JFAST Questions and Answers 21(7.24.09).pdf

PDF 8 KB Posted

Attached to
Joint Flow And Analysis System For Transportation (JFAST)
Solicitation number
HTC711-09-R-0036
Issued by

About this file

JFAST Questions and Answers 21 (7.24.09)

View the file

Other files

File Type Posted
JFAST Questions and Answers 24 —
JFAST Questions and Answers 23 —
HTC711-09-R-0036-0002.pdf PDF
JFAST Questions and Answers 22 —
HTC711-09-R-0036-0001.pdf PDF
JFAST Questions and Answers 17 thru 20 —
JFAST Q A 6 - 16 —
JFAST Questions and Answers 1 thru 5 —
Attachment 5 —
Attachment 11 —
Attachment 3 —
Attachment 3 —
Attachment 1 —
Attachment 8 —
Attachment 6 —
Attachment 2(Contact Information).doc DOC document
Attachment 9 —
Attachment 1(Past Performance Questionnaires) rev 1.docx DOCX document
Attachment 7 —
HTC711-09-R-0036.pdf PDF
Attachment 4 —
Attachment 10 —
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HTC711-09-R-0036

JOINT FLOW AND ANALYSIS SYSTEM FOR TRANSPORTATION

QUESTIONS & ANSWERS

24 JUL 09

Q21. Request clarification and amplification of Task Order 0001, PWS paragraph 1.3.11.12:

(a) What is definition of port operation enablers?

(b) Does “being deployed at runtime” indicate JFAST need to check data from external, non- JFAST system regarding port data before the scheduler run starts?

(c) Does the requirement mean that the schedulers will access port operation data before execution or during execution?

A21. In reply:

(a) The intent of the port operation enablers is to allow the planner the flexibility to automatically turn on or increase the cargo processing capacity of a port as a result of the modeled arrival of forces and equipment at the port that are earmarked to support the port's operations.

(b) The phrase "being deployed at runtime" refers to the modeled movement of the port enablers to their assigned port of operations based on the JFAST scenario's transportation constraints.

This does not involve a data check with an external non-JFAST system.

(c) The scheduler accesses port operation data during execution. JFAST automatically evaluates the flow of the port enabler capabilities in the force flow as the means to predict increased port capacity. In the absence of a validated authoritative port operations database, the JFAST user manually searches and establishes the baseline capacities.