HSCGG1-17-Q-PRV005-AMENDMENT_0003.pdf
PDF 128 KB Posted
- Solicitation number
- HSCGG1-17-Q-PRV005
About this file
Solicitation Amendment 0003
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
HSCGG1-17-Q-PRV005
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
11/15/2016
4. REQUISITION/PURCHASE REQ. NO.
21-17-G17PRV005
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
Contracting Officer CEU Providence 475 Kilvert Street, Suite 100 West Warwick, RI 02893
Sean E. Waldron Contract Specialist 401-736-1721
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
THIS AMENDMENT MUST BE
ACKNOWLEDGED WITH YOUR BID
9A. AMENDMENT OF SOLICITATION NO.
HSCGG1-17-Q-PRV005
9B. DATED (SEE ITEM 11)
10/19/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The solicitation referenced in block 9A above is hereby amended as follows:
Page 2 provides clarifications, additions and deletions to be incorporated into the Specification document “PSN 8436907 REPAIR HVAC CONTROLS – MULTI-MISSION BUILDING”.
Reference documents (pdf files) are also uploaded to www.fbo.gov as part of this Amendment.
The quote due date remains unchanged at November 22, 2016 by 4:00 PM local time, Warwick, RI.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
DANIEL WALKER, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
11/15/2016
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA http://www.fbo.gov/
HSCGG1-17-Q-PRV005
Amendment 0003 STA Jones Beach – Repair HVAC Controls MMB
11/15/2016
1. CLARIFICATION. Refer to the Project Manual Table of Contents at REFERENCE MATERIALS:
(a) Delete the words “The following information is provided electronically on a DVD.” and replace with “The following information is provided electronically in Adobe (PDF) file format. The numbers to identify the paragraphs below correlate to the “R#” included in the file name of the files issued.”
(b) At paragraph 5. Photographs, add the words “Photographs taken by the government will be made available to the successful bidder after award. Bidders are encouraged to visit the site in advance of submitting a bid to become familiar with the project requirements and general project site conditions.”
2. CLARIFICATION. Refer to Spec Section 01 11 00 GENERAL REQUIREMENTS
(a) At paragraph 1.5.5 Radiation Control Valves. Delete all words between “...Drawing M-7 sheet 8 of 8." and the end of the paragraph.
(b) At paragraph 1.7 CONTINUITY OF SERVICE, delete the last sentence.
(c) At paragraph 1.8 PRE- PROPOSAL MEETING, delete the 6 lines of this paragraph and replace with “Not required.”
(d) At paragraph 1.9 DEFINITIONS, ACRONYMN[S], AND ABBREVIATIONS, delete paragraphs (i) Design-Build (D-B), (j)Design-Build Firm (DBF) and (k) Designer of Record.
(e) Delete paragraph 1.10 REFERENCE MATERIALS
3. REFERENCE DOCUMENTS
o R1A P03-27-83 6 M series Dwgs o R1B P03-27-83 9 P & E series Dwgs o R1C P03-27-83 12 A & S series Dwgs o R1D P03-27-83 13 G & C Series Dwgs o R2 P01-P9454AllDwgs o R3 P627965SPC o R4 P3809133D01
| 2016-11-15T12:11:37-0500 | |
| WALKER.DANIEL.B.1033312390 | |
| I am approving this document |
File details come from the government source that posted it. Updated .