OK_HSHQC7-14-R-00006_QAs.docx
DOCX document 62 KB Posted
- Solicitation number
- HSHQC7-14-R-00006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HSHQC7-14-R-00006_A0003_SF30.pdf | ||
| Oklahoma_Post_Exhibit_with_Screener_Post_Identified.xlsx | XLSX spreadsheet | |
| HSHQC7-14-R-00006_A0002_SF30.pdf | ||
| HSHQC7-14-R-00006_A0001_SF30.pdf | ||
| OK_Pre-proposal_Conferenc_Sign-in_Sheet.pdf | ||
| 6.11.14_Pre-Proposal_Conference_OK.ppt | PPT presentation | |
| Oklahoma_Post_Exhibit_with_Screener_Post_Identified.xlsx | XLSX spreadsheet | |
| Attachment_6_-_Price_Element_Breakdown__(NWDTP_Final_Version).April_2014.xlsx | XLSX spreadsheet | |
| HSHQC7-14-R-00006_RFP_Package.pdf | ||
| Attachment_3_-_Past_Project_Form_-_Aug__2013_Version.doc | DOC document | |
| Attachment_8_-_Field_Level_Supervision_Exhibit.xls | XLS spreadsheet | |
| Attachment_11_-_Extent_of_Participation_by_SDBs_-_Aug_2013_Version.doc | DOC document | |
| Attachment_4_-_Past_Performance_Questionaire_-_Aug_2013_Version.doc | DOC document | |
| Attachment_7_-_Award_Approval_Request_-_Aug_2013_Version.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oklahoma Questions and Answers
HSHQC7-14-R-00006
| Questions |
| Answers |
| 1 |
| Does the government have a desired or ideal level of supervision for this OK statewide contract? Number and placement of supervisors or number of productive supervisory hours as a ratio compared to productive PSO hours? |
The government does not dictate to the contractor the level of supervision or numbers of management personnel required to administer the contract. That determination will be made by each vendor.
| 2 |
| During the proposal evaluation process, is there a comparison made between an offeror’s proposed supervisory plan and the amount that offeror has factored into its pricing to accomplish that plan? Specifically, does an offeror’s proposed level of supervision by location have to be supported in its pricing of mileage and travel for the supervisors to accomplish the plan? |
In accordance with the solicitation instructions, to ensure the submission of an adequate price element breakdown for purposes of this RFP, the Government suggests that the Contractor complete the attached worksheet, “Price Element Breakdown” (Attachment 6). The worksheet serves as a proforma for the expected format of the price element breakdown. The Government may use this breakdown to conduct a price realism evaluation for the purpose of measuring the Contractor’s understanding of the solicitation requirements and for assessing the performance risk inherent in the Contractor’s price.
| 3 |
| Is it acceptable for graphics, tables and charts to have fonts smaller than 11pt as long as they are legible? |
IAW the Proposal Submission Requirements #4 on page 375 of 404, Page Limitation - Excluding the cover page, headers and footers (headers and footers shall be in at least 10pt. font) and past performance forms and questionnaires, the technical proposal (covering all non-price factors) is limited to twenty (20) pages in at least 11pt. font and 1” margins. Pages in excess of this limitation will not be evaluated.
| 4 |
| Will PSOs be required to carry on duty the same weapon they use for qualification (same serial number)? |
No. PSOs are not required to carry a specific weapon by serial number. However PSOs are required to carry the exact same make and model weapon in which they have qualified with.
| 5 |
| In the “Minimum Submission Requirements Transition” section of the RFP, under the note, it states that “…in no event shall any proposed plan for transition training be dependent upon availability of Government personnel after normal business hours (e.g. overseeing training during evenings and weekends). Does this note apply to the availability of FPS personnel to meet the new WDTP 16 hour training requirement? |
No. At this current juncture and do to the inability to close post location with screening stations during normal business hours, the majority of all WDTP training will be accomplished after hours and on weekends. In accordance with Section 6.7.3.4.1 of the SOW, the awarded contractor will have up to 90 days after the performance start date to have all PSOs who will operate screening posts WDTP trained and certified.
| 6 |
| Have the locations for issue of the PIV cards already been identified? These locations are necessary in order to properly cost the issuing of PIV cards across the contract. |
Yes. See Exhibit 9E – Government Provided Property HSPD-12 PIV Card Employee Application Process, C. Enrollment, 5 on page 208 of 404.
| 7 |
| Is it preferred by and/or acceptable to the government to exclude relevant past performance information from the body of the technical proposal, only using documents that don’t count against page count to discuss past performance, i.e., Past Project Form RFP Attachment 3? |
Refer to Question 3 above.
| 8 |
| Should the Socio Economic Factor be discussed at all in the body of the technical or should this factor only be addressed in RFP Attachment 10 “Extent of Participation by Small Disadvantaged business Concerns? |
The Socio Economic Factor should be addressed in the RFP Attachment 11.
| 9 |
| Would the government prefer to receive the printed proposals spiral bound with plastic combs or clipped with binder clips or in some other fashion? |
The government has no preference.
| 10 |
| The transition requirement is for no more than 120 days and no less than 90 days. Does the government have a preference for the length of transition the contractor proposes based on this allowed window? In other words, does the government consider a proposed 120 day transition to present more risk to the government than a proposed 90 day transition? |
No, the Government does not have a preference. It is up to each offeror to determine the appropriate length of transition needed to successfully meet the requirement.
| 11 |
| Have incumbent PSOs and supervisors completed WDTP where applicable as required under this solicitation? |
Reference:
6.4 Training Requirements by Position
6.7.3 Weapons Detection Training Program (WDTP)
No. The 16 and 8 hour WDTP-X-Ray and NONX-Ray training are a new requirement.
| 12 |
| Will the Government review and clarify if there is a requirement for metal security breast badge(s) (shield)? Currently, there is no listing or required quantity for a metal security breast badge on Exhibit 8A Contractor-Provided Uniform Items. |
Reference:
Exhibit 8A Contractor-Provided Uniform Items
Exhibit 8A clearly indicates that the Contractor shall furnish uniform clothing items, as indicated to PSOs performing on Contract. Badges, patches, and other approved devices worn on uniforms shall carry distinctive company markings and in compliance with applicable state and local laws. The Contractor is responsible for knowing all applicable state regulations to administer this contract.
| 13 |
| Does incumbent guard force possess valid PIV cards as required under this solicitation? |
Reference:
13.5 HSPD-12 Personal Identity Verification (PIV) Cards
No, incumbent PSOs do not have PIV cards.
| 14 |
| Does the Government have a preference on the type of vehicle provided? |
No vehicle is required. See Amendment 0003
| 15 |
| Can the Government please provide estimated use for the contractor-provided vehicle? |
Reference:
Exhibit 8F Contractor-Provided Vehicles
Refer to Question 14 above.
| 16 |
| Uniform allowance is specifically included in two of the CBAs. Is FPS not reimbursing for this cost element? |
Only those provisions recognized as allowable wages or fringe benefits under the terms of the Service Contract Acts, as incorporated into the contract under FAR Clause 52.222-43, will be subject to adjustment when applicable. Uniform allowance is not considered a bona fide fringe benefit under the terms of the Service Contract Act.
| 17 |
| Will physical examinations performed by the predecessor contractor be recognized in order to meet the requirement for a physical examination every three years? |
Reference:
5.2.2 Medical Standards
No. This contract has a new medical standard that must be met by all PSOs.
| 18 |
| RFP Reference: Proposal Submission Requirements, paragraph 4. Page Limitation, page 375 of 404. |
Question: Is the Table of Contents included in the 20-page limitation for the Technical Proposal?
Refer to Question 3 above.
| 19 |
| RFP Reference: Exhibit 4 Required Training. |
Question: Are the training requirements stated in the RFP the training requirements for the current/existing contract or is there a change in the training requirements for the new contract which will require additional training for incumbent personnel?
Question: If this is not a change in the training requirements, can the government provide a roster with the incumbent staff’s training status/expiration?
Incumbent contractor personnel meet all requirements under the current contract. The RFP requirements differ from the current contract requirements. All PSOs are required to complete all of the required training that is set forth in this RFP, which may vary from the type and quantity of training required under the expiring contract.
The incumbent contractor will provide the incumbent personnel records to the awardee.
| 20 |
| RFP Reference: Statement of Work, Section 11.2 Contract Manager, page 92 of 404. |
Question: Is the Contract Manager required to be onsite, and/or in-state, Monday through Friday during normal working hours?
No; however, IAW 11.2.5 of the SOW “CM shall be available during normal working hours (8:00 a.m. to 4:30 p.m.) within 30 minutes by telephone or in person to discuss deficiencies. After normal duty hours or on weekends and holidays, CM shall be available within two hours.”
| 21 |
| RFP Reference: Statement of Work, Section 11.2 Contract Manager, page 92 of 404. |
Question: Does the Government require offerors to provide a full-time, 100% dedicated Contract Manager to manage this contract?
Yes, IAW 11.2.1 of the SOW “Contract Manager (CM) position is a dedicated fulltime position and requires a minimum of five years of specialized experience…”
| 22 |
| RFP Reference: Statement of Work, Section 11.2 Contract Manager, page 92 of 404. |
Question: Is it permissible for the Contract Manager to simultaneously manage/oversee other similar Government and/or commercial contracts while serving as the Contract Manager on the State of Oklahoma contract, or is the Contract Manager a dedicated, full-time, position exclusively managing this contract?
Refer to Question 21 above.
| 23 |
| RFP Reference: Statement of Work, Section 11.2 Contract Manager, page 92 of 404. |
Question: Please provide the building/location where the Contract Manager currently resides.
The current Contract Manager resides in their company provided office space.
| 24 |
| RFP Reference: Statement of Work, Section 11. Key Personnel, page 92 of 404. |
Question: Will the Government provide office space for Key Personnel?
No, the successful offeror is required to provide any necessary office space and furnishings as well as any equipment.
| 25 |
| RFP Reference: Statement of Work, Section 11. Key Personnel, page 92 of 404. |
Question: If office space is provided by the Government for Key Personnel, will the Government provide internet connectivity for the Contract Manager?
Refer to Question 24 above.
| 26 |
| RFP Reference: Statement of Work, Section 7.3.1.1, page 81 of 404, states the following, “Contractor shall maintain personnel files for employees who work under this contract. These files shall reside in Contractor Manager’s office and be made available to Government immediately upon request. |
Question: Are these types of records required to be stored onsite or can they be maintained electronically?
IAW 7.3.1.2 of the SOW, Contractor must maintain legible, paper or computerized system (electronic/scanned) files containing training, certification, licensing, and permit information required in SOW.
IAW 7.3.1.1 of the SOW, Contractor shall maintain personnel files for employees who work under this contract. These files shall reside in Contractor Manager’s office and be made available to Government immediately upon request.
| 27 |
| RFP Reference: Exhibit 8C Contractor-Provided firearms and Ammunition, page 197 of 404 indicates that the Contractor must provide .40 Caliber S/W firearms and ammunition. |
Question 1: Is the required .40 caliber S/W used on the current contract, or is a change in weapons platform part of the new contract?
Question 2: If the required .40 caliber S/W is the same weapon as the incumbent contract and the offeror chooses to use the same weapon, is only Transitional Weapons Training required?
Question 3: If this is not a change in the platform, can the government provide a roster with the incumbent staff training status/expiration?
Question 4: Does the government provide storage space for weapons on site?
Question 5: If weapons storage is provided, would the government provide the buildings where weapon storage is available?
The current weapon is an S/W .40 caliber. The request for the use of 40 caliber weapons is not a platform change. Please note that Exhibit 8C only specifies that the Contractor issues 40 caliber weapons. It does not distinguish between S/W and Glock etc...
Yes, transitional weapons training is required even if the same weapon is utilized.
Yes. Upon award of the contract a roster or spreadsheet will be provided.
No weapons will be stored on site.
No weapons will be stored on site.
| 28 |
| RFP Reference: Exhibit 8F Contractor-Provided Vehicles, paragraph 3. Vehicle Requirements, page 202 of 404. |
Question 1: Will the Government provide free parking for the required vehicle?
Question 2: Can the Government provide average daily use in miles for the vehicle?
Question 3: Does the Government have a preference as far as model and year of vehicle?
Question 4: Where (city/building) will the vehicle be located?
Refer to Question 14 above. See Amendment 0003
See above.
| 29 |
| RFP Reference: Price Proposal, paragraph 4, page 382 of 404, states the following: “The minimum wage rates and fringe benefits applicable to this contract are outlined in the attached Department of Labor (DOL) prevailing wage determination(s) and/or the predecessor contractor’s Collective Bargaining Agreement(s) (CBA). For purposes of proposal preparation, where a predecessor contractor’s CBA applies, the minimum wages and fringe benefits of the predecessor contractor’s CBA corresponding to the initial period of performance of this contract shall be regarded as applicable to all additional period of performance under this contract. A list of all service employees including anniversary dates currently on the incumbent Contractor’s (or subcontractor’s) payroll is provided as Attachment #10.” |
Question: Please clarify whether any or all of the following constitute Fringe benefits and whether offerors must honor these Fringe benefits during the first period of performance and any additional terms of the contract: uniform allowance, paid time off, Health & Welfare, paid vacation, paid sick leave, annual benefit, pension, and paid holidays.
Of the items you listed, paid time off, health & welfare, paid vacation, paid sick leave, pension and paid holidays are included among fringe benefits. Uniform allowance is not a fringe benefit. It cannot be determined what is meant by ‘annual benefit’.
| 30 |
| RFP: Proposal Submission Requirements, paragraph 3, page 375 of 404. |
Question: Please provide guidance as to whether offerors should use binder clips in the place of three-ring binders for the submission of both the Technical and Price proposals.
Refer to Question 9 above.
| 31 |
| RFP Reference: Statement of Work, Sections 5.2.2 Medical Standards, page 63 of 404; 5.2.3, Physical Demands, page 65 of 404; and 5.3.2 Suitability Determination, page 68 of 404. |
Question: Do incumbent personnel on the current/existing contract meet the Medical Standards, Physical Demands, and Clearance requirements stated in the RFP or are these new requirements?
Incumbent contractor personnel meet all requirements under the current contract. The medical/physica1/clearance requirements of this RFP differ from those contained in the current/expiring contract.
| 32 |
| RFP Reference: General |
Question 1: Is Guard Mount required for this contract?
Question 2: If guard mount is required, will the government provide space for guard mount?
Guard mount is not required on this contract
| 33 |
| REF: Exhibit 9E Government Provided Property PIV Card Employee Application Process |
Question 1: Do incumbent personnel have PIV cards or is this a new requirement for this contract?
Question 2: If this is not a new requirement, can the government provide a roster with the incumbent PIV status?
Refer to Question 13 above.
| 34 |
| REF: Collective Bargaining Agreement between DECO, Inc. and PSOI local 101, Article 23 – Parking, page 258 of 404. According to the CBA covering PSOs in Oklahoma City, the offeror is required to make parking stalls in downtown Oklahoma City available to employees where paid parking is required. |
Question 1: Will the Government provide free or discounted parking for employees in Oklahoma City?
Question 2: If free parking is not available, will the Government please identify which buildings require paid parking?
No.
It is up to each vendor to determine which buildings require paid parking.
| 35 |
| REF: Exhibit 9E Government Provided Property PIV Card Employee Application Process |
Question: Can the Government confirm that OKC-Oklahoma City, Will Rogers World Airport located at 5700 SW 36th Street, Suite A, Oklahoma City, OK is the only location statewide where staff can enroll for PIV cards?
Yes, Will Rogers World Airport located at 5700 SW 36th Street, Suite A, Oklahoma City, OK is currently the only location where staff can enroll for PIV cards.
| 36 |
| REF: Exhibit 4 , Government Administered Written Examination |
Question: Can the government provide location(s) where written examinations will take place?
No, but exams have historically taken place in Oklahoma City and Tulsa.
| 37 |
| REF: Exhibit 4: Government provided Training WDTP-X-Ray-Initial and WDTP-NONX-Ray-Initial: |
Question 1: Are the WDTP-X-Ray and WDTP-NONX-Ray training new requirements?
Question 2: If this is new requirement, will staff be allowed to stand post until training is completed?
Refer to Question 11 above.
Yes. In addition to the transition period, IAW section 6.7.3.4.1 of the SOW the awarded contractor will have up to 90 days after the performance start date to have all PSOs who will operate screening post WDTP trained and certified.
| 38 |
| RFP Reference Collective Bargaining Agreement, Department of Labor Wage Determinations, CBA-2014-6443 between DECO Inc. and Local 101, page 225 of 404. Wages and other economic benefits for this CBA are expiring January 31, 2015 (see section 3, page 248 of 404). |
Question: Considering negotiations will occur after the closing date of this RFP, before the pricing expiration date of 180 days, and before the Base Year/Period of Performance of this contract begins, will the Government allow an equitable adjustment for wages and bona fide fringe benefits associated with this CBA so the contractor can recoup all costs for such increases in the base year?
The applicable wage determination has been incorporated into the solicitation. The need for any changes to the wage determination/ CBA and resulting price adjustments will be determined in accordance with the Service Contract Act and its implementing regulations and case law.
| 39 |
| RFP Reference Collective Bargaining Agreement, Department of Labor Wage Determinations, CBA-2014-6444 between DECO Inc. and Local 201, page 307 of 404. Wages for this CBA are changing starting July 1, 2015 (see Article 9, section 1 and section 2, page 327/328 of 404). |
Question 1: Should the offeror use the blended wage rate for pricing the base year?
Question 2: Or should the offeror use the wage rate in effect on February 1, 2015?
A weighted average should be used to capture the prospective increase and the weighted average for the base year should be used for all option years.
See answer above.
| 40 |
| REF: General Question: Will the Government confirm that offerors are exempt from Oklahoma sales and use taxes? |
No. IAW FAR Clause 52.212-4 (k), Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
| 41 |
| RFP Reference: Statement of Work, Section 4.4 Licensing Fees, page 61 of 404. This section states the following: “the Contractor must pay all costs and fees associated with applying for, receiving and maintaining permits and licenses throughout the contract, including payment of all costs and fees for contractor employees who are required by federal, state or local regulating agencies to individually apply for licenses/permits.” |
Question: Would the Government please provide a list that shows the status of the incumbent personnel’s licenses/permits?
All incumbent personnel meet the license/permit requirements contained in the current contract. The incumbent vendor will provide the personnel records to the successful awardee.
| 42 |
| RFP Reference: Exhibit 1 – Post Exhibit, page 108 of 404. |
Question: Would the Government please identify the Level III and Level IV Facilities listed on the Post Exhibit?
This information will be provided to the awardee.
| 43 |
| RFP Reference: Standard Form 1449 Block 15 – The Form does not provide a proposal delivery address. |
Question: Would the Government please confirm that the address below is the correct proposal delivery address, per the SOLICITATION PROVISIONS, page 373 of 404?
Submissions shall be made via hard copy to:
Department of Homeland Security Office of Procurement Operations Attention: Jennifer Goss 32125 32nd Ave S Federal Way, WA 98001
See Amendment 0001 issued on 06/27/14, which amended the due date and the delivery address to the following:
Department of Homeland Security Office of Procurement Operations Attention: Jennifer Goss – 1st Floor 32125 32nd Ave S Federal Way, WA 98001
| 44 |
| REF: Exhibit 8E, Contractor Provided Communication Equipment, page 201 of 404. |
Question: Would the Government please clarify which posts will be utilizing the 45 contractor-provided cell phones?
Distribution of cell phones will be dictated by the lack of government provided radio coverage. This information will be provided to the awardee.
| 45 |
| RFP Reference: Proposal Submission Requirements, page 375 of 404, states, “Proposals shall be comprised of THREE (3) separate sealed envelopes. The first envelope . . . The third envelope shall contain a disc containing a saved electronic copy of the offerors Management Approach (in Microsoft Word or equivalent format) and the offerors Pricing Schedule and Price Element Breakdown (in Microsoft Excel or equivalent format). All of these envelopes should then be sealed in a fourth envelope that clearly identifies the RFP for which it is being submitted.” |
Question 1: Should the Management Approach section to be submitted on the disk be redacted?
Question 2: Should the Pricing Schedule and Price Element Breakdown be redacted?
Question 3: Should the CD label be redacted?
1. The electronic copy should be in the original format without redactions.
2. The Pricing Schedule and Price Element Breakdown should not be redacted.
3. The CD label should not be redacted.
| 46 |
| Page 197-199 of 404, Exhibit 8C describes the contactor-provided firearms and ammunition requirements. In the Pre-Bid meeting we were told that if we purchased weapons from the incumbent contractor that there would be no required transitional training, but that if we purchase new weapons, 3 hours of transitional weapons training will be required. |
Question A: Please clarify whether 3 hours of transitional training is still required for incumbent personnel even if the contractor purchases new weapons that are the same make/model as the weapons the current incumbent provides.
Refer to Question 27 above.
| 47 |
| Page 202 of 404, Exhibit 8F – Exhibit 8F (Contractor-Provided Vehicles) requires one (1) vehicle for mobile patrol. |
Question A: Does the Government have a preference in the type of vehicle (Sedan/Truck/Segway/Bicycle, etc.) the contractor should provide?
Question B: Please provide the ‘Est. use miles/hours per day’ for the required vehicle for pricing purposes.
Question C: Will the Government provide free parking for the required vehicle and other contractor vehicles?
Refer to Question 14 above.
| 48 |
| Page 201 of 404, Exhibit 8E – Exhibit 8E (Contractor-Provided Communication Equipment) requires (45) standard radio cases, but no radios, batteries, or chargers are requested. Exhibit 9D (Government-Provided Communication Equipment) states that the Government will provide radios, chargers, and batteries “As required by post.” In the Pre-Bid meeting we were told that cell phones were required on all post. |
Question A: The Post Exhibit identifies 57 unique line items, and 66 unique posts (to account for individual line items/locations covered by multiple PSOs. Please confirm that the number of radio cases required (45) is sufficient to fulfill the requirements under this contract?
Question B: Please provide the make/model of the radios the Government will be providing in order to accurately price the radio cases.
The carrying cases referenced in this question are for cell phones and not radios. No radios are identified on this exhibit. Exhibit 8E requires 45 cell phones, chargers, holders, and carrying cases.
The government will provide the government issued radios and cases. The contractor will not be responsible for radio cases. The carrying cases referenced in this question are for cell phones and not radios.
| 49 |
| Page 142-143 of 404, Exhibit 4C – Less-Than-Lethal-Weapons Training requires 4 hours of baton and 4 hours of OC Spray. |
Question A: Are all incumbent personnel currently trained for the use of the baton and OC Spray?
Question B: If yes, will they require retraining under the new contract during transition?
Incumbent personnel are trained for the use of the baton only.
All PSOs will have to be certified in OC training and recertify in the use of the baton.
| 50 |
| Page 155-156 of 404, Exhibit 4F – Exhibit 4F provides, “Contractor must coordinate with COR to schedule Government provided basic training to all students who have not had basic training.” |
Question A: Please provide the locations/addresses for the Government-provided Orientation for pricing purposes.
Refer to Question 36 above.
| 51 |
| Page 207-209 of 404, Exhibit 9E – Government-Provided Property HSPD-12 Personal Identity Verification (PIV) Card Employee Application Process. |
Question A: Please confirm if a Government mobile unit will be available for PIV processing?
Question B: If the answer to Question A is “Yes,” please provide the addresses that the mobile unit cover.
It is unknown at this time if a mobile unit will be available for PIV processing.
| 52 |
| Page 157-160 of 404, Exhibit 4G&H – WDTP X-Ray Screening requires 16 hours and WDTP Non X-Ray Screening requires 8 hours. |
Question A: Are all incumbent personnel currently trained in WDTP?
Question B: If yes, will they require retraining under the new contract?
| 53 |
| Page 177-193 of 404, Exhibit 7 – Provides Medical Questionnaire for Medical Standards and Physical Abilities Test Manuel for Physical Demands requirement. |
Question A: Do all incumbent personnel meet the Physical Demand and Medical standards requirement under this solicitation?
Question B: If yes, will they require re-testing under the new contract during transition?
Refer to Question 31 above.
| 54 |
| Page 328 of 404, CBA-Local 201 – CBA list Armed Security Guard hourly base rates of $19.37 for 7/1/14 and $19.95 for 7/1/15. |
Question A: Please confirm that the contractor should do a weighted average hourly base rate for the base year (2/1/15 to 1/31/16).
Refer to Question 39 above.
| 55 |
| Page 375, section entitled “Proposal Submission Requirements”, subsection 3 provides in relevant part, “Proposals shall be comprised of THREE (3) separate sealed envelopes. The first envelope shall contain five (5) copies of the technical (non-price) submission. Please note that three (3) of the five (5) copies of the technical submission (specifically the Management Approach) shall be redacted to remove any reference to the company name, logo, key personnel, etc. This includes pages, covers, headers, footers, pictures, etc. of the technical submission. Past Performance shall be provided under a separate cover and should not be redacted. The second envelope shall contain the original and one copy of the pricing submission and all other documents required by the solicitation (e.g. SF 1449, Pricing Schedule, Price Element Breakdown, Disclosures, Representation & Certifications, Subcontracting Plan (if applicable), etc.). The third envelope shall contain a disc containing a saved electronic copy of the offerors Management Approach (in Microsoft Word or equivalent format) and the offerors Pricing Schedule and Price Element Breakdown (in Microsoft Excel or equivalent format). All of these envelopes should then be sealed in a fourth envelope that clearly identifies the RFP for which it is being submitted.” |
Question A: Please confirm that the Management Approach within the disc is not to be redacted.
Question B: Please clarify if bidders should present each of the following parts of the technical submission separately: (1) two copies of Management Approach not redacted with the Field Level Supervision Exhibit, (2) three copies of the Management Approach redacted with the Field Level Supervision Exhibit (3) and lastly five copies of Past Performances under separate cover, or if bidders should present five copies of the Relevant Past Performance Section together, five copies of the Management Approach (two not redacted, three redacted) together, and five copies of the Field Level Supervision Exhibit together.
Refer to Question 45 above.
(1) two copies of Management Approach not redacted with the Field Level Supervision Exhibit, (2) three copies of the Management Approach redacted with the Field Level Supervision Exhibit (3) and lastly five copies of Past Performances under separate cover
| 56 |
| REFERENCE: Exhibit 4C, Contractor-Provided Initial and Transitional-Platform Firearms and Less-Than-Lethal Weapons Training and Qualifications |
CONTEXT: Exhibit 4C reflects that PSOs are to be trained on the use of both OC Spray and the Baton.
QUESTION: Do all PSOs under the current contract carry both OC Spray and the Baton and if not, will they require training for one or both as part of the new contract?
Refer to Question 49 above.
| 57 |
| REFERENCE: Exhibit 4G, Government-Provided Training Weapons Detection Training Program (WDTP) X-Ray Screening - Initial |
CONTEXT: Exhibit 4G identifies all training required for PSOs who operate X-ray machines on this contract.
QUESTION: Are all PSOs under the current contract who operate X-ray machines trained to these standards?
| 58 |
| REFERENCE: Exhibit 4H, Government-Provided Training Weapons Detection Training Program (WDTP) Non X-Ray Screening - Initial |
CONTEXT: Exhibit 4H identifies all training required for PSOs who perform screening functions but do not operate X-ray machines on this contract.
QUESTION: Are all PSOs under the current contract who work on posts classified as “Non X-Ray” screening posts trained to these standards?
| 59 |
| REFERENCE: Exhibit 7, Medical Questionnaire and Physical Abilities Test Manual |
CONTEXT: Exhibit 7 identifies the medical and physical test requirements under this contract.
QUESTION: Are all PSOs under the current contract medically and physically cleared to these standards?
Refer to Question 31 above.
| 60 |
| REFERENCE: Exhibit 8C, Contractor-Provided Firearms and Ammunition |
CONTEXT: Exhibit 8C requires that the .40 Caliber firearm be implemented on the contract.
QUESTION: What is the current make and model of the firearm(s) currently being used by the incumbent PSOs?
.40 Caliber S/W.
| 61 |
| REFERENCE: Exhibit 8F, Contractor-Provided Vehicles |
CONTEXT: Exhibit 8F identifies one (1) contractor-provided vehicle as required under this contract.
QUESTION: What is the vehicle’s assigned location and where else is the vehicle being operated?
Refer to Question 14 above.
| 62 |
| REFERENCE: Attachment 6, Price Element Breakdown |
CONTEXT: The Price Element Breakdown identifies a position classification of Regional Manager.
QUESTION A: Are Regional Managers required under the new contract?
QUESTION B: Are Regional Managers currently used under the existing contract and, if so, how many weekly hours are attributed to the Regional Managers?
No. Regional Managers are not required.
It is unknown if Regional Managers are used under the existing contract, as it is not a requirement.
| 63 |
| REFERENCE: Exhibit 8C, Contractor-Provided Firearms and Ammunition |
QUESTION: Is there a 3 hour training requirement for weapon familiarization when the exact make, model and caliber weapon will be used on the contract?
Refer to Question 27 above.
| 64 |
| REFERENCE: Exhibit 8C, Contractor-Provided Firearms and Ammunition |
QUESTION: If the 3 hour training requirement for weapon familiarization is required for all weapons other than the actual incumbent owned weapons currently in use, can the assumption be made that the incumbent provider will sell the current weapons to the winning security provider to level the training assumption playing field?
No. The government has nothing to do with if an incumbent contractor will sell their weapons. That negotiation would take place between the incumbent and the awardee. The transitional weapons training will still be required.
| 65 |
| I'm not sure this is the proper way to ask this question but on the uniforms are you wanting solid gray or with black pocket flaps and epaulets. |
Black pocket flaps and epaulets.
| 66 |
| In reference to the Supervisors position and Job Description that aligns with our management approach. We try to follow the Federal government’s guidelines of one supervisor for every 3-7 employees. Is it allowed and or provided in this RFP to bill or invoice for all supervisors as long as they have functions to complete on daily basis. |
The Contractor’s price shall be inclusive of all the Contractor’s direct costs, indirect costs and profit and shall include all costs associated with providing the services described in the Statement of Work, the Post Exhibits and the Contractor’s technical proposal. Supervision is not billed or invoiced separately.
| 67 |
| On the relief form I need clarification on the Non-Paid Break/Lunch Time in Hrs. Is this the total time for other personnel that provide breaks that not specifically relief officers? |
This is the relief hours for unpaid meal beaks, such as a 30 minute unpaid lunch.
| 68 |
| Might you know the incumbent contractor, contract value, and/or contract # for this opportunity |
Deco is the incumbent contractor for HSCEC7-10-A-00002. With regards to the contract value, the requested information is not relevant for the purpose of the current solicitation. Accordingly, the information will not be released by the government
| 69 |
| Is there an incumbent contractor associated with this work? If so, are you able to provide the name of the contractor and the contract #? Or, is this considered a brand new requirement? |
Yes. Refer to Question 68 above.
| 70 |
| Can you confirm that DECO is the incumbent contractor for these services under contract # HSCEC7-10-A-00002? |
Yes. Refer to Question 68 above.
| 71 |
| RFP Ref: SOW Section 16, Deliverables # 14, 16, 17 |
Question: Quarterly reports are listed as being due “By the 10th day of January, April, July, January”. Should the last month be October?
Yes. See Amendment 0003.
| 72 |
| Reference Post Exhibit, Post ID 7 G 332, Building # OK0101: The relief column for the 24/7 post indicates a relief requirement of “R=N S=Y”. Please inform what this means. |
R is Rover and S is Static guard and both will require a relief officer for meals and breaks. See Amendment 0003 for revised exhibit.
| 73 |
| Reference Proposal Submission Requirements section: “The third envelope shall contain a disc containing a saved electronic copy of the offerors Management Approach (in Microsoft Word or equivalent format) and …”. Should the electronic copy of the Management Approach be in the redacted format or in the original format without redactions? |
Refer to Question 45 above.
| 74 |
| Are the medical and PAT requirements in the current contract different from the requirements in the solicited effort? |
Yes. Refer to Question 31 above.
| 75 |
| Is the type of weapon currently in use different from the solicited effort that requires caliber .40 firearm? |
No. Refer to Question 60 above.
| 76 |
| Please provide the make and model of the firearm that is currently assigned to the incumbent personnel? |
Refer to Question 60 above.
| 77 |
| Is the training for OC and Baton under the solicited effort different from the requirement of the current contract? |
Yes. Refer to Question 49 above.
| 78 |
| Reference SOW section 13.5, HSPD-12, PIV Cards: Please confirm that all incumbent PSOs have PIV cards in accordance with the solicited requirement. |
Refer to Question 13 above.
File details come from the government source that posted it. Updated .