Attachment_6A_-_Price_Element_Breakdown_Instructions_-_Aug_2013_Version.doc

DOC document 52 KB Posted

Attached to
Protective Security Officer Federal contract opportunity
Solicitation number
HSHQEC-13-R-00013
Issued by
Department of Homeland Security Office of Procurement Operations

About this file

Attachment 6A Instructions for the price element breakdown

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6 - Supplement

Instructions for the Price Element Breakdown Template

Introduction This Price Element template is a Microsoft Excel based pricing tool that provides a standardized format for costing a PSO labor hour rate. The template was designed to assist contractors in pricing their proposal. Contractors choosing to use the template should only complete those cost elements, which apply to their proposal. The cost data provided in these worksheets are considered other than certified cost pricing data as discussed under FAR 15.403-5(b)(2).

Instructions for Completion

1. Please provide the name of your company and the solicitation number for your submission in the header section of the “Model for Price Realism” worksheet.

2. Note that the Price Breakdown file contains three worksheet tabs entitled, “Model for Price Realism”, “Relief”, and “Non-PSO Position”. The offeror shall input the cost amounts for those elements listed on the template that apply except for the Non-PSO Positions.

3. Cost data for the Non-PSO Positions shall be entered under the “Non-PSO Position” worksheet tab as instructed by the notes found on the worksheet. Total costs for the Non-PSO positions identified under the “Non-PSO Position” worksheet tab will automatically populate the “Model for Price Realism” worksheet tab under the Non-PSO Position line item.

4. The “Relief” worksheet tab does not self-populate to the “Model for Price Realism” worksheet tab. The purpose of the “Relief” worksheet is to provide specific cost data regarding relief and breaks that was included in the offeror’s proposal. The “Relief” worksheet tab provides detailed instructions on completing the worksheet and required narrative on the basis of estimate. Note that the narrative requires that the offeror identify which cost elements from the "Model for Price Realism" worksheet contain the break and relief costs included in each identified element. For example, if the Relief line item from the “Model for Price Realism” includes $1,000 for paid break costs and $200 for Relief Officer travel, the offeror would identify as such in their narrative. If the wages, taxes, and fringe cost elements include $1,200 for the PSO relief costs, such amounts shall be identified in the narrative. The narrative also requires that the offeror detail the basis of estimate for determining the paid break and/or lunch hours priced into the proposal.

5. Rows 6, 15, 31, 39, 80, 86, and 90 automatically calculate applicable totals, therefore data should not be inputted into these rows. Row 92 automatically calculates the labor hour rate applicable to the inputted data; therefore data should not be inputted into this row.

6. Rows 76-78 provide for the option to insert “Other” price elements, which are not included in the standardized listed elements. If including “Other” price elements, list a descriptor of each element in the applicable worksheet cell. If additional “other” price elements are needed for the breakdown, please insert rows under 79 and list the additional elements.

7. Additional worksheets may be provided to explain any subsidiary calculations used to determine the pricing amounts in the template.

8. The worksheet is not locked and may be adjusted by the offeror as appropriate.

August 2013 Version

File details come from the government source that posted it. Updated .