contract provide definition of various combinations of equipment types to be consolidated and modes of how consolidation will be applicable?
The contract will not provide various combinations of equipment types to be consolidated and modes of how consolidations will be applicable. It is the responsibility of the contractor to propose an acceptable consolidation approach.
PWS pg. 9, Par 1.3.3.1
Automated Access
PWS
PWS states: "The access shall supports [sic] both Microsoft Explorer version number 9 and Netscape Communicator version 4.79 or later software." Please confirm the Netscape Communicator version – the version cited was released in November of 2001. Beginning in 2005, Firefox replaced Netscape. In comparison Internet Explorer 9 was released in 2011.
The PWS shall be changed in Amendment 02 to reflect the most recent versions: Internet Explorer 10 and Mozilla Firefox version 22.0
6 PWS pg. 15, Par 6.0 (b) PWS
PWS states: "Development of the overarching tracking system to accommodate all containers moving within the DOD/ SDDC operational network." Please clarify what is meant by an
“overarching tracking system.” What are the specific expectations of the contractor for collecting the tracking data?
Overarching tracking system refers to a database for task order monitoring for this contract. Tracking does not include in‐transit visibility of equipment leased. Specific reports and data field expectations are outlined in PWS APPENDIX B.
7 PWS, pg 4, Leasing Operations PWS
Equipment type "40' Dry High Cube" is not included in the list of container types listed. Will 40' Dry High Cubes ever be required or should it be identified as a type in the proposal?
40' Dry High Cube shall be incorporated in the PWS par. 1.3.2 and
Pricing attachment in Amendment 02.
8 N/A RFP I don't see on the website the deadline to submit this RFQ?
IAW Amendment 01 of RFP# HTC711‐13‐R‐R010, proposals are due
12 August 2013 @ 1:00 PM Local Time. This response time can be found on page 2 of the SF30 provided in the HTC711‐13‐R‐R010
Amendment 01 attachment. Please note that Past Performance
Questionnaires are due by 1 August 2013 @ 3:00 PM CDT.
9 N/A RFP When is the Proposal Conference? There is no pre‐proposal conference planned for this requirement.
Attachment 2, Pricing (A01), Tier 4, Chassis:
RFP
Are we correct to assume that intermodal chassis equipment is only required to be priced and delivered/redelivered within CONUS
(Continental United States)?
The Government does not have requirements to deliver or redeliver chassis Outside the Contiguous United States (OCONUS). OCONUS delivery and redelivery pricing is deleted from Tier group 4 of the pricing attachment (Amendment 02).
SF 1449, Pg. 25, Economic
Price Adjustment (EPA)
RFP
Will there be a CAF (Currency Adjustment Factor) to address fluctuations with currency exchange when operating in foreign countries?
No, CAF will not be included.
12 SF 1449, Pg 30‐31 RFP Instructions for submitting parts I through III: Do the number of page limits by parts include reference and appendix material?
Page limits include references and appendix material.
13 Attachment L‐1, PPQ RFP
Can we be advised which individuals have responded to our Past
Performance Questionnaires prior to the 1‐Aug‐13 deadline for submission?
The Government will not notify the contractor as to which Past
Performance Questionnaires (PPQ) have been received, however, the contractor may contact the Government to confirm receipt of
PPQs.
Attachment 2, Pricing (A01), TEP:
RFP
Does the TEP represent the expected order quantities for the Base and all option years?
The TEP does not represent the expected order quantities for the
Base and all option years. TEP is a reflection of percentage of equipment types used and most frequent delivery/redelivery locations. TEP will strictly be used to rank and evaluate offeror pricing IAW FAR 52.212‐2. The Historical Data (PWS, APPENDIX C) represents actual equipment type and task orders issued over the past three years.
Container Management Streamlining (CMS) Master Lease Contract