| Amendment 8 complete with attachments.pdf | ||
| Amd 000007.pdf | ||
| amendment 6.pdf | ||
| Amendment 5.pdf | ||
| 1D-IRS Post Exhibit for solicitation - 3-3-11.xls | XLS spreadsheet | |
| 1B-SWA Post Exhibit for solicitation - 3-3-11.xls | XLS spreadsheet | |
| 1E-SSA Post Exhibit for solicitation - 3-3-11.xls | XLS spreadsheet | |
| training and cert data.pdf | ||
| Proposal Submission Requirements -revised lang.doc | DOC document | |
| MVM_FPS HL Tenure List by CBA_WD 030211 | — | |
| 1C-FBI Post Exhibit for solicitation - 1-10-11.xls | XLS spreadsheet | |
| SOW Exhibits R6 -RFP Amd 4.pdf | ||
| 1A-Direct Post Exhibit for Solicitation - 3-3-11.xls | XLS spreadsheet | |
| amd 4.pdf | ||
| SOW revisions.doc | DOC document | |
| Amendment 000003.pdf | ||
| amendment 2.pdf | ||
| Seniority List by CBA_WD 093010.xls | XLS spreadsheet | |
| HSHQC6-11-R-00001 Amendment 1.pdf | ||
| HSHQC6-11-R-00001.zip | ZIP file | |
| RFP HSHQC6-11-R-00001 - FPS Region 6.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for HSHQC6-11-R-00001 Page 1 of 89 Amendment 000004
Questions and Answers for HSHQC6-11-R-00001 Page 2 of 89 Amendment 000004
| Question # |
| Reference |
| Question |
| Response |
| Question # |
| Reference |
| Question |
| Response |
| 1 |
| Exhibit 4D, Page 40 (RFP page 214) |
| Exhibit D states the contractor must administer “up to 4” hours baton and “up to 4” hours OC training each year, and semi-annual weapons qualifications… |
Question: Are 8 hours total “required” for baton/OC recerts and then S/A weapons quals as well, or is a total of 8 hours required for all three?
4 hours for baton 4 hours for OC Plus S/A weapons quals
| 2 |
| Exhibit 4D, Page 40 (RFP page 214) |
| Is there a minimum time required for S/A weapons quals? |
| No minimum time established to qualify, but must comply with the course of fire provided in Exhibit 4C |
| 3 |
| Exhibit 8c, Page 95 (RFP pages 269-272) |
| Exhibit 8c, provides for 4 acceptable weapons |
a. Is any particular weapon mandatory?
b. May the contractor provide different weapons to different sites/states as long as all weapons at any one site are the same?
See Amendment 000004 with updated Exhibit 8C and SOW 6.6.7. Note only St. Louis allows .38 cal, all other locations require a .40 cal.
| 4 |
| Weapons |
| What weapons are currently being used on this contract? |
| .38 cal. Taurus Model 82 in St. Louis, all other locations Smith & Wesson M&P .40 cal. |
| 5 |
| weapons |
| Is the same type of weapon used “contract-wide” ie, at all sites? |
| See # 3 and 4 above |
| 6 |
| Weapons |
| Is the weapon changing for this contract? |
No
| 7 |
| Exhibit 8e, Page 100 (RFP pages 274-275) |
| Exhibit 8e provides radio information but does not provide quantities; assuming each active post requires a radio daily… |
How many base stations are required to be provided?
See Amendment 000004 with updated Exhibit 8E
| 8 |
| Exhibit 8e, Page 100 (RFP pages 274-275) |
| Are “one officer” sites required to have handheld radio or will walkie-talkie cell phone suffice |
| See Amendment 000004 with updated Exhibit 8E |
| 9 |
| Exhibit 8e, Page 100 (RFP pages 274-275) |
| Is each post officer to carry a cell phone in addition to a radio? |
| See Amendment 000004 with updated Exhibit 8E |
| 10 |
| Exhibit 8e, Page 100 (RFP pages 274-275) |
| Are UHF or VHF radios required and how many channels? |
See Amendment 000004 with updated Exhibit 8E
| 11 |
| Exhibit 8f, Page 102 (RFP page 276 of 563) |
| Exhibit 8f provides vehicle requirements but locations/quantities are blank |
Are there any vehicle mounted patrols in this contract?
See Amendment 000004 with updated Exhibit 8F
| 12 |
| Solicitation Provisions |
Page 15, para b(3) (RFP page 30 of 563) This paragraph addresses escalation of wages for non-CBA/non-Wage Det personnel such as supervisors;
If a contractor plans to request a Wage Conformance Action for supervisors, should this request be completed and forwarded with the Bid or can it be delayed until 90 days prior to beginning of Option 1?
Reference the Note on Page 30 of 563 of the RFP. Refer to the Department of Labor for guidance on Conformance actions and procedures.
| 13 |
| Pricing |
| The solicitation indicates that service on this contract are to being 10/1/2011 |
The CBA for Local 214 IOWA expires on 9/30/2011 with no wage/H&W information for the base period which begins on 10/1/11. (page 34 of the solicitation and page 18 of the CBA); will FPS require the incumbent contractor to negotiate the wage rates for October 1, 2011 and forward them to FPS in sufficient time for contract incorporation and preparation of an REA by the incoming contractor prior to the start of the base year?
See Amendment 000001 -CBA for Local 214 merged with CBA Local 249
| 14 |
| Pricing |
| Will FPS allow an REA for the base year for the sites covered by LOCAL 214 even though the FAR restricts such REA’s in the event there is no timely negotiations? |
See Amendment 000001 and #13 above
| 15 |
| Pricing |
| The Wage Determinations for this contract are all dated in 2010; wage determinations are usually updated at least annually. If a new WD is issued prior to the start of the contract, will the new Wage Determination be incorporated and an REA allowed, or will the RFP WD’s be incorporated regardless if a new WD has been issued? |
Reference FAR 22.1007(b) and FAR 22.1012-1 (c)
| 16 |
| Transition |
SOW 2.1.1 (RFP page 117 of 563)
| Para 2.1.1 states that a maximum of 180 days will be allowed for transition; are we to prepare a 180 day transition plan for the proposal based on the maximum time allowable; or will a transition plan with less than 180 days be acceptable? |
| The RFP identifies a maximum period of 180 days allowed for transition. Thus, offers proposing less than 180 days for transition within the management approach will be evaluated in accordance with the evaluation criteria established. Offerors are reminded that all aspects of a proposal must be determined reasonable and realistic to be considered for award |
| 17 |
| Training/ |
Qualifications
| Are all incumbent contractor PSO’s considered current in their training requirements? |
| Incumbent PSOs are considered current to the incumbent contract training standards. |
Note the training requirements in this RFP are different from the incumbent contract
| 18 |
| Training/ |
Qualifications
| Are all incumbent contractor PSO’s considered current for physical exams? |
| Incumbent PSOs are considered current to the incumbent contract physical standards. |
Note the physical standards in this RFP are different from the incumbent contract
| 19 |
| Vacation Computation |
| Will the government provide a name redacted seniority list to enable bidders to properly compute vacation entitlements? |
| See Amendment 000004 with updated Seniority List |
| 20 |
| Post Exhibits |
| The post exhibits indicate which CBA or WD applies to the particular site listed; |
Column M (CLIN): What does the number in this column represent?
CLIN = Contract Line Item that will be represented on the resultant initial task order for basic services
| 21 |
| Past Performance |
| Are any resumes required to be submitted with the proposal? |
| No |
| 22 |
| Past Performance |
| May corporate resumes be submitted with the past performance section? |
| Refer to RFP page 71 and 72 of 563 under Technical Proposal, Relevant Past Performance paragraphs E and F |
| 23 |
| Vehicles |
| Are any “patrol” vehicles required? |
| See the post exhibits provided with the RFP and Amendment 000004 |
| 24 |
| Facility Clearance |
and SOW 5.4.1.2 (RFP page 135 of 163) The Proposal Submission Requirements state that a Top Secret Facility clearance (TSFC) is required; however, the post exhibits indicate that only DHS clearances are required. Is the TSFC required?
(Para 5.4.1.2 indicates “none” insofar as Top Secret Information is concerned) Reference SOW Section 5.4, a TSFC is required prior to performance. Also, See post exhibits provided for specific locations where TS cleared PSO’s are required.
| 25 |
| Pay for pre-certification training SOW para 6.1.7.3 (RFP page 138 of 563) |
| The RFP states that the contractor will apply the requirements of the Fair Labor Standards Act in paying applicants for pre-certification training; is this a reference to the Federal Minimum Wage requirement? |
| Reference SOW 6.1.7.1, FAR 22.1002-4, and refer to the Department of Labor for additional guidance on the application of the Fair Labor Standards Act |
| 26 |
| Pay for pre-certification training SOW para 6.1.7.3 (RFP page 138 of 563) |
| If a state minimum wage exceeds the Federal, does the state requirement supersede? |
| Refer to the Department of Labor for guidance |
| 27 |
| SOW Para 12.1.2 Breaks (RFP page 163 of 563) |
| If no state requirement or CBA article requires breaks to be provided, does the FPS mandate any specific breaks for rest periods or lunch? (For example two 15-minute breaks per hours worked, with 30 minute lunch period) |
| FPS does not mandate specific breaks, rest periods, or lunch. Refer to the applicable CBA and/or Wage Determination and Department of Labor for guidance |
| 28 |
| SOW para 14.4.5 (RFP page 168 of 563) |
Clearing Barrels and Gun Safes
| If the contractor provides an individual weapon to each PSO and they carry the weapon from home to site to home, and are responsible for cleaning their weapon while off duty, are gun safes required? |
| There is no FPS requirement for gun safes for this contract. |
| 29 |
| SOW para 14.4.5 (RFP page 168 of 563) |
Clearing Barrels and Gun Safes
| If the above is true, are clearing barrels required? (Since this paragraph precludes officers from removing their weapons from their holsters on government property for the purposes of clearing/cleaning.) |
| SOW Section 14.4.5 is clear on its face. Contractor is required to determine what accessories are applicable for this requirement. |
| 30 |
| SOW para 14.4.6 (RFP page 168 of 563) |
| This paragraph indicates that weapons may be stored “on site”; Is there sufficient space (ie, office, storage area) at the larger facilities for the officers to draw their duty weapon from a container, load and clear, and don the weapon and then report to post? |
| This RFP and resultant contract does not allow weapons to be stored on site. |
| 31 |
| SOW para 14.4.9 (RFP page 168 of 563) |
| Where (physically) do the officers inspect their weapons prior to assuming their post? |
| Off Government Property also reference SOW 14.4.5 |
| 32 |
| Guard Mount |
| Is formal guard mount for the purpose of pass down, gear-up/down required at any location on this contract? |
There is NO Government directed “formal” guard mount required
| 33 |
| Supervision |
| Are there any sites that require a “fixed” supervisor (as opposed to mobile)? |
| No |
| 34 |
| CBA LOCAL 249 KS/IA |
| Article 27 Wage Rates/Classifications states the rate of pay for LTs and Sergeants; |
a. Are supervisors in the cities covered by this CBA included under the CBA, and thus not part of overhead?
b. If so, how many LT positions and SGT positions are included under this CBA?
c. The CBA also makes participation in group health insurance optional; with cash payments if employee opts not to participate. Without some idea of the participation rates for offices under this CBA, all bidders except the incumbent would have to bid this as a taxable item, which would add substantially to their price total. Can we be provided with the approximate number of officers under this CBA who have elected to participate in the insurance plan so as not to give unfair advantage to any bidder?
The Government is not a party of the CBA
| 35 |
| CBA Local 20/UGSOA |
| This CBA states in Article 27 on page 39 of 49 that breaks are provided at the mid-point of 4 hour segments of the shift; however, it does not specify the length of the breaks for payment and relief purposes. |
Can the incumbent be requested to provide this information?
The Government is not a party of the CBA
| 36 |
| Socio-Economic Plan |
| Does the proposed Socio-Economic Plan count toward the technical proposal page limitation? |
| Yes |
| 37 |
| CBA for Local 214 |
| It appears that the CBA for Local 214 forwarded as an exhibit with the solicitation does NOT apply to any of these locations, please confirm? |
See Amendment 000001 - CBA for Local 214 merged with CBA Local 249
| 38 |
| SOW Section 5.1.2.4, (RFP page 124 of 563) |
| This version of the RFP, unlike previous versions of FPS solicitations, no longer allows an applicant with 2 years of college or an Associate’s Degree to be eligible for employment without also having at least 3 years of guard/military experience or a law enforcement academy certificate. Please confirm that it is FPS’ intent that individuals with 2 years of college alone (with no guard, military, or law enforcement experience) are no longer eligible for employment on this contract. Will incumbent employees with less than three years be grandfathered under the current contract? |
| Individuals with college experience alone without the minimum guard, military, or law enforcement experience identified in SOW section 5.1.2.4 are not considered qualified under the terms of the RFP. |
No grandfathering
| 39 |
| Section 5.2.3, SOW page18 and 19 / (RFP page 127 - 128 of 563) and Exhibit 7B (RFP pages 251 -265 of 563) |
| Are the requirements for the new Physical Abilities Test shown as Exhibit 7B aligned in terms of frequency with the Medical Examination requirements (I.e. initially at hire and then tri-annually)? If not, please specify the frequency required. |
| Yes. See SOW 5.2.2.1 and Amendment 000004 |
| 40 |
| Incumbent Contract Data / qualifications |
| Are incumbent PSOs current fully-qualified on all new SOW requirements, to include the PAT, semi-annual FAQ, revised Medical Exam requirements / documentation, etc)? Or shall Offerors factor retraining/recertification of incumbents in these areas as tasks requiring completion during the transition period? |
| Incumbent PSOs are not considered fully qualified on the new SOW requirements. Offerors shall factor in retraining/recertification of incumbent PSOs |
| 41 |
| Incumbent Contract Data / licenses |
| Are all incumbent PSOs that require state or local armed guard licenses (for example, PSOs assigned within St Louis, MO, etc) currently licensed/certified in each required jurisdiction per state or local law? |
| All incumbent PSOs are currently licensed and certified for the incumbent Contract |
| 42 |
| Technical Exhibits 4G - 4J (RFP pages 222- 226) |
| What are the locations within Region 6 where FPS conducts the government-provided training required in Exhibits 4G thru 4J? |
| Currently the Government-provided training site locations are: |
· 1222 Spruce, St. Louis, MO
· 601 East 12th Street, Kansas City, MO
· 210 Walnut, Des Moines, IA
· 850 S Street, Lincoln, NE
· 1301 W. Highland Blvd, Lincoln, NE
· 100 Centennial Mall North, Lincoln, NE
| 43 |
| Firearms qualification |
| Which range facilities (private or government) within Region 6 are approved by FPS for the conduct of firearms qualification? |
| Any range that is set up to accommodate the course of fire identified in the RFP |
| 44 |
| PIV Cards |
| What are the locations where PIV cards are produced and issued? |
| Presently these are the PIV locations, subject to change. |
· 1500 E. Bannister Road, Kansas City, MO
· 1222 Spruce, St. Louis, MO
· 210 Walnut, Des Moines, IA
· 111 S. 18th Plaza, Omaha, NE
| Exhibit 8C (RFP pages 269 -272) |
| Which weapon type(s) shown in Exhibit 8C is required on this contract? Is the weapon type the same for all posts or do some post require a different weapon due to local law? |
| See #3 above |
See Amendment 000004 with updated Exhibit 8C and SOW 6.6.7. Note only St. Louis allows .38 cal, all other locations require a .40 cal.
| 46 |
| Weapons |
| Aside from the new semi-annual FAQ requirement, are all incumbent PSOs certified on the weapon type(s) required in this RFP? |
| See # 4 and 6 above |
| 47 |
| Technical Exhibit 8E |
| What contractor-provided communications equipment is required? Exhibit 8E has no quantities. Or is all communications equipment government-provided (radios and cell phones)? |
| See Amendment 000004 with updated Exhibit 8E |
| 48 |
| Technical Exhibit 8F |
| Are there any contractor-provided vehicles required? Exhibit 8F is blank. |
| See Amendment 000004 with updated Exhibit 8F |
| 49 |
| GFP/GFE |
| Does the government provide any office space, furniture, or office equipment for the contract management and administration? Or shall Offerors factor the cost of these in to their fully-burdened labor rates? |
| The Government will not provide any GFP/GFE |
| 50 |
| Technical Exhibit 6 |
| PTS Instructions is blank. Is this system currently operational on this contract, or will it be installed at a later date? |
| PTS is not operational at this time. |
| 51 |
| Page 7 of Post Exhibit 1A |
| Building number MO1861 is listed as consisting of four posts with an annual productive hour total of 23,616. The same building is listed on page 8 of Exhibit 1A as consisting of four posts with an annual productive hour total of 18,486. Will the Government please confirm which entry is correct? |
| See Amendment 00003 with updated post exhibit |
| 52 |
| Page 1 of Post Exhibit 1D - building IA1501 |
| The post at building IA1501 is listed as a nine hour day that operates Monday – Friday excluding holidays. However, the total days are listed as 53 and the total hours are only 477. Will the Government please clarify the correct hours per day, operating days, total days and total hours? |
| See Amendment 00003 with updated post exhibit – this location is deleted |
| 53 |
| Page 1 of Post Exhibit 1A - Building number IA1516 |
| Building number IA1516 is listed as operating Monday – Friday excluding holidays for a total of 251 days. Other buildings on this page are also listed as operating Monday – Friday excluding holidays but have 252 total days. Will the Government please correct building IA1516 to reflect the correct number of days? |
| See Amendment 00003 with updated post exhibit |
| 54 |
| Page 8 of Post Exhibit 1A |
| Building number MO1973 operates Tuesday – Saturday excluding holidays for a total of 256 days. Tuesday – Saturday is five days a week. Will the Government please correct the total number of days for this post? |
| See Amendment 00003 with updated post exhibit |
| 55 |
| Incumbent |
| Will FPS provide the successful offeror with incumbent RAMP information (certification and training status for each PSO) upon contract award? If so, when can the successful offeror expect to receive this? |
| No |
| 56 |
| Incumbent |
| Will the incumbent contractor be required to follow the current SOW requirement to turn over all incumbent employee information, including training documentation, personnel records and suitability expiration dates? If so, when can the successful offeror expect to receive these files? |
a. The contractor shall provide a list with the total number of employees and their names performing on the Contract with any applicable suitability and certification expiration dates when requested by the CO in preparation for a new solicitation for follow-on services. Prior to Contract expiration and after a follow-on contract is awarded, the Contractor shall exercise its best efforts and cooperation to effect an orderly and efficient transition to a successor contractor.
b. After a new Contract is awarded, the Contractor shall disclose necessary personnel records sufficient to allow the successor Contractor to conduct interviews for possible transition (if the Contractor is not awarded the successor Contract). These records shall be provided to the successor at least 45 days prior to date of Contract expiration. If any incumbent employees are selected by the successor and are agreeable to the change, the incumbent Contractor should cooperate to grant the employees release at a mutually agreed date.
c. As part of the closeout process, the Contractor shall, within 30 days of the final day of performance, turn over all incumbent officer training, medical, suitability and security records to the successor contractor as stated in paragraph 19A, 1 thru 17. Failure to do so shall result in a 10% withholding of final payment until this action is accomplished In accordance with the terms of the incumbent contract “After a new Contract is awarded, the Contractor shall disclose necessary personnel records sufficient to allow the successor Contractor to conduct interviews for possible transition (if the Contractor is not awarded the successor Contract). These records shall be provided to the successor at least 45 days prior to date of Contract expiration. If any incumbent employees are selected by the successor and are agreeable to the change, the incumbent Contractor should cooperate to grant the employees release at a mutually agreed date.
As part of the closeout process, the Contractor shall, within 30 days of the final day of performance, turn over all incumbent officer training, medical, suitability and security records to the successor contractor…”
| 57 |
| Transition |
| Does the Government intend to allow a 180 day (six month) phase-in period for this contract? |
| See #16 above |
| 58 |
| RFP Page 69 of 563 - Subcontracting Plan |
| Are Offerors to submit their Small Business Subcontracting Plan with their proposals or after Award? If submitted with the proposal, is the Plan excluded from the 20 page limit? |
| See Amendment 000004 for revised proposal submission requirements |
| 59 |
| RFP Page 73 of 563 |
| States “The Government defines a Lead PSO as a single point of communications at a facility, identified by post orders, for the purpose of communicating operation and facility specific info to the security force at a facility.” Do the current Post Orders designate any posts as Lead PSOs? |
a. If so, which ones? (If not, shall Offerors assume that all Supervision proposed must be in addition to the current productive post hours required in Exhibit 1?
b. Or can Offerors propose that certain posts be designated as Lead PSOs as part of their supervision plan?
Yes, some current post orders designate some posts as Lead PSO.
a. Below are the locations whose post order designate a lead PSO:
MO1867 – USDA, 6501 Beacon Drive, Kansas City, MO
MO1861 – FAA, 901 Locust, Kansas City, MO
MO1937 – IRS, 333 W. Pershing Road, Kansas City, MO
KS1540 – EPA, 901 North 5th, Kansas City, KS
NE1380 – USCIS, 850 S Street, Lincoln, NE
NE1428 - USCIS, 1301 West Highland Boulevard, Lincoln, NE
b. Reference RFP page 72 and 73 and 162
| 60 |
| Weapons storage |
| Are on-site government-provided weapons storage containers and clearing barrels available at all facilities? Or are PSOs expected to take their assigned weapon home after completing each shift? |
| There are no locations where weapons are left on-site |
| 61 |
| Past Performance |
| If two companies form a joint venture and also use a small business subcontractor, will they be allowed to submit nine past performances – three for each partner in the JV and three for the subcontractor? |
Or will the JV considered one entity and limited to a total of three past performance references?
Yes
| 62 |
| Technical proposal |
| If an Offeror includes a Table of Contents, will this be included in the page count for the technical volume? |
| See Amendment 000004 for revised proposal submission requirements |
| 63 |
| SF 1449 continuation pages 3 -8 |
| Are bidders required to fill out the continuation pages of the SF1449 (pages 3-8) or does the Schedule of Supplies Services and Prices-final.xls replace the continuation pages? If bidders must fill out the continuation pages of the SF 1449 as well as the Schedule of Supplies and Services, could the Government please provide the SF1449 as a MS Word or MS Excel file? |
| Offerors shall complete the continuation pages of the 1449 (RFP pages 4 -9) and submit them with the price proposal. Offerors are requested to complete and provide a soft copy of the MS Excel file for the Schedule of Prices that was provided within the winzip version of the RFP file posted on 1/14/11. See Amendment 000004 for complete revised proposal submission requirements |
| 64 |
| CBA /WD |
| Will the Government please confirm we DO NOT need CBA 214, WD 2213 & WD 2215? The post list does not include these; however, they were issued with the RFP. |
| See Amendment 000001 and Amendment 000004 |
| 65 |
| CBA/WD |
| Will the Government please confirm which cities are considered to be in the Missouri "Boot" area? The RFP states: Cape Girardeau, Kennett, Sikeston & Poplar Bluff. Are the following cities also considered part of the "Metro" area: Park Hills, Creve Coeur, Chesterfield, Union, Earth City, Florissant, St Peters and Fenton? |
| Refer to CBA UGSOA Local 20 |
| 66 |
| On-the-job training |
| Are there any site-specific OJT requirements that are not contained in the exhibits or the RFP? If so, will FPS please provide these training details? |
| No. The Solicitation is clear on its face |
| 67 |
| Post Exhibit 1E |
| SSA, the post in building number IA1507 is listed as requiring relief. However, the other posts on this page are governed by the same CBA and are operational for longer periods of time, yet they do not require relief. There are several examples of this throughout the Post Exhibits. Will the Government please confirm which posts in the Post Exhibits require relief? Of the posts that do require relief, are those breaks paid or unpaid? |
| The Solicitation is clear on its face. |
The post exhibit locations which indicate relief is required means that post requires continuous coverage. How an offeror proposes to manage the provision of the required continuous coverage is part of an offeror’s business decision
| 68 |
| Training |
| Does FPS need to be present at all collapsible baton training for incumbent employees? |
| FPS may be present at collapsible baton training |
| 69 |
| Section 1.4.2 |
| Is the contractor responsible for updating the Duty Book? |
| No, See Amendment 000004 |
| 70 |
| Section 1.4.4 |
| Is “Post Desk Book” synonymous with “Officer’s Duty Book”? |
| Yes |
| 71 |
| Section 4.3.3 |
| This section states that officers will travel between their duty location and residence with their firearm. Will each duty location be equipped with a clearing barrel? If so, will this be government or contractor furnished? |
There will NOT be any clearing barrels at any post location under this contract.
See # 29 above
| 72 |
| Section 5.1.3.2 (RFP page 124 of 563) |
| Indicates that the Government may require PSOs to possess proficiency in a specific language on certain posts per Exhibit 1. Nothing is indicated on Exhibit 1. May bidders assume that no additional language requirements will be required? |
| Yes |
| 73 |
| Section 5.3 (RFP pages 130 - 134 of 563) |
| Indicates that Contractor’s training personnel are required to receive suitabilities. Is this true for contractor personnel that are not required to be on the contract nor possess any knowledge of the contract. For example, if the Contractor elects to sub-contract the American Red Cross (ARC) training to the local ARC chapter, are the ARC instructors required to receive a suitability? |
See SOW 5.3.1.1 which states in pertinent part:
After award of the contract and prior to permitting any contract employees to work under the contract, the Contractor is responsible for ensuring that at a minimum, the Contract Manager, Supervisors, Training Instructors, Quality Assurance personnel, PSOs, and all other company officers that visit the work sites, receive formal suitability adjudication by FPS.
| 74 |
| Section 5.4.2 |
| Does this contract require a security clearance? If so, what posts require a security clearance? |
| Reference RFP Page 68 of 563 and post exhibits |
| 75 |
| Section 6.4.1.2 |
| This section lists “Supervisory Training” under the one-time training requirements for Protective Security Officers. Are PSOs required to complete supervisory training? |
| Only those PSO who are assigned detail as Supervisor are required to complete supervisory training |
| 76 |
| Section 6.5 |
| This section indicates that the Contractor can schedule the SGIM exam upon completion of the basic training and receiving a favorable pre-employment suitability. While it is understood that the applicant must complete the training and receive the favorable pre-employment suitability prior to taking the examination, is it necessary for the Contractor to wait for these items to “schedule” the examination. This causes unnecessary delay in the processing of new hires and results in the same outcome. |
a. If the contractor must wait for suitability determinations from the government, what standard amount of time will the government take to provide such suitability determinations?
b. Will the government reimburse the contractor for costs in excess of that standard timeframe?
a. There is no standard amount of time. However, Reference 5.3.1.2 once complete and accurate documentation is submitted properly through e-quip.
b. no reimbursement shall be provided
| 77 |
| Section 6.6.2 |
| This section Indicates that the Contractors is responsible for conducting 40 hrs of weapons training prior to sending the contract employee to a firing range for the initial range qualification test session. Of the 40 hours, 8 hours will be classroom training on firearms, eight hours intermediate weapons training, and 24 hours will be actual training/shooting time on a firing range/firing line exclusive of any waiting or down time spent off of the firing lines” |
a. Are incumbent contractors required to complete the 40 hrs of training if they are already qualified on the weapon platform?
b. Please define/clarify further what is meant by 24 hours of “actual training/shooting time on a firing range/firing line exclusive of any waiting or down time spent off the firing lines”.
a. See SOW 6.6.1.1
b. The Solicitation is clear on its face.
An individual must spend a minimum of 24 hours of training, actual course(s) of fire (on range, taking commands, firing rounds at a target).
| 78 |
| Section 6.6.7 |
| The other weapons listed under this contract indicate that “PSO services for the St. Louis Metro and St. Louis County are shall carry .38 caliber revolver.” As this is listed in the other weapons section of the contract, are the PSOs posted in St. Louis City and St. Louis County also required to qualify on a .40 caliber semi-automatic? |
| See # 3 above |
| 79 |
| Section 6.7.3 |
| This section requires the government to conduct 8 hours of computer-based screener training? |
· For planning purposes, when can the Contractor schedule this training?
· What duration should the Contractor anticipate between date of schedule and date of training completion?
· Where is this training provided?
· How will the Contractor receive the results of this training?
· When will the Contractor receive certification that this training was completed successfully?
· Will the government reimburse the contractor for any costs incurred beyond the standard timeframe for receipt of training certification?
Computer-Based Training (CBT) is not active. This section is not applicable at this time.
| 80 |
| Section 6.7.4 |
| This section states that the government will conduct 8 hours of screener training. |
For planning purposes, when can the Contractor schedule this training?
What duration should the Contractor anticipate between date of schedule and date of training completion?
Where is this training provided?
How will the Contractor receive the results of this training?
When will the Contractor receive certification that this training was completed successfully?
Will the government reimburse the contractor for any costs incurred beyond the standard timeframe for receipt of training certification?
Computer Based Training (CBT) is not currently active. Until such time as CBT becomes active, R6 will provide 8 hours of x-ray/magnetometer training.
See #42 above for current Government training locations.
Reference RFP price proposal section pages 78 & 79 of 563
| 81 |
| Section 6.7.5 |
| This section requires the government to conduct 8 hours of recurrent training. |
For planning purposes, when can the Contractor schedule this training?
What duration should the Contractor anticipate between date of schedule and date of training completion?
Where is this training provided?
How will the Contractor receive the results of this training?
When will the Contractor receive certification that this training was completed successfully?
Will the government reimburse the contractor for any costs incurred beyond the standard timeframe for receipt of training certification?
The scheduling and completion of training shall be coordinated with the COTR after award.
See #42 above for current Government training locations
See SOW sections 6.1.7, 6.1.7.1, 6.1.7.2, 6.1.7.3, and 6.1.10 for factoring all training costs into the proposal
| 82 |
| Section 7.2 |
| Indicates the requirement to submit all PSO certifications within seven days of completion. Will the incumbent PSO’s data be transferred over to the new Contractor? |
| See #55 and 56 above |
| 83 |
| Section 7.3.1.5 |
| Indicates that the personnel filing system must contain proof of education and lists H.S. Diploma or GED. For individuals that do not have access to their H.S. Diploma, will the following suffice: |
H.S. Transcripts – indicating PSO graduated?
College Transcripts – indicating PSO graduated H.S.?
College Diploma from an accredited institution?
DD-214 – that clearly indicates the PSO has received a H.S. Diploma or GED?
Letter from High School administrator indicating that the individual graduated from H.S.?
No, a High School diploma or GED is required. Also see # 99 below.
| 84 |
| Section 9.21.1 |
| Indicates that the “Government will provide the Contractor with the necessary personnel identification numbers after receiving certification and testing data for the employee.” |
By what means should the Contractor provide this certification and testing information?
How long should the Contractor anticipate between the submission of this information and receiving the personnel identification numbers?
Will the government reimburse the contractor for any associated costs incurred beyond the standard timeframe for receipt of personnel identification numbers?
See #50 above
| 85 |
| Section 9.21.1 |
| Will the contractor be required to supply the communication equipment necessary to call in to PTS or will the government? |
If the contractor is required to supply communication equipment, what are the government’s equipment specifications and requirements?
See Amendment 00003 and updated Exhibit 8E
| 86 |
| Section 9.22.3 |
| This section Indicates that “If the Contractor uses DHS Form 139, the Contractor will retrieve the forms from each post and submit the reports for the previous week to the COTR every Monday by 10:00 AM or as otherwise directed by the COTR.” |
a. Will the Contractor have access to government provided fax machines?
b. Which form of hour tracking will this contract require? (if the government were to switch from PTS to the 139 Form, the Contractor would be faced with a number of expenses, to include: fax machines / lines, or mileage / hours driving between posts to retrieve the necessary 139 logs.)
a. No
b. See #50 above
| 87 |
| Section 11.4 |
| This section lists Training Instructors as Key Personnel requiring a key personnel resume. Are Contractors not able to sub-contract American Red Cross training with local ARC chapter instructors? If so, does the Government require a Key Personnel resume and CO approval for each ARC instructor? |
| Solicitation is clear on its face |
| 88 |
| Section 13.5 |
| This section discusses the process for PIV cards. Please clarify the following: |
a. Where are the PIV card enrollment stations?
b. How long does the COTR determination take for granting government sponsorship?
c. Will the government reimburse the contractor for any associated costs incurred beyond the standard timeframe for communicating government sponsorship determination?
d. How soon after granting government sponsorship can the applicant go to an enrollment station?
a. Presently these are the PIV locations, subject to change.
· 1500 E. Bannister Road, Kansas City, MO
· 1222 Spruce, St. Louis, MO
· 210 Walnut, Des Moines, IA
· 111 S. 18th Plaza, Omaha, NE
b. No time frame is set
c. No
d. See SOW 13.5.1.2
| 89 |
| Technical Exhibit 8C |
| To clarify is it a correct assumption that FPS will accept a 9mm, .38 Special, .40 S&W or a 357? |
| See Amendment 000004 with updated Exhibit 8C |
| 90 |
| Technical Exhibit 8E |
| The RFP is missing the quantity information. Please clarify the communication equipment quantity requirements. |
| See Amendment 000004 with updated Exhibit 8E |
| 91 |
| Technical Exhibit 8F |
| The RFP is missing the quantity information. What are the contractor-provided vehicle quantity requirements? |
| See Amendment 000004 with updated Exhibit 8F |
| 92 |
| Pg. 38- 6.8.1.3 and 6.8.2.4 (First Aid and CPR/AED) |
| This section still details CPR/AED certification as 1 year and First Aid certification length as 3 year expiration / requalification dates. Does FPS intend to modify this to reflect the change to 2 yrs certification lengths, per the new ARC and AHA standards? (Also appears on Pg. 41- L, M, N) |
See Amendment 000004
| 93 |
| Base Year period |
| If the contract award is delayed, will the period of performance remain at one year with four option periods or will the base year shorten? |
| The total period of performance (inclusive of all options) |
for the resultant contract will 60 months
| 94 |
| PPE respiratory fit test |
| Can the PPE respiratory fit test be conducted on post? |
| No |
| 95 |
| Section 1.4.2 |
| This section states that the Contracting Officer’s Technical Representative (COTR) shall furnish an Officer's Duty Book containing complete duty instructions for each post and also states that the Contractor shall maintain the duty book. |
Please clarify what is meant by “maintain” the duty book – what does this entail on the part of the contractor.
Does it require the contractor to replace binders for wear and tear?
Does it require the distribution of documents in hard copy to all sites on the contract? If so, how many times per/week is the distribution of notices/changes to those sites required on average?
Will the contractor be held to a specified timeline for such distribution?
See Amendment 000004
| 96 |
| Section 1.4.4 |
| This section references both a Post Desk Book and Post Orders. What is the difference/relation of these books to the Duty Book? |
| See #70 above |
| 97 |
| Section 4.1.1 |
| This section states that the Contractor bears the sole burden for obtaining and renewing all legally required licenses and permits as specified by the applicable federal, state, and/or local regulating agencies. The Contractor shall possess ALL licenses required to perform services under this effort. |
The licensing and permit requirements for PSOs as stated in Sections 4.1.1 and 4.1.2 do not specify any conditions/exceptions for emergency services or for other unforecasted personnel requirements in areas with traditionally low workforce populations. (for example, storm related damage in rural Kansas that might require 30 PSO’s for emergency service). Will the government provide coverage for these requirements until the contractor can obtain permits required in rural areas not normally worked by the contract in large numbers?
No
| 98 |
| Section 4.1.4 |
| This section states that “the incoming Contractor shall NOT impede or impose on the existing Contractor licenses in place. FPS will not recognize the transition of the existing licenses to the incoming Contractor until the specific day the new Contractor assumes staffing of posts”. |
a. In jurisdictions where this may become an issue due to local laws or regulations (limiting issuance of such licenses/permits to one vendor) what remedy does the government propose to overcome a State/Municipal impediment to the SOW as stated?
b. If the local jurisdiction mandates that licenses be transferred in a manner that FPS disagrees with, please advise how the Contractor should handle this situation.
Also, please list any historically problematic jurisdictions?
a. The Solicitation is clear on its face.
b. There are no known problematic jurisdictions
| 99 |
| 5.1.2.3 Education |
| This section states that the PSO must have received either a High School Diploma or a General Equivalency Diploma (GED) from an accredited institution recognized by the U.S. Department of Education. Does the government accept higher education diploma in place of HS Diplomas or GEDs or must the PSO have a HS Diploma/GED on file. |
| The Government will accept a higher education diploma. |
| 100 |
| Section 5.2.1.2 and 5.2.2.3 |
| This section states that the Contractor is also responsible for ensuring that all uniformed employees are able to perform the essential functions described in the SOW, with any reasonable accommodation. If one of the Contractor's employees alleges that the employee has a disability and requires a reasonable accommodation to perform the essential functions of the job, it is the Contractor's sole responsibility to discuss reasonable accommodation with its employee and to decide what accommodation, if any, to provide at its own expense. |
Given that the contractor has no control over facilities where PSOs perform their duties, can the government provide an example of how a contractor might provide an accommodation under the ADA?
Has there ever been such an accommodation under this Region or any other Region or FPS contract of this type?
The solicitation is clear on its face. The contractor is responsible for determining that PSOs are capable and fully able to perform all required functions in accordance with the terms and conditions of the contract. As the employer for the PSO, the contractor has the obligation to determine whether or not a PSO is capable to perform in accordance with the terms and conditions of the contract.
| 101 |
| Section 5.2.3.2 |
| This section states that the Contractor shall remove individuals deemed incapable of performing the above tasks or functions from the contract. |
a. Please define “incapable” in this context and please clarify who has the authority to deem an individual incapable.
b. Can any FPO or Inspector remove an individual based on their observations and will those observations be detailed in writing prior to a removal?
a. The contractor is responsible for determining that PSOs are capable and fully able to perform all required functions in accordance with the terms and conditions of the contract. As the employer for the PSO, the contractor has the obligation to determine whether or not a PSO is capable to perform in accordance with the terms and conditions of the contract.
b. PSOs are the employees of the contractor. Any removal request or decision on the part of FPS in not to be interpreted as an assumption of an employer role, but rather an action taken solely in the interest of safeguarding the United States. Any requests fro removal from the contract will be provided to the contractor by the Contracting Officer, along with any supporting documentation that is releasable at that time, with the expectation that the contractor will take appropriate action.
| 102 |
| Section 9.8.1 |
| This section states that PSOs assigned to Control Center Operations Posts serve as the central point for all communication and information entering/ leaving the facility, as well as operate and monitor security and safety systems. This post also serves as the emergency contact for local first responders (fire, police, and emergency medical personnel). Please specify how many of these posts exist on this contract and where they are located? |
| This information will be provided to the successful offeror after contract award |
| 103 |
| Section 9.10.2 |
| This section states that PSOs shall not remove the keys and other access control devices from the facility premises unless specifically authorized by the COTR. The Contractor shall immediately report to FPS any instance of missing, lost, unusable, and or stolen keys or access control devices. |
On posts where there is not 24 hour coverage (PSO to PSO key control), will the government provide a mechanism to conduct key exchanges/issue for PSOs reporting for duty and not relieving another guard? How does a PSO reporting for duty obtain the keys/key card for the shift?
The Government will not provide a mechanism to conduct key exchanges
| 104 |
| Section 1.4.2. |
| Please clarify how the Contractor should maintain the Duty Book” when they are not permitted to have master copies? |
Will the government provide guidelines for maintaining the Duty Book?
See Amendment 000004
| 105 |
| Section 4.1.4 |
| Please clarify if the new contractor is required to obtain a new permit/license when a transitioned employee holds a current certificate? |
| Solicitation is clear on its face |
| 106 |
| Section 6.6.1.1 |
| If FPS changes the course of fire, will it require all previously trained PSOs to complete a new 40 Hour Initial Firearms Training? |
| Changes to the terms of the contract would be handle in accordance with FAR 52.212-4 |
| 107 |
| SOW Section 9.4.2 |
| This section deals with the requirements for PSOs to verify identification at some facilities. Are there full-color samples of all the authorized access identification media at each post? |
| Samples of any authorized access identification may be included in the Post Orders |
| 108 |
| SOW 9.21.4 and 9.21.5 |
| Section 9.21.5 states that the Contractor payment will be adjusted if the PSO calls into PTS later than the scheduled post start time. However, the previous paragraph states that the PSO must call into PTS within 15 minutes of the scheduled post start time. Please clarify. |
Will the government provide the contractor periodic access to the PTS data (prior to billing)?
PTS is not active. This section does not apply at this time.
| 109 |
| SOW 9.21.6 |
| Please clarify how this will be handled by FPS if the PSO is certified, but RAMP incorrectly shows the individual as non-certified? |
| Hypothetical question – no direct response provided. To be determined based on situation and handled by CO/COTR during administration |
| 110 |
| SOW 12.1.2.1 |
| Please clarify the following: |
· How many breaks per shift based on the duration of the shift?
· What is the time duration of the break?
· Are these breaks for day shift only?
· What breaks are expected for a standalone 24-7 post?
· Who is billed to FPS, the PSO on post, or the breaker?
· Is the PSO on break unpaid?
· According to the Exhibit 1, there 214 posts requiring breaks?
See #27 above
| 111 |
| SOW 14.4 |
| Please clarify what posts require vehicles and how many vehicles are required? |
| See Amendment 000004 with updated Exhibit 8F |
| 112 |
| Technical Exhibit 4J |
| Does the Body Armor worn under the uniform need to be Black? |
| Solicitation is clear on its face – Reference Exhibit 8A |
| 113 |
| Section: SOW – 1.4.2 |
| This section states that the Contracting Officers Technical Representative (COTR) shall furnish an Officers Duty Book containing complete duty instructions for each post. The Contractor shall maintain the duty book”. Please clarify who is responsible for placing future FPS directives, warnings, bulletins or BOLOs in the duty book? |
| See Amendment 000004 |
| 114 |
| Section: SOW – 1.4.4 |
| This section states that the “Contractor and its employees shall not reproduce or copy the contents of the Officers Duty Book in any manner unless authorized in writing by COTR”. Please clarify who is responsible for providing government forms for the post duty book? How will those copies be made? |
| See Amendment 000004 |
| 115 |
| Section: SOW – 5.2.2.1 |
| This section states that “Once a prospective contract employee applies for a position and receives a favorable evaluation by the Contractor, the Contractor shall submit to the COTR the following Government furnished forms for each contract employee; CIW, (2) Fingerprint cards, DHS Form 11000-9, Foreign National relatives or Associates Statement, Lautenberg Statement, Standard Form 85P, 85P-S and Signed e-Verify Confirmation Notice”. |
Do any documents from a cleared incumbent employee (Someone previously cleared to work before some of the above documents were mandated) have to be sent to the COTR before those same PSO’s may work the new contract?
Yes
| 116 |
| Section: SOW – 6.6.1.3 |
| This section states that “If the target is non-turning, the Contractor shall use a shot timer”. Can a stop watch, verbal commands or whistle be used in place of a shot timer? |
Does the government have a Standard Operating Procedure for how the range should be conducted? If so, can the government please provide it as part of a solicitation amendment?
Solicitation is clear on its face.
Standard Operating Procedures will not be provided with this RFP
| 117 |
| Section: SOW – 6.6.3.2, 6.6.4.1 and 6.6.4.2. 6.6.4.4 |
| “After failing the second qualification session, the contractor must provide a minimum of eight (8) hours of remedial training prior to each session (two [2] attempts) at qualification by the employee”. |
The wording in these sections appear confusing. The contract’s intent is to grant each PSO two sessions in which to qualify. Each session consist of two (2) attempts to qualify. If the PSO fails to qualify in the first session (1st or 2nd qualification attempt) they receive 8 hours of remedial training and must qualify in the second session (3rd or 4th attempt to qualify). The above section 6.6.4.4 wording has the contractor providing an 8 hour block of remedial training after the second session (3rd and 4th failed attempt to qualify), not the first session. The words “session” and “attempt” interchanged between the paragraphs. A suggestion on how this paragraph should read, “After failing the first qualification session, the contractor must provide a minimum of eight (8) hours of remedial training prior to the second session (last two [2] attempts) at qualification by the employee”. Can this paragraph be reworded to provide better clarification as to when the remedial training is required?
The Solicitation is clear on its face. Reference Section 6.6.3.2 and 6.6.4.1
| 118 |
| Section: SOW – 6.8.1.1 |
| This section states that “PSO’s and uniformed supervisors must possess valid and current First Aid certification cards from the American Red Cross (ARC) or the American Heart Association (AHA) to perform on this contract”. |
Will ARC cards reflecting current qualifications in CPR, AED and First Aid held by officers currently working this contract be valid for use on the new contract?
See Amendment 000004
| 119 |
| Section: SOW – 6.8.1.3 |
| This section states that “While the contractor is responsible for ensuring that employees are continuously certified in full-course curriculum in accordance with either ARC or AHA certification cycles, FPS will administratively track First Aid training and certification on a three (3)-year cycle from initial certification date to determine compliance with contract requirements”. |
American Red Cross standards for recertification of First Aid Training is every two years. Will the government administratively track First Aid training and certification on a three (3)-year cycle or modify the cycle to the current ARC standards?
See Amendment 000004
| 120 |
| Section: SOW – 7.2.3 |
| This section states that “The contractor shall submit all updated certification information on any contract employee no later than seven (7) calendar days after completion of any certification related requirement. In what manner or method should the contractor submit updated certification information? |
| See SOW 7.2.1 and 7.2.2 |
| 121 |
| Section: SOW – 9.6.1 |
| This section states that “No PSO shall work on any post containing security equipment without prior training on that specific equipment”. |
a. Please clarify who will conduct the required training associated with the specific equipment that is on each post?
b. How will that training be documented?
c. Will previously qualified PSO’s be grandfathered if a new documentation process is used?
a. The contractor
b. At Contractor’s discretion
c. No
| 122 |
| Section: SOW – 9.6.3 |
| This section states that “PSO’s will conduct and record performance test of security equipment as directed in the Post Orders. Conduct of these performances test may be conducted daily, weekly, or monthly on security equipment such as walkthrough and hand-held metal detectors, x-ray machines, ionizers, air samples, under-carriage inspection systems, active traffic barriers, and other automated security services”. |
Will all PSO’s receive additional training that will enable them to conduct such test on the security equipment located on their post?
How will that training be initially documented and the performance test periodically logged?
See #121 above