Contract Terms Conditions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 000006.pdf | ||
| HSHQEC-11-R-00012_Past_Performance_Questionaire_-_Attachment_4.pdf | ||
| Amendment 000005 and SF-30 Continuation Sheet.pdf | ||
| Cover Page CBA-2010-3275 Revision 2.pdf | ||
| Onsite Supervisory Post Exhibit - Attachment 9.xls | XLS spreadsheet | |
| Amendment 004.pdf | ||
| Amendment 000003.pdf | ||
| Amendment 000002.pdf | ||
| Amendment 000001.pdf | ||
| CBA-2010-3275 Franconia Building.pdf | ||
| CBA-2010-3632 SSA locations.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Non_Disclosure_Agreement_form_-_Attachment_7.pdf | ||
| CBA2010-3525 - DEA Warehouse.pdf | ||
| CBA-2011-4137 Social Security Meg Site.pdf | ||
| Notice To Offerors.pdf | ||
| Award Approval Request | — | |
| SOW EXHIBITS | — | |
| Copy of HSHQEC-11-R-00012_Price_Element_Breakdown_Attachment_6.xls | XLS spreadsheet | |
| SOW | — | |
| Past Project Form.pdf | ||
| SF 1449 pricing schedule.pdf | ||
| Table of Contents.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Homeland Security Washington, DC 20528
SOLICITATION/CONTRACT FOR COMMERCIAL ITEMS
SECTION C
CONTRACT CLAUSE
I. FAR 52.212-4 Contract Terms and Conditions—Commercial Items (Alt. I) (JUNE 2010)
(a) Inspection/Acceptance.
(1) The Government has the right to inspect and test all materials furnished and services performed under this contract, to the extent practicable at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government will perform inspections and tests in a manner that will not unduly delay the work.
(2) If the Government performs inspection or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.
(3) Unless otherwise specified in the contract, the Government will accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they will be presumed accepted 60 days after the date of delivery, unless accepted earlier.
(4) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in paragraph (a)(6) of this clause, the cost of replacement or correction shall be determined under paragraph (i) of this clause, but the “hourly rate” for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. Unless otherwise specified below, the portion of the “hourly rate” attributable to profit shall be 10 percent.
The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. [Insert portion of labor rate attributable to profit.] (5)
(i) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may—
August 2010
(A) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract; or
(B) Terminate this contract for cause.
(ii) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute under the Disputes clause of the contract.
(6) Notwithstanding paragraphs (a)(4) and (5) above, the Government may at any time require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to--
(i) Fraud, lack of good faith, or willful misconduct on the part of the Contractor’s managerial personnel; or
(ii) The conduct of one or more of the Contractor’s employees selected or retained by the Contractor after any of the Contractor’s managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.
(7) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.
(8) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.
(9) Unless otherwise specified in the contract, the Contractor’s obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C.3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233- 1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
Addendum to FAR 52.212-4 Contract Terms and Conditions – Commercial Items, notwithstanding the claim period stated in FAR 52.233-1 Disputes, and pursuant to FAR 33.206, initiation of a claim, the contractor agrees to submit any claim related to this contract within 12 months after accrual of the claim.
(e) Definitions.
(1) The clause at FAR 52.202-1, Definitions, is incorporated herein by reference. As used in this clause—
(i) Direct materials means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.
(ii) Hourly rate means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualifications of a labor category specified in the contract that are—
(A) Performed by the contractor;
(B) Performed by the subcontractors; or
(C) Transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
(iii) Materials means—
(A) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the contractor under a common control;
(B) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;
(C) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.);
(D) The following subcontracts for services which are specifically excluded from the hourly rate: [Insert any subcontracts for services to be excluded from the hourly rates prescribed in the schedule.]; and
(E) Indirect costs specifically provided for in this clause.
(iv) Subcontract means any contract, as defined in FAR Subpart 2.1, entered into with a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract including transfers between divisions, subsidiaries, or affiliates of a contractor or subcontractor. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include --
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer—Other Than Central Contractor Registration), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C.
3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payments.
(1) Services accepted. Payments shall be made for services accepted by the Government that have been delivered to the delivery destination(s) set forth in this contract. The Government will pay the Contractor as follows upon the submission of commercial invoices approved by the Contracting Officer:
(i) Hourly rate.
(A) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the contract by the number of direct labor hours performed. Fractional parts of an hour shall be payable on a prorated basis.
(B) The rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract. Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by individuals that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.
(C) Invoices may be submitted once each month (or at more frequent intervals, if approved by the Contracting Officer) to the Contracting Officer or the authorized representative.
(D) When requested by the Contracting Officer or the authorized representative, the Contractor shall substantiate invoices (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment, individual daily job timecards, records that verify the employees meet the qualification s for the labor categories specified in the contract, or other substantiation specified in the contract.
(E) Unless the Schedule prescribes otherwise, the hourly rates in the Schedule shall not be varied by virtue of the Contractor having performed work on an overtime basis.
(1) If no overtime rates are provided in the Schedule and the Contracting Officer approves overtime work in advance, overtime rates shall be negotiated.
(2) Failure to agree upon these overtime rates shall be treated as a dispute under the Disputes clause of this contract.
(3) If the Schedule provided rates for overtime, the premium portion of those rates will be reimbursable only to the extent the overtime is approved by the Contracting Officer.
(ii) Materials.
(A) If the Contractor furnishes materials that meet the definition of a commercial item at FAR 2.101, the price to be paid for such materials shall be the contractor’s established catalog or market price, adjusted to reflect the--
(1) Quantities being acquired; and
(2) Any modifications necessary because of contract requirements.
(B) Except as provided for in paragraph (i)(1)(ii)(A) and (D)(2) of this clause, the Government will reimburse the Contractor the actual cost of materials (less any rebates, refunds, or discounts received by the contractor that are identifiable to the contract) provided the Contractor—
(1) Has made payments for materials in accordance with the terms and conditions of the agreement or invoice; or
(2) Makes these payments within 30 days of the submission of the Contractor’s payment request to the Government and such payment is in accordance with the terms and conditions of the agreement or invoice.
(C) To the extent able, the Contractor shall—
(1) Obtain materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials; and
(2) Give credit to the Government for cash and trade discounts, rebates, scrap, commissions, and other amounts that are identifiable to the contract.
(D) Other Costs. Unless listed below, other direct and indirect costs will not be reimbursed.
(1) Other direct Costs. The Government will reimburse the Contractor on the basis of actual cost for the following, provided such costs comply with the requirements in paragraph (i)(1)(ii)(B) of this clause: [Insert each element of other direct costs (e.g., travel, computer usage charges, etc. Insert “None” if no reimbursement for other direct costs will be provided. If this is an indefinite delivery contract, the Contracting Officer may insert “Each order must list separately the elements of other direct charge(s) for that order or, if no reimbursement for other direct costs will be provided, insert ‘None’.”]
(2) Indirect Costs (Material handling, Subcontract Administration, etc.). The Government will reimburse the Contractor for indirect costs on a pro-rata basis over the period of contract performance at the following fixed price: [Insert a fixed amount for the indirect costs and payment schedule. Insert “$0” if no fixed price reimbursement for indirect costs will be provided. (If this is an indefinite delivery contract, the Contracting Officer may insert “Each order must list separately the fixed amount for the indirect costs and payment schedule or, if no reimbursement for indirect costs, insert ‘None’.”]
(2) Total cost. It is estimated that the total cost to the Government for the performance of this contract shall not exceed the ceiling price set forth in the Schedule and the Contractor agrees to use its best efforts to perform the work specified in the Schedule and all obligations under this contract within such ceiling price. If at any time the Contractor has reason to believe that the hourly rate payments and material costs that will accrue in performing this contract in the next succeeding 30 days, if added to all other payments and costs previously accrued, will exceed 85 percent of the ceiling price in the Schedule, the Contractor shall notify the Contracting Officer giving a revised estimate of the total price to the Government for performing this contract with supporting reasons and documentation. If at any time during the performance of this contract, the Contractor has reason to believe that the total price to the Government for performing this contract will be substantially greater or less than the then stated ceiling price, the Contractor shall so notify the Contracting Officer, giving a revised estimate of the total price for performing this contract, with supporting reasons and documentation. If at any time during performance of this contract, the Government has reason to believe that the work to be required in performing this contract will be substantially greater or less than the stated ceiling price, the Contracting Officer will so advise the Contractor, giving the then revised estimate of the total amount of effort to be required under the contract.
(3) Ceiling price. The Government will not be obligated to pay the Contractor any amount in excess of the ceiling price in the Schedule, and the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the Schedule, unless and until the Contracting Officer notifies the contractor in writing that the ceiling price has been increased and specifies in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract. When and to the extent that the ceiling price set forth in the Schedule has been increased, any hours expended and material costs incurred by the Contractor in excess of the ceiling price before the increase shall be allowable to the same extent as if the hours expended and material costs had been incurred after the increase in the ceiling price.
(4) Access to records. At any time before final payment under this contract, the Contracting Officer (or authorized representative) will have access to the following (access shall be limited to the listing below unless otherwise agreed to by the Contractor and the Contracting Officer):
(i) Records that verify that the employees whose time has been included in any invoice met the qualifications for the labor categories specified in the contract.
(ii) For labor hours (including any subcontractor hours reimbursed at the hourly rate in the schedule), when timecards are required as substantiation for payment—
(A) The original timecards (paper-based or electronic);
(B) The Contractor’s timekeeping procedures;
(C) Contractor records that show the distribution of labor between jobs or contracts; and
(D) Employees whose time has been included in any invoice for the purpose of verifying that these employees have worked the hours shown on the invoices.
(iii) For material and subcontract costs that are reimbursed on the basis of actual cost—
(A) Any invoices or subcontract agreements substantiating material costs; and
(B) Any documents supporting payment of those invoices.
(5) Overpayments/Underpayments. Each payment previously made shall be subject to reduction to the extent of amounts, on preceding invoices, that are found by the Contracting Officer not to have been properly payable and shall also be subject to reduction for overpayments or to increase for underpayments. The Contractor shall promptly pay any such reduction within 30 days unless the parties agree otherwise. The Government within 30 days will pay any such increases, unless the parties agree otherwise. The Contractor’s payment will be made by check. If the Contractor becomes aware of a duplicate invoice payment or that the Government has otherwise overpaid on an invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected contract line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6)
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury, as provided in section 611 of the Contract Disputes Act of 1978 (Public Law 95-563), which is applicable to the period in which the amount becomes due, and then at the rate applicable for each six month period as established by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final Decisions. The Contracting Officer will issue a final decision as required by
33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt in a timely manner;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR 32.60702).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(viii) Upon receipt and approval of the invoice designated by the Contractor as the “completion invoice” and supporting documentation, and upon compliance by the Contractor with all terms of this contract, any outstanding balances will be paid within 30 days unless the parties agree otherwise. The completion invoice, and supporting documentation, shall be submitted by the Contractor as promptly as practicable following completion of the work under this contract, but in no event later than 1 year (or such longer period as the Contracting Officer may approve in writing) from the date of completion.
(7) Release of claims. The Contractor, and each assignee under an assignment entered into under this contract and in effect at the time of final payment under this contract, shall execute and deliver, at the time of and as a condition precedent to final payment under this contract, a release discharging the Government, its officers, agents, and employees of and from all liabilities, obligations, and claims arising out of or under this contract, subject only to the following exceptions.
(i) Specified claims in stated amounts, or in estimated amounts if the amounts are not susceptible to exact statement by the Contractor.
(ii) Claims, together with reasonable incidental expenses, based upon the liabilities of the Contractor to third parties arising out of performing this contract, that are not known to the Contractor on the date of the execution of the release, and of which the Contractor gives notice in writing to the Contracting Officer not more than 6 years after the date of the release or the date of any notice to the Contractor that the Government is prepared to make final payment, whichever is earlier.
(iii) Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable incidental expenses, incurred by the Contractor under the terms of this contract relating to patents.
(8) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C 3903) and prompt payment regulations at 5 CFR part 1315.
(9) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(10) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid an amount for direct labor hours (as defined in the Schedule of the contract) determined by multiplying the number of direct labor hours expended before the effective date of termination by the hourly rate(s) in the contract, less any hourly rate payments already made to the Contractor plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system that have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 3701, et seq., Contract Work Hours and Safety Standards Act; 41 U.S.C. 51-58, Anti-Kickback Act of 1986; 41 U.S.C. 265 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with Laws Unique to Government Contracts paragraphs of this clause.
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) Central Contractor Registration (CCR).
(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete.
Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(2)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227- 2423, or 269-961-5757.
(End of Clause)
II. ADDENDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS —
COMMERCIAL ITEMS (Alternate I) (JUNE 2010)
01. DESCRIPTION OF SERVICES
The Contractor shall furnish professional security services, defined in the statement of work and contract exhibits, as Protective Security Officer (PSO) and related services, at federally owned, leased or occupied facilities protected by the Federal Protective Service at various locations primarily located in but not limited to 6810 Loisdale Road Springfield, VA; 8701 Morrissette Drive Springfield, VA;
8600 Morrisette Drive Springfield, VA; 2100 M Street NW Washington, DC; 2041 Martin Luther King Jr. Ave. SE Washington, DC; 1905 B 9th Street NE Washington, DC; and 400 Virginia Ave. SW Washington, DC. In furnishing these services, the Contractor shall provide all necessary management, supervision, personnel, materials, supplies and equipment except as otherwise indicated, and shall plan, schedule, coordinate and ensure effective performance of, and conformance to, all aspects of the statement of work contained herein.
02. CONTRACT TYPE
Services shall be furnished via a Requirements Labor Hour Contract with fixed hourly rates. Resultant task orders under this contract will be Labor Hour type.
03. ESTIMATED QUANTITIES
a. The contract maximum is the total awarded price, inclusive of all optional ordering periods (to include the 6 month option available under FAR 52.217-8).
The contract maximum is considered to be the “ceiling” price.
b. The Schedule of Supplies/Services and Prices (i.e. the Schedule) sets forth the estimated quantity of hours that the Government may order per each stated ordering period. The estimated quantities set forth in the Schedule are based upon the current, known service requirement with adjustments to provide for maximum ordering flexibility. The current, known service requirements are set forth in the attached Post Coverage Exhibits and are provided for informational purposes only. The Government reserves the right to order up to the estimated http://www.ccr.gov/ quantities set forth in the Schedule regardless of the contents of the Post Coverage Exhibits attached to this contract to address unforeseen requirements such as the addition of new posts/buildings/location and/or expansion of duty hours at existing posts.
c. Each task order issued under this contract will be issued for the actual known service requirements at that time, will be accompanied by a Post Coverage Exhibit and will set forth a ceiling price in the task order Schedule which will be subject to the labor hour provisions found at FAR 52.212-4 (Alternate 1).
Contractors will be paid only for services ordered and performed at the established hourly rates as contained in the task orders. The Government has the unilateral right to add, decrease, cancel, or modify services stated in each task order issued at the established unit prices, as long as the change is within the scope of the contract and the associated task order. The cumulative total of all orders issued under the contract shall not exceed the contract maximum price and/or estimated quantities unless and until the Contracting Officer notifies the contractor in writing that the contract maximum price has been increased and specifies in the notice a revised maximum price that shall constitute the maximum price for performance under this contract.
04. PRICES
a. Department of Labor (DOL) Wage Determination (WD) and/ or Collective Bargaining Agreement (CBA)
1. The minimum wage rates and fringe benefits applicable to the contract are outlined in the Department of Labor (DOL) prevailing wage determinations and/or Collective Bargaining Agreement (CBA) incorporated into the contract.
2. The applicable job classification under a DOL prevailing wage determination is Guard II. In the case of a CBA wage determination, the applicable job classification may be specified under a different title. In either case, the applicable job classification reflects the minimum wage rates and fringe benefits that the Contractor must pay to all employees working under the contract.
3. The attached Collective Bargaining Agreements (CBA) are herewith incorporated into the contract and only those provisions recognized as allowable wages or fringe benefits under the terms of the Service Contract Acts, as incorporated into the contract under FAR Clause 52.222-43, will be subject to adjustment when applicable. Incorporation of the CBA does not authorize price adjustment of all economic terms established in the CBA and is limited only to allowable wages and fringe benefits under the Service Contract Act.
B. Contingency Pricing
1. Contractors shall not include contingency allowances to cover increased costs for which adjustments are provided under Federal Acquisition Regulation (FAR) Clause 52.222-43 – Fair Labor Standards Act and Service Contract Act – Price Adjustments (Multiple Year and Option Contracts)(Sept. 2009).
2. In addition to increases to wages and fringe benefits prescribed by a revised wage determination, including fringe benefits specifically called out in a collective bargaining agreement, FPS may consider increases to other direct costs brought about by the contractor’s cost of compliance with the terms of a revised wage determination (e.g. state gross receipts tax). Any price adjustment request associated with such other direct cost(s) must be supported by documentation demonstrating that a contingency covering an increase to the subject cost(s) was not included in the contractor’s price proposal accepted by the Government at time of award.
3. For cost/price factors that are subject to variation, but are not subject to adjustment under the provisions above, contractors may factor in contingency allowances.
C. Definitions
1. Basic Services – Basic services are the permanent ongoing services specifically included in the task order(s) at time of award or added through modification up to any established maximums identified in the contract. For this requirement, Basic Services are designated as either productive or supervisory. The Government shall order these services using the Basic Services Rates specified in the Schedule of Supplies/Services and Prices.
2. Temporary Additional Services - During the term of the contract, the Government may have requirements for temporary additional services (TAS) beyond the basic services requirements. TAS are the short term, non-recurring needs for service such as an increase in hours to an existing or subsequently added post to include the weekend where a public demonstration is taking place over the weekend, addition of posts to provide for increased security for special events or high profile visitors to the building, extension of existing post hours in a building to cover seasonal fluctuations (such as at an IRS building during tax season), etc.
Should a continuing need for additional service arise, a contract modification will be issued by the government to provide for those services as permanent post locations.
Due to the nature of TAS the Contractor may be required to perform these services with little advance notice. If the Government provides the contractor with more than 72 hours notification to perform TAS, the Government shall issue an order using the basic services rates specified in the Schedule of Supplies/Services and Prices. If the Government provides the contractor with less than 72 hours notification to perform TAS, the Government shall issue an order using the TAS rates specified in the Schedule of Supplies/Services and Prices. If the period of performance for the TAS is expected to exceed 72 hours and the Government provides the contractor with less than 72 hours notification to perform these services, the first 72 hours of performance shall be ordered at the TAS rate specified in the Schedule of Supplies/Services and Prices.
Any hours performed after the initial 72 hour period shall be ordered at the Basic Services rate specified in the Schedule of Supplies/Services and Prices.
In the event anyone other than the Contracting Office or FPS COTR contacts the Contractor to request TAS under this contract, the Contractor shall not proceed with the request but shall notify the FPS COTR and Contracting Officer immediately. Contractors who perform services without proper authorization from the Contracting Officer or FPS COTR shall not be reimbursed for such services.
3. Continuity of Operations Plan (COOP) Implementation – The Contractor shall submit a COOP to the Government as a post-award deliverable. The COOP shall identify provisions made for the acquisition of necessary personnel, resources and supplies, if necessary, for continuation of PSO operations in the event of an emergency such as a pandemic (e.g. H1N1 flu virus) until normal operations can be resumed. It is noted that an event requiring implementation of the COOP may result in a reduction in requirements due to partial or full closure of Government facilities and/or realignment of requirements based on the importance of continued operations at certain Government facilities due to the mission of their tenants or security level. Actual hours worked by PSO standing posts during such an emergency will be invoiced under the Basic Services CLIN. All other direct costs (ODCs) associated with implementation of the COOP, including but not limited to: overtime, travel and per diem, PPE replenishment, changes to IT/communication systems or devices, and training and certification of additional personnel etc. shall be reimbursed under the Optional COOP Implementation CLIN contained in the Schedule of Supplies/Services and Prices. Since COOP implementation costs cannot be pre-determined at this time, the Government has provided estimates and established Not To Exceed Amounts in the Schedule of Supplies/Services and Prices.
Pursuant to the clause entitled, CONTINUITY OF CRITICAL
CONTRACTOR DELIVERABLES [SERVICES] IN THE EVENT OF AN
EMERGENCY (October 2009)(tailored), the Government may unilaterally exercise these CLINs in the event of an emergency event. The CLINs will be funded upon exercise and the contractor may invoice for costs associated with COOP Implementation up to the Not-to-Exceed Amount specified in Schedule of Supplies/Services and Prices. All reimbursable costs/ODCs must be authorized by the Contracting Officer. Written authorization must be gained prior to incurring costs under this CLIN.
Contractors shall provide a cost element breakdown and applicable indirect rates with their request. Reimbursable costs/ODCs must be in conformance with the contractor’s approved Continuity of Operations Plan (COOP). Invoices submitted for payment against this CLIN shall be rejected if CO authorization was not previously obtained. The contractor shall invoice 30 days in arrears on a monthly basis during the length of the event.
Other direct costs associated with COOP Implementation shall not exceed the maximum amounts specified in Schedule of Supply/Services and Prices without authorization from the contracting officer.
III. PACKING AND MARKING
01. PAYMENT OF POSTAGE AND FEES
All postage and fees related to submitting information, including forms, reports, etc., to the Contracting Officer or the Contracting Officer's Technical Representative shall be paid by the Contractor.
02. MARKING
All information submitted to the Contracting Officer or the Contracting Officer's
Technical Representative shall clearly indicate the contract and task order number for which the information is being submitted.
IV. INSPECTION AND ACCEPTANCE
01. CONTRACTOR'S RESPONSIBILITY
The Contractor shall provide for all day-to-day supervision, inspection and monitoring of all work performed to ensure compliance with the contract requirements. The results of inspections conducted shall be documented in an inspection report for submission to the Government. The Contractor shall follow through to assure that all Government and Contractor identified defects or omissions in the contract requirements are corrected.
V. DELIVERIES OR PERFORMANCE
01. TERM OF CONTRACT
The full term of the contract will be up to five (5) years, if all established optional ordering periods are exercised. The start and end dates for the base ordering period and each optional ordering period will be defined within the resultant contract. Applicable periods of performance will be established in resultant task orders. Established optional ordering periods may be exercised in accordance with FAR 52.217-9 “Option to Extend the Term of the Contract”.
02. OPTION TO EXTEND SERVICES BEYOND THE TERM OF THE CONTRACT
If it is determined by the Government that award of a successor contract cannot be made to start immediately after the end of the last optional ordering period, the Government shall have the unilateral option of extending the services of this contract for an additional six (6) months beyond the last optional ordering period in accordance with FAR 52.217-8. The price associated with the potential need to exercise the option under FAR 52.217-8 shall be evaluated. Using the Pricing Schedule, the Contractor shall submit unit prices and extended prices (i.e. Unit Price x Estimated Quantity) for the line items entitled, “6 Month Extension Period Pursuant to FAR 52.217-8” under Basic Services, TAS and. The Government will determine whether the price, inclusive of all options (including the options available under FAR 52.217-8), is fair and reasonable, and whether the price of the base period and all option periods (including the option(s) represented by FAR 52.217-8), in combination with the other evaluation factors specified in the solicitation, represents the best value to the Government.”
VI. CONTRACT ADMINISTRATION DATA
01. SUBMISSION OF INVOICES – Invoices shall be submitted for payment within 30 days after completion of the prior month’s services. Invoices shall be submitted via one of the following three methods:
A. By mail:
NPPD-FPS-Region 11
DHS, NPPD
Burlington Finance Center P.O. Box 1279 Williston, VT 05495-1279 Attn: FPS Region 11 Invoice
B. By facsimile (fax): (include a cover sheet with point of contact & # of pages)
802-288-7658
C. By e-mail:
NPPDInvoice.Consolidation@dhs.gov
Invoices submitted by other than these three methods will not be processed and will be returned. In addition to the information required for a proper invoice as identified in FAR 52.212-4 (g)(1), Contract Terms and Conditions – Commercial Items, (JUNE 2010), the contractor shall annotate “FPS Region 11” on the face of each invoice.
Contractors shall submit only one invoice per contract per month unless otherwise authorized by the Contracting Officer. Failure to comply with these submission requirements will result in rejection of the invoice.
02. PAYMENTS
A. Payment will be made on a calendar month basis in arrears upon submission of an invoice. Payment will be due on the 30th calendar day after receipt of a proper invoice or date of receipt of services, whichever is later.
B. It is the objective of the Government to obtain complete and satisfactory performance in accordance with the terms of specifications and requirements of mailto:Invoice.Consolidation@dhs.gov this contract. The criteria for deductions and adjustments below will be used by the Government in determining monetary deductions for nonperformance of work under this contract and for adjustments for deficiencies in the performance of work. In no event shall contractor invoice or the Government be obligated to pay for any hours in excess of the amount identified within the contract (inclusive of all modifications).
C. The Contractor is responsible for submitting accurate invoices that reflect the actual services provided each month. Where there are variances between the requirements cited in the task order(s) and the work actually performed (e.g., unmanned posts), the Contractor shall attach a separate sheet to the invoice detailing each instance of a variance. The Contractor shall compute the invoice price to reflect the actual amount of hours performed. Repeated substantiated errors in invoicing may adversely affect the performance assessments assigned during the pendency of the contract. Submission of false invoices shall be subject to contractual and legal actions.
D. To verify the monthly payment for productive man-hours, the Contracting Officer’s designated representative may compare the labor-hours required in the task order with the DHS Form 139, Record of Time of Arrival and Departure from Buildings, or other approved sign-in/sign-out form. The Government may perform a 100% comparison or sampled comparison to verify the accuracy of the Contractor’s invoice. The Government will only pay for services actually rendered by the Contractor and funded on the task order. If variances are noted between the invoice and the DHS Form 139, the Government will propose a price deduction. For example, if the task order required that a post be manned for 12 hours, and the Contractor billed for 12 hours, but the DHS Form 139 shows that post was manned for 10 hours, the 10 hours will prevail and the Government will deduct the difference.
Any inquiries regarding payment shall be directed to the COTR and/or CO.
03. ADJUSTING PAYMENTS FOR CONTRACTOR PERFORMANCE
A. Deductions for Failure to Provide Man-hours
1. To compute labor-hour deductions the Contracting Officer's Representative will compare the man-hours reported by the Contractor…
This is the start of the file's text. The full file is on GovTribe.