About this file

Attachment 3 RBPR Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Manufactured Housing Units, newest first.
File Type Posted
Attachment_3_RBPR_Matrix_2nd_Half_.xlsx XLSX spreadsheet
Attachment_2_F_R_B_Performance_Requirements__versionBB_23July2014.pdf PDF
HSFE70-14-R-0005_A00003.pdf PDF
MHU_Solictation_QA_Comment_Matrix_18_Jul_14.xlsx XLSX spreadsheet
Attachment_16_Section_E_MHU_Quality_Assurance_Plan_18Jul2014.pdf PDF
HSFE70-14-R-0005_Solicitation_A00002_.pdf PDF
Attachment_2_F_R_B_Performance_Requirements__versionBB_18July2014_1600_.pdf PDF
Attachment_3_FEMA_Rugged_Based_Performance_Requirements_Matrix_18July2014_1600.docx DOCX document
HSFE70-14-R-0005_A00002.pdf PDF
HSFE70-14-R-0005_A00001.pdf PDF
Responses_to_Draft_RFP_Comments_HSFE70-14-R-0005.pdf PDF
Attachment_20_Reference_Table.pdf PDF
Attachment_2_F_R_B_Performance_Requirements__versionBB.pdf PDF
Attachment_16_Section_E_MHU_Quality_Assurance_Plan.pdf PDF
Attachment_7_Delivery_Schedule_Template.xlsx XLSX spreadsheet
Attachment_12_Warranty_Repairs_In_The_Field_List.xlsx XLSX spreadsheet
Attachment_15_Comment_Matrix_.xlsx XLSX spreadsheet
Attachment_11_Design_Details_for_Accessible_Disaster_Relief_Housing_Guide.pdf PDF
Attachment_9_Invoice-Sample_Summary.pdf PDF
Attachment_19_MHU_Idenfication_Number_Summary.pdf PDF
Attachment_10_Production_Facility_Inspection_Report.pdf PDF
Attachment_13_Acronyms_and_Definitions.pdf PDF
Attachment_5_Manufactured_Home_Acceptance_Inspection_List.xlsx XLSX spreadsheet
Attachment_18_Minimum_Essential_Requirements.pdf PDF
Attachment_1_-_Pricing.xlsx XLSX spreadsheet
Attachment_3_FEMA_Rugged_Base_Performance_Requirements_Matrix.pdf PDF
Attachment_14_MHU_Past_Perofrmance_Questionnaire.pdf PDF
Attachment_17_MHU_sizing_table_for_Section_L.pdf PDF
Attachment_4_MHU_First_Article_Testing_Inspection_Checklist.xlsx XLSX spreadsheet
HSFE70-14-R-0005_Solicitation.pdf PDF
Attachment_6_MFG_shipment_sheet.xlsx XLSX spreadsheet
Attachment_8_Unit_Production_Report.xlsx XLSX spreadsheet
Attachment_9_Invoice-Sample_Summary.docx DOCX document
Attachment_8Unit_Production_Report.xlsx XLSX spreadsheet
Attachment_2_F_R_B_Performance_Requirements__19dec2013_1517.docx DOCX document
Attachment_12_Chargeback_List_06Dec2013_1510_hrs.xlsx XLSX spreadsheet
MHU_PPQ_Form_12-18.docx DOCX document
Attachment_4_MHU_First_Article_Testing_Inspection_Checklist.xlsx XLSX spreadsheet
Attachment_15_Comment_Matrix_.xlsx XLSX spreadsheet
Attachment_5_Manufactured_Home_Acceptance_Inspection_List_19dec2013.xlsx XLSX spreadsheet
Section_B_CLIN_Table_and_Non_Small_Business_Scenarios_1a_and_1b__06022014.xlsx XLSX spreadsheet
Attachment_10_Production_Facility_Inspection_report.docx DOCX document
Section_B_CLIN_Table_and_Small_Business_Scenarios_1c_and_1d_01312014_1108_hrs.xlsx XLSX spreadsheet
HSFE70-14-R-0005_draft_Sol-2-6-14.pdf PDF
Attachment_11_Design_Details_for_Accessible_Disaster_Relief_Housing_Guid....pdf PDF
Attachment_7_Delivery_Schedule_Template.xlsx XLSX spreadsheet
Attachment_6_MFG_shipment_sheet.xlsx XLSX spreadsheet
Attachment_13_Acronyms_and_Definitions_17dec2013.docx DOCX document
Synopsis_For_MHU_Long_Term_1-8-14.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3 : FEMA Rugged Based Performance Requirement Matrix

Summary and Overview In the FEMA Rugged Base Performance Requirements (Section J: Attachment 3) there are series of numbered shall’s (“shall(#)”). For each numbered shall (“shall(#)”). , the contractor will have to fill and submit the FEMA Rugged Based Requirements Matrix(Section J :Attachment: 3) to demonstrate compliance.

The final version of the FEMA Rugged Based Requirement Matrix shall be submitted as required in Section M.

Every other shall in the solicitation or in this document will have to be met, however only the numbered shall’s (“shall(#)”) will be in the Rugged

Based Requirements Matrix (Section J :Attachment: 3).

Instructions:

Section

Number and Title

FEMA Requirement:

(“shall(#)”).

FEMA Requirement compliance

Description Location FEMA acceptance

Column 1: Section number and title

The “Section” Colum indicates the section number and title of a requirement in the Rugged Based FEMA requirements (Section J : Attachment 2)

Column 2: FEMA requirements

The “FEMA Requirement” would have to be filled out with the numbered Requirements from the Rugged Based Requirements (Section J: Attachment 2)

Column 3: FEMA Requirement compliance

The manufacturer is required to state for each FEMA requirement in Column number 2 if the manufacturer met the requirement(Exceeded/Yes/No/)

Column 4: Description

The manufacturer is required to provide a description to demonstrate of the FEMA Requirement ( shalls). This should not be restating the requirements(shalls), but if not a detailed explanation and/or description on show the vendor Exceeded/Met/ Not met

Column 5: Location

The manufacturer has to indicate where in the Proposal the manufacturer shows compliance and/or demonstrate what is stated in the description

Column 6: FEMA Acceptance

FEMA indicate if the vendor met the requirement

Example: NOTIONAL DATA, Just to provide guidance

Section

Number and

Title

FEMA Requirement:

FEMA Requirement compliance

5.2

“ABC”

Final dimensions shall

(18) be proposed by manufacturer, but not to exceed fourteen feet

(14’) (box width)

3 bed room Yes The manufactured home design width is 13’.

Refer to Drawings in Tab “X” and

Page “X” of the proposal that shows that the exterior dimensions are 13 feet box width that the exterior dimensions are

13 feet box width

Yes

2 bed room N/A

1 bedroom N/A

FEMA Rugged Based Performance Requirements Matrix

Section FEMA Requirement:

FEMA

Requirement compliance

1.1 shall(#) “insert text” 3 bed room

2 bed room

1 bedroom

1.1 shall(#) “insert text” 3 bed room

2 bed room

1 bedroom shall(#) “insert text” 3 bed room

2 bed room

1 bedroom

O3 shall(#) “insert text” 3 bed room

2 bed room

1 bedroom