(x)

HSHQE3-16-Q-00002

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Philadelphia PA 19106 701 Market Street, Suite 3200

OPO/FPS/EAST CCG/R3

Office of Procurement Operations Federal Protective Service U.S. Dept. of Homeland Security NPPD/FPS/East CCG/Region 3

08/26/2016000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/10/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE PAGE 2 OF THIS AMENDMENT FOR DETAILS.

DO/DPAS Rating: NONE

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MICHELLE DUFFY

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

HSHQE3-16-Q-00002

AMENDMENT #1

The purpose of this amendment is to answer vendors’ questions and make changes to the solicitation.

Section A of this amendment answers vendors’ questions while section B amends the terms of the solicitation.

A. Questions & Answers

1. QUESTION: With the contract isolated as a Small-Business set-aside, is there a parameter within solicitation which dictates that work performed must be at least a 51% rate for the Small- Business associated?

ANSWER: Per page 54 of the solicitation, FAR clause 52.219-14 – “Limitations on Subcontracting” applies to this procurement.

2. QUESTION: Are there specific parameters in place because of historical status?

ANSWER: The Erie complex is considered a historic property and, therefore, rules for historic buildings apply. Before the contractor can commence work, GSA must be consulted to ensure that the installation process does not disturb the aesthetics.

3. QUESTION: Do we need to drill between the walls for any of the replacement cameras? It appeared that Camera #20 of new install was an existing mount, but not where indicated in

SOW.

ANSWER: The awardee will make the determination regarding drilling during installation.

Wiring is required for new cameras. Camera #20 is a “swap” and not a new install, so re-use of cabling is permitted.

4. QUESTION: Do we need to use conduit? For the new installations, conduit was said to be available for all new materials… is this accurate?

ANSWER: Conduit would be required in any situation in which exposed wiring exists. In addition, conduit may be required if the vendor goes through electrical closets, garages, between floors, or in common areas within the facility. Conduit is NOT supplied, nor are any other parts.

The vendor is required to provide all parts, materials, equipment, etc. necessary to fulfill the requirements of the Statement of Work (SOW).

5. QUESTON: Has all cable infrastructure been corroborated as fully-functioning working order?

Answer: All cable infrastructure has not been corroborated. However, it is the vendor’s responsibility to ensure the CCV system is functional at project completion.

6. QUESTION: Is re-use of coax cable mandatory or highly encouraged? With understanding that maintenance of existing infrastructure can provide cost-savings, is it still to be understood as preference or requirement?

ANSWER: It is the vendor’s option whether or not to reuse the existing coax cable or replace it.

However, it is the vendor’s responsibility to ensure the CCV system is functional at project completion.

HSHQE3-16-Q-00002

AMENDMENT #1

7. QUESTION: How many service calls did the existing CCTV System typically have during one year?

ANSWER: This information cannot be provided.

8. QUESTION: Avigilon is listed a suggested technology. Is there a pre-condition available which explains preference? If equivalent is proposed, are there specific benchmarks which must be met besides basic description of replacements found in SOW.

ANSWER: Per Section 12 of the SOW, “Any equivalent submissions by Contractor shall outline on a chart, showing existing Avigilon specifications and features vs. the proposed equivalent equipment. The NVR system, and all cameras, must contain the same features and specification as the Avigilon system, including object detection and other video analytics already built-in, and at no additional cost to the Government. No substitutions will be permitted if they do not contain built in analytics, at no additional cost.” In addition, FAR clause 52.211-6 – “Brand Name or Equal” is included on page 32 of the solicitation.” Quotations that do not comply with this provision of the SOW and/or clause may not be considered “technically acceptable.”

9. QUESTION: Will there be an allowance for future questioning if needed?

ANSWER: No additional questions will be entertained.

B. Solicitation Changes

1. Regarding Section 13 of the SOW, Camera #20 is not a new camera location as indicated in the SOW; it is a replacement camera. Furthermore, the outcome desired for Cameras #21 and #22 should be swapped around. In the SOW, it states that Camera #22 should be removed completely with no replacement, while Camera #21 should be replaced with a new camera.

Instead, Camera #21 shall be removed completely and Camera #22 shall be replaced with a new 4 head camera.

2. On page 1 of the solicitation, the following paragraph is added under the section entitled “Technical” under “D. Quotation Submission and Evaluation Criteria.”

“It is expected that the awardee shall provide the CCV system in accordance with the SOW. If a quoter wishes to deviate in any way from the SOW and propose its own alternate strategy, the quoter shall provide a supplement to its quote outlining its plan for fulfilling the Government’s requirement. The Government will review the supplement and if it is determined not to be “technically acceptable”, the vendor’s quote will NOT be considered for award.” This supplement shall not exceed one (1) page.”