Attachment_8_-_Field_Level_Supervision_Exhibit_(jlpedit).xls
XLS spreadsheet 46 KB Posted
- Solicitation number
- HSHQC7-14-R-00007
About this file
Attachment 8 - Field Level Supervision Exhibit
View the file
Other files
| File | Type | Posted |
|---|---|---|
| West_Texas_HSHQC7-14-R-00007_QAs.docx | DOCX document | |
| HSHQC7-14-R-00007_A0003_SF30.pdf | ||
| HSHQC7-14-R-00007_A0002_SF30.pdf | ||
| HSHQC7-14-R-00007_A0001_SF30.pdf | ||
| Pre-proposal_Conference_Sign-in_Sheet.pdf | ||
| Most_Frequently_Asked_Questions.docx | DOCX document | |
| Pre-Proposal_Conference_South_Tx _Dallas_and_West_Tx.ppt | PPT presentation | |
| West_Texas_Post_Exhibit_with_Screener_Post_Identified.xlsx | XLSX spreadsheet | |
| HSHQC7-14-R-00007_RFP_Package.pdf | ||
| Attachment_4_-_Past_Performance_Questionaire_-_Aug_2013_Version.doc | DOC document | |
| Attachment_11_-_Extent_of_Participation_by_SDBs_-_Aug_2013_Version.doc | DOC document | |
| Attachment_6_-_Price_Element_Breakdown__(NWDTP_Final_Version)_April_2014.xlsx | XLSX spreadsheet | |
| Attachment_7_-_Award_Approval_Request_-_Aug_2013_Version.doc | DOC document | |
| Attachment_3_-_Past_Project_Form_-_Aug__2013_Version.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supervision
| Field Level Supervision Exhibit | |||||
| (This Spreadsheet must be completed and returned with your proposal/quote.) | |||||
| 1. In the spaces below, provide the number of full-time equivilant field level supervisors that will be assigned to this effort: | |||||
| Area Supervisor: | |||||
| Site Supervisor: | |||||
| Roving Supervisor: | |||||
| Total # of Field Level Supervisors: | |||||
| 2. Complete the spreadsheet below to indicate the distrubition of supervisory hours by location. | |||||
| Locations (List each Separately) | Supervisor Post | Days Supervisor at This Location | Hours Per Day at This Location | Total Supervisor Hours at Each Location for a 12 Month Period | Remarks |
| Grand Total | |||||
| LEGEND: | |||||
| Note: For purposes of completing this spreadsheet, the Contract Manager, Training Instructor, Quality Assurance Personnel and "Lead" PSOs are NOT considered field level supervisors: | |||||
| Location: Locations are areas of operations/responsibilities that will be established to meet the field level supervision required by the Statement of Work. e.g. Building, Complex, Section of a City/Town, Geographic part of State | |||||
| Supervisory Post: For each location, provide the number and type of supervisors that shall be provided. Use the following abbreviations: AS = Area Supervisor, SS = Site Supervisor (indicate the sites supervised), RS = Roving Supervisor (indicate the locations supervisied). | |||||
| Days Supervisor at this Location: Use the following nomenclature(s): | |||||
| "7 Days" - 7 days a week including Federal holidays | |||||
| "M-F" - Monday through Friday excluding Federal Holidays | |||||
| "SSH" - Saturdays, Sundays and Federal holidays | |||||
| Total Supervisor Hours for a 12 Month Period: For each location provide the Supervisory hours that will be provided for a 12 month period. | |||||
| Grand Total: Provide the summed total for Supervisory Hours provided for a 12 month period. |
&C&"Arial,Bold"&14 Attachment 8 Page &P of &N
File details come from the government source that posted it. Updated .