Q A from the draft GPC RFP is attached.

View the file

Other files for this federal contract opportunity

Other files attached to Global Privately Owned Vehicle Contract (GPC) III, newest first.
File Type Posted
Questions_from_Industry_RFP_11_July_13.pdf PDF
Questions_from_Industry_RFP_1_July_13.pdf PDF
HTC711-13-R-R003-0009.zip ZIP file
Questions_from_Industry_RFP_28_June_13.pdf PDF
HTC711-13-R-R003-0008.pdf PDF
HTC711-13-R-R003-0007.zip ZIP file
Questions_from_Industry_RFP_25_June_13.pdf PDF
HTC711-13-R-R003-0006.pdf PDF
Questions_from_Industry_RFP_21_June_13.pdf PDF
Questions_from_Industry_RFP_6_June_13.pdf PDF
HTC711-13-R-R003-0005.zip ZIP file
HTC711-13-R-R003-0004.zip ZIP file
Questions_from_Industry_RFP_17_May_13.pdf PDF
HTC711-13-R-R003-0003.zip ZIP file
PreProposal_Conference_Attendees_FBO.pdf PDF
Questions_from_Industry_RFP_15_May_13.pdf PDF
HTC711-13-R-R003-0002.zip ZIP file
Questions_from_Industry_RFP_8_May_13.pdf PDF
Pre-Proposal_Conference.pdf PDF
HTC711-13-R-R003-0001.zip ZIP file
Cover_Letter.pdf PDF
GPC_RFP_1_May_13.zip ZIP file
GPC_III_Timelines_17_Apr_13.pdf PDF
Posted_to_FBO_1_Apr_13.zip ZIP file
Synopsis_of_Draft_Solicitation.pdf PDF
Posted_to_FBO_28_Feb_13.zip ZIP file
Questions_from_Industry2.pdf PDF
GPC_III_Timelines_24_Jan_13.pptx PPTX presentation
GPC_III_Timelines.pdf PDF
Appendix_B_(Holidays).pdf PDF
GPCIII_PWS_3_Dec_12_ DRAFT .pdf PDF
Appendix_A_-_VPC_List.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Par. Ref. Category Question Government Response

1 Claims Is it possible to provide further definition to where the claims took place; during truck transport, ocean carriage, and at the VPC? This will help us determine where liability occurs.

Any historical claims data available was provided on www.fbo.gov on 1 Apr 13 under the title Draft RFP.

2 PWS 1.3.2.2.1 Claims Which repair guides are to be used to determine a fair value of any claims? Is the Government requiring specific guides to use in the US, Europe, and Asia?

Repair guides are not directed for claims purposes. All claims settlements are to be negotiated with the customer or Government entity filing the claim.

3 Claims

Can we get some clarity on the claims data? Type of claims by category would be helpful. How many claims that are settled at VPC get reclaimed at a later date? Can we receive any specific Copies of claims reports so we can analyze root cause of claims?

Any historical claims data available was provided on www.fbo.gov on 1 Apr 13 under the title Draft RFP.

4 Claims Why is there a need for an open ended claim even after the claim has been settled at the VPC?

See PWS par. 1.3.2.5. and 1.3.11.

5 PWS 1.3.4.4 Claims Can you explain why the supporting evidence on the DD788 does not release the contractor from liability?

Failure to note exceptions due to the cleanliness of the POV does not provide relief from liability.

6 Claims On spreadsheet titled GPC II Regular Claims 2003-2012.xls, what is the difference between the tabs listed LMS and the tab listed as Class?

See historical claims data posted on www.fbo.gov on 1 Apr 13 under the title Draft RFP.

7 Claims In the data provided, GPC-II Regular Claims Volume, there is a breakdown of claims filed as military, member, insurance. For clarification, what is the definition of each category?

See historical claims data posted on www.fbo.gov on 1 Apr 13 under the title Draft RFP.

8 Claims

Is it possible to provide a breakdown of the claims data by Transportation Segment? For example, there is a claims total paid out for each VPC location, but is it possible to see the breakdown of the claims based on inland, storage, and ocean carriage segment?

Any historical claims data available was provided on www.fbo.gov on 1 Apr 13 under the title Draft RFP.

9 Claims Can the claim settlement check up to $1000.00 can be for a partial release of liability? The check must be in US Dollars. Does the check have to be drawn against a US bank, or can it be drawn against a foreign bank?

Claims settlement shall be IAW PWS 1.3.11. which does not specify where checks should be drawn.

10 Claims Is there historical information regarding claims per channel available?

Any historical claims data available was provided on www.fbo.gov on 1 Apr 13 under the title Draft RFP.

11 Claims Who is responsible for claim settlements that happened prior to or during transition from incumbent?

Answer will be provided in the next round of Q&As.

12 Claims Can you define LMS and class claims (i.e., tabs in the data set)? Answer will be provided in the next round of Q&As.

13 Claims Why have the LMS claims dropped from 2 million per year to zero in the last 10 years?

Answer will be provided in the next round of Q&As.

14 Claims 1.3.11.2: This requirement says that claims should be settled in 90 days, however, the KPI report says 60, which is correct?

Answer will be provided in the next round of Q&As.

15 Claims Would it be acceptable for us to issue payment for claims on-site using something other than checks? Please expand on the requirement.

Answer will be provided in the next round of Q&As.

16 Claims Are claims to be resolved in 60 or 90 days Answer will be provided in the next round of Q&As.

17 Claims Are there online repair estimation programs that acceptable/authorized to use for estimates? Which ones?

Answer will be provided in the next round of Q&As.

18 Claims The claims packet that needs to be provided to each POV owner, is the intention for that to contain the government’s claims documents, our companies or both?

Answer will be provided in the next round of Q&As.

19 Claims Do you have historical data regarding what percentage of claims/dollars the incumbent has been able to recover from the carriers?

Answer will be provided in the next round of Q&As.

20 PWS 1.3.12.1 IT

For the website referenced in 1.3.12.1 for in-transit visibility requirements. Is there a minimum requirement for status updates, such as hourly, twice a day, daily, etc?

The website shall provide in-transit visibility IAW PWS 1.3.12.2.

Will servicemen be allowed to have their insurance lapse while vehicles are No specific requirement exists in the DTR, JTR, or JFTR for service members or DoD civilians to carry private insurance coverage in

All document references are to the Final RFP posted 1 May 13.

21 Misc Will servicemen be allowed to have their insurance lapse while vehicles are under our care?

members or DoD civilians to carry private insurance coverage in order to ship a POV under this contract. See DTR Attachment K3 "Shipping Your POV", Section H for additional information.

22 Misc Do quality control records have to be hard copy, or can it be electronic soft copy or images of scanned documents?

The PWS does not reference quality control records.

23 Misc

When a contractor inherits overseas employees by taking over GO/CO locations, what rules and labor laws are required to be considered and applied by the contractor? What are the contractual and financial obligations that we need to be aware of? For example the (TUPE) Transfer of Undertakings (Protection of Employment) regulations guarantee.

It is the contractor's responsibility to ensure contractor operations are in accordance with governing law and regulations.

24 PWS 1.3.5 Misc What is the process/procedure for Storage In –Transit (SIT)? Who gives approval for SIT? Is approval provided in writing; is an authorization number provided?

Storage In-Transit is not a PWS requirement.

25 PWS 1.3.6 Misc If a POV arrives prior to RDD and the customer is not ready for delivery, at what point is storage authorized?

Storage entitlement is a separate authorization. Shipped POVs shall remain at the VPC until customer pick-up, unless otherwise directed.

26 PWS Appendix C Misc Is there a US Citizenship requirement in order to attain the designation of Senior Customs Border Clearance Agent?

See Appendix C reference ECI 4002.01.

RFP Page 15, Paragraph (B)(3)(c)(3)(d)

Misc How can the contractor be held responsible and penalized for a missed RDD if the planned sailing of the foreign flag vessel is not met due to delays by the Contracting Officer in granting the foreign flag waiver approval?

Where the contractor follows the provisions of 252.247-7023, Transportation of Supplies by Sea, and an RDD is missed, a determination of fault will be made by the Government on a case by case basis.

28 PWS 1.3.4.3 Misc Please define the scope of the statement “The Government shall have access to all files on demand”. We believe this should be limited to solely order and customer related files, and not contractor’s proprietary and confidential files.

See PWS pars 1.3.4.3. & 1.3.15.2.

29 PWS 1.3.5.1.1 Misc Please confirm that all missed RDD’s, irrespective of cause (including delays caused by ocean carrier), will be subject to the penalty of $ 30 per day, maximum 7 days.

See PWS par. 1.3.5.1.

30 PWS 1.3.12.1 Misc In the statement “Government personnel as designated by the Program Manager shall have unlimited access to system data”, please clarify the exact data you want the Government to have unlimited access to?

See PWS par. 1.3.12.1.

31 Misc 1.3.5.2.1: Do contractor employees in the VPCs have to go to Germany to attend agricultural training or can we do a “train the trainer” for agricultural training?

Answer will be provided in the next round of Q&As.

32 Misc Can we get the call volume of customer service calls at VPC's and Centrally? Answer will be provided in the next round of Q&As.

33 Misc 1.3.7.1.2: How do we send a certified letter to APO/FPO when there is no physical address?

Answer will be provided in the next round of Q&As.

34 Misc Do we need valid insurance certificates for service member’s POVs prior to acceptance/turn-in?

Answer will be provided in the next round of Q&As.

35 Misc Is SDDC involved in the clearance processes for POVs? Can you describe what their role is in this process?

Answer will be provided in the next round of Q&As.

36 Misc Could TRANSCOM provide volumes of abandoned vehicles in OCONUS?

What is the contractors liability for abandonded vehicles in OCONUS?

Answer will be provided in the next round of Q&As.

37 Misc Are we required to take the salvage vehicle? Answer will be provided in the next round of Q&As.

38 Past Performance

The past performance evaluation weighting gives the most consideration to relevancy of past performance, meaning that only the incumbent, as the sole provider of these services for the past 15 years, will benefit from the price benefit of the tradeoff.

In this source selection, past performance and price will be weighted approximately equally. Recency and relevancy of each past performance effort provided will be considered in the overall confidence assessment rating.

39 Past Performance Would you please provide the Past Performance Questionnaire format. See RFP.

RFP, Page 40, Paragraph (b)(3) Past Performance

In discussing evaluation of Past Performance, the DRFP cautions offerors to submit “in the format specified in FAR 52.212-1.” FAR 52.212-1 does NOT specify any format for Past Performance information. Please clarify?

Past Performance proposals shall be submitted as stated in the addenda to 52.212-1.

41 Past Performance Can you provide us with Attachment L-1 (Past Performance Questionnaire)? Answer will be provided in the next round of Q&As.

42 PWS 1.3.6.3 Payment/Invoicing Do tires and batteries and other equipment that is out of scope fall under some type of “reimbursable” CLIN? How will these costs be handled?

For batteries, see PWS par. 1.3.6.2. For other repairs chargeable to the customer/Government, contractor will utilize Reimbursables, Out of Pocket CLIN, IAW Appendix E.

43 Payment/Invoicing If the detention charges are due to delays, reschedule or other action not attributable to the contractor is the contractor reimbursed?

The contractor is responsible for any charges arising from subcontracted transportation services. Detention is not included in the contract and the Government is not responsible for detention under any circumstance.

44 Appendix E Payment/Invoicing What is the required supporting documentation for billing? See Appendix E.

45 PWS Appendix E Payment/Invoicing

Is there no longer an Oversize POV (in excess of 20 Measurement Tons) surcharge? Will CLIN 0204 and 0205 only apply to Abandoned POVs in Storage? How will Abandoned POVs held at the VPC be handled and invoiced? What is the acceptable timeframe for the contractor to issue an invoice under CLIN 0100A – 0130EE for a POV delivered to destination VPC yet still on hand due to the customer’s lack of timeliness to repossess their vehicle? How is it contemplated that POVs, as diverted from their original route plan will be rated and invoiced?

See Appendix E.

46 PWS 1.3.3.1.5 Payment/Invoicing Will the contractor be reimbursed for the expenses it incurs when directed by the Government to add, delete, or relocate a VPC or Quality of Life site?

Opening and closure of VPCs will be negotiated on a case-by-case basis.

47 PWS 1.3.4.2 Payment/Invoicing Who is responsible for payment of the excess charge after it is submitted to the COR? Is it the Government or the Service Member?

See Appendix E.

48 PWS 1.3.5.2 Payment/Invoicing

In the performance of Customs clearances, should import duty, harbor maintenance fees, and other host nation import levies be imposed, please advise if these costs are for the account of the contractor. Please also confirm that the fees for intensive customs examinations, when so ordered, are for the account of the contractor.

Significant changes in foreign state levied import charges that were not anticipated or foreseen at contract formation will be handled on a case by case basis. See Appendix E.

49 PWS 1.3.5.4 Payment/Invoicing When the Government directs a change in final destination, resulting in increased cost to the contractor, how will the contractor be reimbursed?

Associated costs will be handled on a case by case basis upon request by the contractor.

50 Payment/Invoicing What is the difference between fixed pricing in tab A-1 (of the pricing template) & the mileage pricing (and kilometer pricing) on tab B-1? In which instance would each be used?

Answer will be provided in the next round of Q&As.

Attachment 3, Pricing Why is the Storage, Misc line prepopulated in each Contract year and the 6- The pre-populated amounts are totals for the line items for each applicable year added together These amounts will change as51 Pricing Schedule

Pricing month extension with $ 346,500 and $ 173,250 respectively? applicable year added together. These amounts will change as offerors insert their proposed prices in Attachment 3.

Attachment 3, Pricing Schedule Pricing

Why are estimated quantities listed in zone to zone routes for full service contract requirements when there is no full service VPC at either origin or destination for the respective zone?

See Attachment 3. Pricing represents zone to zone shipments.

Attachment 3, Pricing Schedule Pricing How do we propose pricing for shipments to and from the Chievres VPC? See Attachment 3.

Attachment 3, Pricing Schedule Pricing

Why is the Storage table pre-populated with price per unit values of 25.00 and

12.50 for Abandoned POV Monthly Rate and Abandoned POV Half Month Rate respectively? Why does the Transition table list a quantity of 8500 POV?

If this is to represent the estimate of POVs that will transition out from current contractor’s storage custody to new contractor’s storage custody, what is the estimate of POV’s that will transition from the current contractor’s in-transit shipping network? Shouldn’t offerors also price this part of the transition?

Storage rates for abandoned POVs are established by the Government. Transition quantity is based on estimated number of POVs to be transitioned at the time of contract start.

Attachment L-2, Didlake Pricing

Pricing Please explain the definition of work to be performed by Didlake for each line item.

See PWS par. 4.4.

56 Pricing How are fuel surcharges and accessorial charges handled?

There are no fuel surcharges, all other charges are billed in accordance with invoicing and payment will be IAW the payment procedures.

57 Pricing Are the current CLIN prices all inclusive to include payment of the US FLAG carriers or are these billed in a separate manner?

Invoicing and payment will be IAW the payment procedures. See 52.212-1 para 3(D)(v)(b).

Attachment 3, Pricing Schedule Pricing

For Ocean Transport, is the Bunker fuel surcharge a pass through to the Government or must it be worked into the offeror’s rates? For Inland Transportation, is truck fuel a pass through to the Government or must it be worked into the offeror’s rates? For Inland Transportation, is rail fuel a pass through to the Government or must it be worked into the offeror’s rates?

There are no pass throughs on this contract. Rates are all-inclusive.

See Addendum to 52.212-1 in RFP p.33 (v) Part V - Pricing Proposal and Appendix E.

59 PWS 4.3 Pricing

Under the premise that the offeror bases proposed pricing in the transportation rate schedule on the basis as an authorized user of USTRANSCOM ocean transportation contracts (for example, USC-07 and RDC-05S), and with the understanding that USC-07 rate refresh for effective date 9/1/2013 and new RDC-06 contract with effect on 12/1/2013, will result in changed rates and costs from current rates and costs, if these rates result in increases, can the offeror’s proposed pricing be adjusted upward accordingly to recover the increase as agreed to by USTRANSCOM in the USC-07 rate refresh and the new RDC-06 contract?

No. This is a firm fixed price contract.

60 PWS 5.0 Pricing

Motorcycles and Mopeds are mentioned within the definition of a Privately Owned Vehicle. When a motorcycle or moped is delivered to the contractor for shipment, will the contractor have to package and crate the POV for shipment?

If so, will they be paid for packing and crating?

See Attachment 3 and Appendix E.

61 RFP Attachment 5 Pricing

We note that IL is contained within the East North Central Zone and that MO is contained within the West North Central Zone. An offeror has the option to locate the required CO/CO VPC in either IL or MO and still be within geographic requirement. How will this be addressed in Attachment 3 – Pricing Schedule where estimated quantities are reflected by Zone?

See Attachment 5.

HTC711-13-R-

R003, Page 17, Paragraph EPA

Clause

Pricing

Please confirm that unit prices will be adjusted as of October 1, 2014, the second year of the base period, and not as of October 1, 2015, the first of the 3 option years. Please also confirm the unit prices will be adjusted for each of the 3 option years. Please also advise how an offeror can learn more about the two indexes that will be used for the purposes of calculating the annual unit price adjustment – are these indexes reflective of underlying cost drivers experienced by the LTL Trucking industry and the Deep Sea Freight Transportation industry, or do they represent commercial selling rates of those two industries, in which case they wouldn’t be appropriate.

Answer will be provided in the next round of Q&As.

HTC711-13-R-

R003, Page 40, Paragraph (5) Part V – Price Proposal

(A)

Pricing Please define and specify for each annual performance period the “proposed discount rate” and how this “proposed discount rate” will be applied to the TRANSFARS EPA calculated Price Index.

Answer will be provided in the next round of Q&As.

64 Pricing

SDDC has provided the estimated volume of POVs. However there is no mention of the mix of POVs (sedans, SUVs and pickups are limited to 800 cubic feet). Since the ocean rates are based on cube, the rates vary by size.

Potential bidders will need this breakout to correctly price the ocean leg.

Previously campers and boats were excluded, will that continue in GPC III

Answer will be provided in the next round of Q&As.

65 Pricing Also noted that there is no location to insert the actual ocean rates. Does SDDC want to see the ocean rates being used.

Answer will be provided in the next round of Q&As.

66 Pricing How will SDDC handle the vessel bunker fuel adjustment? Is bunker fuel included in your CPI formula and what time frame will the rates be adjusted?

Any lag could have a substantial impact on cash flow.

Answer will be provided in the next round of Q&As.

67 PWS 5.0 Pricing If included how will the cost to crate and uncrate be handled? Again there is no place on the spread sheets motorcycles.

Answer will be provided in the next round of Q&As.

68 Pricing Additionally we will need guidance for ocean rates for motorcycles. Answer will be provided in the next round of Q&As.

69 Pricing How will the strip and stuff charges be handled? Answer will be provided in the next round of Q&As.

70 Pricing How will the drayage charges to and from the ports be handled? Answer will be provided in the next round of Q&As.

71 Pricing Where do we insert rates for hard-lifts? Answer will be provided in the next round of Q&As.

72 Pricing There are a few POVs that move to and from Canada. Where do we insert the Canada rates?

Answer will be provided in the next round of Q&As.

73 Pricing Where do we price claims estimates and charges Answer will be provided in the next round of Q&As.

74 Pricing

The Didlake portion has two tabs labeled FFP Portion and Per POV Portion.

On the FFP portion there is volume numbers plus Monthly and Annual Costs with no correlation between the two. This appears to be a double payment.

The $1,097,406 is the total annual operating cost. If you also add the Per POV Portion, Didlake will have been paid twice for the same work. This needs to be clarified with Didlake and the potential bidders.

Answer will be provided in the next round of Q&As.

75 Pricing

What costs do you wanted to be included in the VPC Monthly Operations charge on Tab B-1 MISC and what cost do you wanted included in Tab A-1 Tx Prices. In order to provide you the costs, bidders need to know what specifics SDDC expect to be included.

Answer will be provided in the next round of Q&As.

76 Pricing What specific types of moves will be included for [trucking CONUS and OCONUS] rates?

Answer will be provided in the next round of Q&As.

77 Pricing Labor rates provided are from 2011 and have been updated for 2012. Which rates do you want bidders to use and will you update for 2012. Additionally, what will be the process if the rates are again increase prior to contract start?

Answer will be provided in the next round of Q&As.

78 Pricing On the pricing template there used to be a transportation cost to move to and from storage locations. Since it is no longer there, where would a contractor Answer will be provided in the next round of Q&As.

price transition to and from storage locations?

79 Pricing

There are three regions in the US that we are asked to price that do not have VPCs, and there are partial service locations where service is not part of scope of work? Why are we being asked to price these items? Please reference pricing in Tab A-1: Tx Prices (of the pricing template)

Answer will be provided in the next round of Q&As.

80 Pricing Can government provide details on the historical measurement tons (MsT) of vehicles processed over the past contract term? The contractor needs this in order to price ocean shipments.

Answer will be provided in the next round of Q&As.

81 Pricing

Does the Government intend for the Contractor to include the cost of VPC processing into the Monthly Operations charge or into the Transportation Zone rates? Since the volume will be variable, particularly with the change in VPC’s from 13 to 9, it will be difficult to estimate the POV throughput

Answer will be provided in the next round of Q&As.

82 Pricing Storage in OCONUS. Where would contractors price the movement of the vehicle to storage? This is a CLIN in the current contract, but not in the Draft

RFP.

Answer will be provided in the next round of Q&As.

83 Pricing

As an authorized agent under the USC or RDC contract, how will the accessorials be handled? Particularly BAF, CAF, and FAF. Since these change every month with the Economice Price Adjustment Clause, how would a contractor fix a rate for even one year when these are changing so frequently?

Answer will be provided in the next round of Q&As.

84 Pricing When the USC contract is renewed each year with new prices, how would the GPC contract’s fixed door to door transportation prices stay in line with these changes?

Answer will be provided in the next round of Q&As.

85 Pricing Is the contractor mandated to use the USC contract for linehaul movement to/from the ports, or just the port-to-port rates?

Answer will be provided in the next round of Q&As.

86 Pricing Could you explain how the Government intends to use the EPA clause inserted into the Draft RFP? For which fees? How does this relate to the Carrier EPA's in the USC contract that we are to use as Authorized Agents.

Answer will be provided in the next round of Q&As.

87 Pricing

Can you confirm that the Ocean transportation rates that we will be using (as Authorized Agents) are the pre-negotiated rates that are currently in the USC 7 contract. There will be no difference in the rates that the carrier charges SDDC for the same movement of goods.

Answer will be provided in the next round of Q&As.

88 RFP We would like to formally request at least 60 days to respond to this RFP. See the RFP for proposal due date.

RFP, Page 34, Paragraph 1.(b)(1)(A)

RFP

The Draft RFP does not have Section Headings which precludes including the Section identifier in the communication format as specified. Will the traditional Section Headings be included in the final RFP?

See RFP.

RFP, Page 33, Paragraph 1.(b)

RFP

This paragraph specifies a proposal submission deadline of 4:30 pm on 28 May 13. The SF 1449 specifies 4:00 pm on 28 May 13. Which is correct?

See RFP.

RFP, Page 34, Paragraph 1.(b)(3)(B)

RFP Are 11X17 inch foldouts permitted for large graphics/tables? No, proposals shall be submitted IAW the RFP.

92 RFP Can we get a draft of the applicable FAR clauses? See RFP.

93 RFP Page 1 RFP

Block 12 of the SF 1449 must be completed. We understand block 12 is used to offer the Government a prompt payment discount. Standard terms are net 30 from date of invoice. If an offeror elects to offer the Government a prompt payment discount, what are the payment terms? Is payment made within 7 days, 14 days, 21 days, other?

See RFP.

94 Storage What are the Insurance requirements and types during long term storage?

Contractor responsible to determine proper insurance coverage to meet RFP requirements and maintain the POV IAW the PWS.

95 PWS 1.3.6.1 Storage Does the 14 day threshold apply only to CONUS VPC turn ins for storage, or does it also apply to OCONUS VPC location turn ins?

See PWS par. 1.3.6.1.

96 PWS 1.3.6.2 Storage Please clarify “vehicle manufacturer’s recommendations” for maintaining operability while in storage. To the best of our knowledge, vehicle manufacturers do not issue such recommendations.

See PWS par. 1.3.6.1.

97 PWS 1.3.3.2 Storage

Please advise the requirements surrounding indoor or outdoor storage under the Storage requirements? If both, please break-down storage data provided by indoor and outdoor storage. What personnel are entitled to indoor storage?

What percent a year goes to indoor storage?

All storage facilities shall be indoors IAW PWS 1.3.3.2. and 1.3.6.

98 Storage On the document titled GPC II Storage Turn-In Volume 2012.xlsx the storage numbers seem to double during October and November. Is this accurate or is this related to the fiscal year billing cycle?

Information is accurate.

99 Storage What are the minimum requirements for the preventative maintenance program?

The PWS does not reference preventative maintenance.

RFP, Page 35, Paragraph 1.(b)(3)(D)(ii)(b)

Technical

The VPC facilities to be addressed as part of the response to Subfactor 2 are provided in an appendix (Appendix A) to the RFP. Given the very limited page count for Subfactor 2 (10 pages to address 11 issues), can the offeror’s descriptions of its proposed VPC responses be included as an attachment that does not count against the Subfactor 2 page limitation?

See page limitation in the RFP.

101 PWS Appendix A Technical Will the offeror need to identify the actual location and land / building specifications for all required CO/CO facilities? If so, how and where should this information be submitted?

Yes, see RFP p. 32 (ii) Part II - Technical.

102 Transition

By including transition cost in the Total Evaluated Price of a follow on contract, the incumbent will always have a very unfair advantage. It has been our experience that these costs are not usually included in the evaluated price for this reason.

This acquisition is being conducted as a best value source selection.

Consideration of price is part of the best value source selection process.

103 Transition For vehicles in transit at transition time, what is the government’s stance on assuring that shipments are billed to the original contractor so there are no split fees?

Answer will be provided in the next round of Q&As.

104 Transition Are there any POV deliveries that will take more than 90 days during the transition period?

Answer will be provided in the next round of Q&As.

105 Transportation Can you post any detailed historical Motorcycle volume? Information is not available.

106 Transportation Who can request/approve a diversion or reconsignment ? See PWS par. 1.3.5.4.

107 Transportation

Mitigation (of advanages to the incumbent due to existing relationships with certain ocean carriers ) can be accomplished by simply requiring ocean shipping to be a government directed service with a direct pass-through of cost with no mark up, the same as it is today.

The Government's requirement allows for the prime contractor to utilize USTRANSCOM ocean contracts as an authorized user or to subcontract independently for ocean services. This allows offerors to derive their own best solution for meeting the end-to end transportation requirement. Pricing for ocean carriage wil be considered in the overall transportation price developed by the offeror

108 PWS 4 2 T t ti Do we need an NVOCC license to book freight under the USC contract, or will b th i d t f th US G ’t? If th l tt ill h t Contractor will be an authorized user IAW the PWS. All bookings

108 PWS 4.2 Transportation we be authorized agents of the US Gov’t? If the latter, will we have access to the GBL that is issued, or will we be creating our own B/L?

Contractor will be an authorized user IAW the PWS. All bookings will be direct with the ocean carriers.

109 Transportation It is customary for the port to offer handling services to load vehicles into containers where/when necessary. Can this be done at the VPC if the Contractor desires?

The RFP does not direct where stuffing/unstuffing of containers will take place.

110 Transportation

Since the availability of US Flag RORO vessels is scarce in some of the shipping lanes, can you advise if the Government has in the past supported a Foreign Flag Waiver from MARAD for RORO vessels even when US Flag Container vessels are available? It is unclear whether this is adequate justification under the law to obtain a foreign flag waiver. Please advise the Government’s experience in this area.

See clause 252.247-7023 Transportation of Supplies by Sea.

111 Transportation Does the US Flags pricing include stuffing and unstuffing of containers? If not, what are the current rates and how is this billed back to the government?

Invoicing and payment will be IAW the payment procedures. See 52.212-1 para 3(D)(v)(b).

112 Transportation Containerization: Which sites/destinations require containerization at the VPC vice at the port by the FLAG Ship?

Shipping requirements in accordance with PPCIG are contractor's responsibility.

113 Transportation The destination often just lists a region or a country, is there any specific information regarding the destinations?

All shipments will be performed based on the service member's entitlement, the vast majority of which will be from VPC to VPC, however zone-to-zone pricing allows for shipping to/from any destination within a given zone when entitlement for such service outside the VPC network exists. See Defense Travel Regulation (DTR), Joint Travel Regulation (JTR), and Joint Federal Travel Regulation (JFTR) for entitlement information

114 Transportation Can we use the government’s system (GDS/IBS) for freight shipping, or are we responsible for freight forwarding as well?

Access to GDS/IBS will not be granted.

115 Transportation The “wait time” for receiving authorization to use a foreign flag vessel may be several days according to Appendix J. Is this wait time subtracted from the required delivery days?

There is no Appendix J in this RFP.

116 PWS 1.3.5.7 Transportation Who at the Government is responsible for arranging ocean transportation under this PWS provision?

SDDC.

117 PWS 1.3.5.7 Transportation What is the annual percentage of POVs that fall into the hardlift shipment category?

See historical information posted to www.fbo.gov on 28 Feb 13.

118 Transportation We noticed in the data that there was service to Japan, however, no VPC’s were listed there. In these instances does our liability end at the port of debarkation?

See PWS Appendix D for shipping instructions to Japan.

119 Transportation There is not volume listed for motorcycles. Will motorcycles be included in

GPC III?

Answer will be provided in the next round of Q&As.

120 Transportation Will we be using IBS to make carrier bookings and will the government provide us with a government bill of lading (GBL)?

Answer will be provided in the next round of Q&As.

121 Transportation

Describe the customs clearance process, SDDC’s involvement if any, and any SOFA or other agreements that the US holds with foreign countries that will define the documentation requirements. What exactly does the contractor need to do in order to clear customs on behalf of the Government. Are we to follow the same policies as the USC contract where the Goverrment has much of the responsibility in the process?

122 VPCs If the vehicle weight is not available in the owner’s manual or a commercial data sheet, does the VPC have to be able to weigh the vehicle?

There is no requirement in the PWS to weigh the POV.

123 VPCs Will the Government facilitate site visits to VPCs?

The acquisition office does not have the authority to grant/facilite offeror site visits to VPC locations, however, does not object to arrangement made directly by bidders.

124 PWS 1.3.8.1 VPCs Please advise if washing and drying of POV’s prior to customer receipt will be excepted as well at CO/CO VPC’s that are responsible for abiding to local regulations forbidding same, such as EPA type of regulations?

See PWS par. 1.3.8.1.

125 PWS Appendix A VPCs The location details for the Izmir, Turkey VPC is TBD. When will this be defined?

See Appendix A.

126 VPCs Please provide the average dwell time after a vehicle is processed at a VPC both inbound and outbound. This will assist us in sizing the appropriate space at each VPC.

Requested information is not available.

127 VPCs

I noticed that on the VPC list dated March 19 and posted April 1 that Orlando, New Orleans and Oakland were not on the list. Were these left of inadvertently or are we closing those VPCs with the end of GPC II?

Appendix A containing the VPC list is correct.

128 PWS 3.1.1 VPCs Please define “enclosed” as it relates to the VPC requirements? Does this need to be fully enclosed, partially enclosed, tented?

The Government will provide VPC facilities at the GO/CO locations identified in Appendix A. Facilities will include an enclosed inspection area.

129 VPCs Can you elaborate on the services that will be provided at GO/CO locations, particularly as they relate to ability to tow a vehicle, storage space available, security guards and fencing? COR furniture/computer/etc…

Government furnished property will be provided IAW the PWS.

130 VPCs Are contractors required to have full-time employees at GO/CO sites, even if appointment setting is implemented?

Hours of operation are listed in Appendix A.

131 VPCs What specifically are the POV washing requirements, volume per year and site?

See PWS paras 1.3.4.4. and 1.3.6.1. Volume will be based on the requirements of these paragraphs. In addition, there may be washing requirements in order to meet customs regulations which is the responsibility of the contractor.

132 VPCs The bathroom facilities that meet Host Nation standards may not meet American standards, like flush toilets. Is this acceptable?

See PWS par. 1.3.3.1.3.

133 VPCs Do gate closures referenced count against the one hour customer processing time metric?

The PWS does not reference gate closures.

134 VPCs Does this wash activity occur off-base or are wash facilities required at each

VPC?

Washing shall be accomplished in order to meet PWS requirements.

135 VPCs What percentage of VPC locations have been changed per year, during the last 10 years?

Over the course of the contract, sites have been opened and closed for various reasons. Under the current PWS, opening and closure of VPCs will be negotiated on a case-by-case basis.

136 VPCs If a Government owned facility is the cause of a violation due to poor maintenance or building code changes, why is it the contractor that must bear the cost of improvements to correct the violation?

This is not required by the PWS.

137 VPCs

The draft PWS discusses the facilities (COCO) in several sections. Just to be clear, the COCO facilities (except for Norfolk) are not expected to turned over/made available to the “winner”. It is expected that the winner procure/lease/rent new space within the requested radius of the airport per the

PWS?

The contractor is responsible for providing all CO/CO facilities, including Norfolk.

138 PWS Appendix A VPCs

Please reconfirm the required Quality of Life Sites. This appendix lists three locations – Lisbon, Madrid, and Ankara. In contrast, in Attachment 3 – Pricing Schedule, the QoL Appointment Surcharge schedule lists Madrid, Lisbon twice, Ankara, and Souda Bay. These two sections should be reconciled

Answer will be provided in the next round of Q&As.

139 PWS Appendix B VPCs Bahrain National Holidays 2006 is what is reflected. Is the “2006” a typo? Do the Holidays in the US also apply to Guam, or will Guam holidays be separately li t d d d t il d?

See Appendix B.

listed and detailed?

140 PWS Appendix D VPCs

Please reconfirm the need for partial service for La Maddalena, Sardinia, Italy.

Please confirm if partial service for Stavager, Norway is discontinuing in GPC III. Please confirm and explicitly define the offerors responsibility for arranging and paying for ocean transportation for each location and for both inbound to that location and for outbound from that location.

Answer will be provided in the next round of Q&As.

141 PWS 1.3.3.1.2 VPCs How does this apply specifically to Bahrain which does not have the equivalent of toll free telephone service?

See PWS par. 1.3.3.1.2.

Attachment 3, Pricing Schedule VPCs

Why is Norway and Greece reflected as an origin and a destination in the Full Service section of the schedule? Why is Papa Hungary listed in the Partial Service section of the schedule?

See Attachment 3. Pricing represents zone to zone shipments.

Attachment 4, Transit Times

VPCs Why are Hungary and New Zealand listed as Partial Service locations, when they are not listed in Appendix D?

Answer will be provided in the next round of Q&As.

144 VPCs VPC’s have been reduced from 13 to 9 in the US. Can you tell us the new estimated volumes per VPC?

Answer will be provided in the next round of Q&As.

145 VPCs Is the COR expected to have a permanent office at the VPC or is this a transient office? If transient, how often would the COR be expected?

Answer will be provided in the next round of Q&As.

146 VPCs

Why is the Hawaii VPC requirement within 5 miles of the airport if all other CONUS locations can be 25 miles from the airport? This requirement could be unfairly favorable to the incumbent. Would TRANSCOM consider changing the requirement to 25 miles?

Answer will be provided in the next round of Q&As.

147 VPCs Will GO/CO sites have equipment (GFE) to be able to load POV’s into containers, or will the contractor be responsible for placing this on site of a Government installation?