REMODEL BATHROOMS MMB – USCG STATION GLOUCESTER
PROJECT SPECIFICATIONS
GLOUCESTER, MASSACHUSETTS
PROJECT NO. 5220362
Prepared for:
United States Coast Guard - Civil Engineering Unit Providence
Prepared by:
MICHAEL BAKER INTERNATIONAL, ROCKY HILL, CT
February 11, 2016
REMODEL BATHROOMS MMB-USCG STATION GLOUCESTER
GLOUCESTER, MASSACHUSETTS
PSN 5220362
THIS PAGE INTENTIONALLY LEFT BLANK
TABLE OF CONTENTS 000110 - 1
TABLE OF CONTENTS - SPECIFICATIONS
Division 00 - Procurement and Contracting Requirements 003126 Existing Hazardous Material Information
Division 01 – General Requirements 011100 Summary of Work 011400 Work Restrictions 013200 Construction Schedule 013300 Submittal Procedures 013301 Submittal Register 013529 Safety & Occupational Health 015000 Temporary Facilities 015719 Temporary Environmental Controls 017700 Closeout Procedures 017823 Operations & Maintenance Data
Division 02 – Existing Conditions 024119 Selective Demolition
Division 06 – Wood, Plastics and Composites 061000 Rough Carpentry
Division 07 – Thermal and Moisture Protection 079200 Joint Sealants
Division 09 – Finishes 092300 Gypsum Plastering 093013 Ceramic Tiling 096500 Resilient Base 099123 Interior Painting
Division 10 – Specialties 102113 Toilet Compartments 102800 Toilet, Bath and Laundry Accessories
Division 12 – Furnishings 123530 Residential Casework
Division 22 - Plumbing 22 04 00 General Conditions for Plumbing Trades 22 05 00 Common Work Results for Plumbing 22 05 03 Pipes and Tubes for Plumbing Piping and Equipment 22 05 23 General-Duty Valves for Plumbing Piping 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 07 00 Plumbing Insulation 22 40 00 Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning 230400 General Conditions for Mechanical Trades
TABLE OF CONTENTS 000110 - 2
230500 Common Work Results for HVAC 230513 Common Motor Requirements for HVAC Equipment 230529 Hangers and Supports for HVAC Piping and Equipment 230593 Testing Adjusting and Balancing for HVAC 233400 HVAC Fans 233700 Air Outlets and Inlets
Division 26 – Electrical 260400 General Conditions for Electrical Trades 260519 Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceways and Boxes for Electrical Systems 260553 Identification for Electrical Systems 260923 Lighting Control Devices 262726 Wiring Devices 262819 Enclosed Switches 265100 Interior Lighting
Division 28 - Electronic Safety and Security 283100 Fire Detection and Alarm
END OF TABLE OF CONTENTS
EXISTING HAZARDOUS MATERIAL INFORMATION 003126 - 1
DOCUMENT 003126 - EXISTING HAZARDOUS MATERIAL INFORMATION
1.1 EXISTING HAZARDOUS MATERIAL INFORMATION
A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.
B. An existing inspection report for hazardous materials including asbestos-containing materials (ACM) has been prepared by Michael Baker International dated August 6, 2015 is available for viewing as appended to this Document.
C. Based upon the scope of work within the existing utility room 106, no asbestos-containing material is to be removed.
END OF DOCUMENT 003126
We Make a Difference
August 6, 2015
Mr. Joshua Tessier
United States Coast Guard Civil Engineering Unit Providence (CEU)
475 Kilvert Street, Suite 100
Warwick, RI 02886
Re: Asbestos Building Inspection
Multi-Mission Building
17 Harbor Loop
Gloucester, MA 01930
Dear Mr. Tessier:
I am pleased to provide you with this letter report which details the environmental sampling services that
Michael Baker Jr. Inc. (Baker) has recently provided for your department.
SCOPE OF WORK
Baker was requested to conduct a limited hazardous material inspection for the presence of asbestos-containing materials (ACM), lead-containing paint (LCP), mold, and other hazardous materials within the USCG building, namely the Multi-Mission Building, at 17 Harbor Loop, in Gloucester, Massachusetts. The purpose of the inspection was to meet the requirements of the United States Environmental Protection Agency
(USEPA), State of Massachusetts - Department of Labor Standards, and the National Emission Standards for
Hazardous Air Pollutants (NESHAP) standards. The NESHAP standard (40 CFR, Part 61) requires that an asbestos inspection be conducted prior to renovation/demolition activities of any structure or dwelling. The building plans are shown on the Figures.
FIELD VISIT INVESTIGATION
The survey was conducted on June 25, 2015 by a Massachusetts-licensed Asbestos Building Inspector (Gary
R. Case - License Number AI900625). The Baker field inspector identified eleven (11) suspected building materials from the building. The bulk material samples were collected and analyzed for the presence of asbestos. Samples were submitted using chain-of-custody documentation to EMSL Analytical, Inc. in
Cinnaminson, New Jersey. EMSL is accredited by the American Industrial Hygiene Association (AIHA) and the U.S. National Institute of Standards and Technology, under the National Voluntary Laboratory
Accreditation Program (NIST/NVLAP) for bulk material analysis for asbestos. The bulk asbestos samples were analyzed by Polarized Light Microscopy (PLM), United States Environmental Protection Agency
(USEPA) Method for Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116 (7/93
Edition). Table 1 presents the specific information for all of the building components that were sampled as suspected ACM.
The Baker field personnel also reviewed and identified the suspected painted building components with the building. While no bulk paint samples were collected, general observations of the condition and locations of the paint were documented to assist with the potential renovation/repair project. Table 2 presents the specific information for the lead paint.
August 6, 2015 We Make a Difference
Mr. William G. Shepherd
During the field work, Baker inspected the building for the presence of mold and potential problem areas.
While no sampling was collected, general observations of the condition of the building were documented to assist with the potential renovation/repair project. Table 3 presents the specific information on the potential for mold.
Baker also observed and recorded data for all of the potential hazardous materials found in the building. Data that was recorded includes: material locations, material descriptions, number of containers, and container sizes.
Baker was not required to review or gather safety data sheets (SDSs) or to identify individual compounds within the products.
FINDINGS AND RECOMMENDATIONS
Asbestos
As for the building materials recorded in Table 1, the laboratory analyses of the material samples indicated that two (2) of the sampled materials contained asbestos greater than the USEPA criteria level of 1% asbestos by weight and/or in accordance with NESHAP regulations. The final laboratory analytical report for these samples is submitted to confirm this determination and is contained in Attachment I.
The laboratory analysis of the two materials, Thermal Pipe Fitting Insulation (Materials Numbers 04 and 05), were originally reported to contain <1% Chrysotile asbestos. According to NESHAP, materials that are found to contain less than 10% by polarized light microscopy (PLM) analysis must also be assumed to be ACM, unless they are re-analyzed by point count methods and it is demonstrated that the material contains <1% asbestos. These materials were re-analyzed by PLM point count methods, and the results were reported to be
<0.25% to 0.75% Chrysotile asbestos. This material is not considered to be asbestos-containing.
Thus, the ACM is listed below:
1.) Material #03 – Floor Tile Adhesive (564 square feet)
2.) Material #06 – Vinyl Floor Tile with Floor Tile Adhesive (8,000 square feet)
While this material can be managed in-place with little potential hazard, due to the proposed renovation project, all of the ACM that will be impacted or disturbed should be properly removed and disposed of, accordingly, by an asbestos abatement firm that is licensed by the state of Massachusetts. Abatement plans for the regulated ACM should be designed in accordance with USEPA and other federal, state, and local regulations and/or using appropriate guidelines by an Asbestos Project Designer and reviewed by a Certified
Industrial Hygienist. All abatement activities should be overseen and managed by an experienced and licensed
Asbestos Supervisor. Removal notifications, activities, and disposal must be completed in accordance with
USEPA (40 CFR Part 61), OSHA (29 CFR 1926.1101), and Massachusetts (310 CMR 7.15) regulations, as well as other applicable federal, state, and local regulations. Attachment II contains photographs of the building and the asbestos-containing material.
August 6, 2015 We Make a Difference
Mr. William G. Shepherd
Disclaimer
The information that is presented in this report reflects the conditions that were observed in the building(s) during the time frame this inspection was conducted. Although every effort was made to identify the potential suspect building materials and components, there is no guarantee that additional building materials in these damaged buildings are not present. Conditions may exist in the building(s), such that inaccessible materials may only become apparent during demolition activities. If any hidden, suspicious material is encountered, it is recommended that the material be analyzed to confirm its asbestos content.
Lead Paint Based upon the age of the building and previous information, all of the painted materials should be identified as lead-containing paint (LCP). While there is no abatement of paint planned, the Contractor should be aware of the lead-containing paint during the renovation activities, so that proper safety worker procedures can be performed. The requirements of the Occupational Safety and Health Administration (OSHA) Construction Standards need to be invoked if any metal content is present in the paint that may be affected by renovation activities. OSHA does not provide a minimum concentration criteria level for these metals; however, it requires precautions and protection for workers and the working environment be taken at any work place where an exposure to airborne metals may occur. The Contractor shall be responsible to perform work according to all applicable federal, state, and local laws.
Mold
Based upon the investigation of the building, no areas of mold were discovered or identified within the building. No further actions are needed.
Other Hazardous Materials As for the other hazardous materials, three (3) different types of materials were identified in the building, including fluorescent light tubes, fluorescent light ballasts, and mercury thermometers. In general, most of the containers of hazardous materials appeared to be in good condition, and no leakage was observed.
Should you have any questions regarding this report, please do not hesitate to contact me at
(412) 269-6381.
Sincerely, MICHAEL BAKER JR., INC.
Gary R. Case
Project Manager
Attachment(s)
Michael Baker Jr., Inc.
FIGURES
TABLES
TABLE 1
ASBESTOS SURVEY MATERIAL SUMMARY
STATION GLOUCESTER
Homogeneous
Material
Number
Material
Type
Material
Description
Material
Locations Friable Sample Numbers Sample Results
Sample
Locations
Asbestos-
Containing
Material
Approximate
Quantity of
Asbestos
Condition of
Material
01 No 0415-SG-01A (SC) None Detected Room 3 No Not Applicable
0415-SG-01A (BC) None Detected Room 3
0415-SG-01B (SC) None Detected Room 9
0415-SG-01B (BC) None Detected Room 9
0415-SG-01C (SC) None Detected Room 23
0415-SG-01C (BC) None Detected Room 23
0415-SG-01D (SC) None Detected Room 30
0415-SG-01D (BC) None Detected Room 30
0415-SG-01E (SC) None Detected Room 39
0415-SG-01E (BC) None Detected Room 39
0415-SG-01F (SC) None Detected Room 42
0415-SG-01F (BC) None Detected Room 42
0415-SG-01G (SC) None Detected Room 58
0415-SG-01G (BC) None Detected Room 58
Not ApplicableWall and
Ceiling
Plaster
White Rooms 1, 2, 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 54, 55, 56, 57, 58, 59, and 60
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by
NESHAP, contains less than 10% asbestos is considered positive, unless re-analyzed by PLM point count.
STATION GLOUCESTER
Homogeneous
Material
Number
Material
Type
Material
Description
Material
Locations Friable Sample Numbers Sample Results
Sample
Locations
Asbestos-
Containing
Material
Approximate
Quantity of
Asbestos
Condition of
Material
Not ApplicableWall and
Ceiling
Plaster
White Rooms 1, 2, 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 54, 55, 56, 57, 58, 59, and 60
02 No 0415-SG-02A None Detected Room 6 No Not Applicable
0415-SG-02B None Detected Room 33
0415-SG-02C None Detected Room 54
03 No 0415-SG-03A (FT) None Detected Room 3 Yes 564 Square
Feet
No Damage
0415-SG-03A (FA) 2% Chrysotile Room 3
0415-SG-03B (FT) None Detected Room 5
0415-SG-03B (FA) Not Analyzed Room 5
0415-SG-03C (FT) None Detected Room 12
0415-SG-03C (FA) Not Analyzed Room 12
Wall and
Ceiling Board with Joint
Compound
Vinyl Floor
Tile with
Floor
Adhesive
12" x 12"
Gray Mottled
Vinyl Floor
Tile with
Black Floor
Adhesive
Rooms 3, 4, 5, 6, and 12
White Rooms 1, 2, 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 54, 55, 56, 57, 58, 59, and 60
Not Applicable
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by
NESHAP, contains less than 10% asbestos is considered positive, unless re-analyzed by PLM point count.
STATION GLOUCESTER
Homogeneous
Material
Number
Material
Type
Material
Description
Material
Locations Friable Sample Numbers Sample Results
Sample
Locations
Asbestos-
Containing
Material
Approximate
Quantity of
Asbestos
Condition of
Material
Not ApplicableWall and
Ceiling
Plaster
White Rooms 1, 2, 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 54, 55, 56, 57, 58, 59, and 60
04 Yes 0415-SG-04A <1% Chrysotile Room 6 No Not Applicable Not Applicable
*0415-SG-04A *<0.25% Chrysotile
0415-SG-04B <1% Chrysotile Room 6
*0415-SG-04B *<0.25% Chrysotile
0415-SG-04C None Detected Room 6
*0415-SG-04C *None Detected
05 Yes 0415-SG-05A <1% Chrysotile Room 2 No Not Applicable Not Applicable
*0415-SG-05A *0.25% Chrysotile
0415-SG-05B <1% Chrysotile Room 2
*0415-SG-05B *0.75 Chrysotile
0415-SG-05C <1% Chrysotile Room 6
*0415-SG-05C *<0.25% Chrysotile
Thermal Pipe
Fitting
Insulation
1" Hard
White
Insulaiton on
1" Line
Thermal Pipe
Fitting
Insulation
1" Hard
White
Insulation on
3" Line
Room 6
*PLM Point Count
Rooms 2 and 6
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by
NESHAP, contains less than 10% asbestos is considered positive, unless re-analyzed by PLM point count.
STATION GLOUCESTER
Homogeneous
Material
Number
Material
Type
Material
Description
Material
Locations Friable Sample Numbers Sample Results
Sample
Locations
Asbestos-
Containing
Material
Approximate
Quantity of
Asbestos
Condition of
Material
Not ApplicableWall and
Ceiling
Plaster
White Rooms 1, 2, 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 54, 55, 56, 57, 58, 59, and 60
06 0415-SG-06A (FT) 2% Chrysotile Room 1 Yes 8,000 Square
Feet
0415-SG-06A (AD) 7% Chrysotile Room 1
0415-SG-06B (FT) Not Analyzed Room 29
0415-SG-06B (AD) Not Analyzed Room 29
0415-SG-06C (FT) Not Analyzed Room 57
0415-SG-06C (AD) Not Analyzed Room 57
07 Yes 0415-SG-07A None Detected Room 9 No Not Applicable Not Applicable
0415-SG-07B None Detected Room 18
0415-SG-07C None Detected Room 20
No DamageNoRooms 1, 8, 9, 11, 15, 17, 19, 26, 28, 29, 31, 35, 36, 38, 39, 40, 42, 43, 44, 46, 48, 49, 51, 52, 55, 56, 57, 58, and 61
Ceiling Tile Rooms 1, 9, 10, 18, 20, and 26
2' x 2' Square
Style
Vinyl Floor
Tile with
Floor
Adhesive
12" x 12"
White/Black
Vinyl Floor
Tile and
Black Floor
Adhesive
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by
NESHAP, contains less than 10% asbestos is considered positive, unless re-analyzed by PLM point count.
STATION GLOUCESTER
Homogeneous
Material
Number
Material
Type
Material
Description
Material
Locations Friable Sample Numbers Sample Results
Sample
Locations
Asbestos-
Containing
Material
Approximate
Quantity of
Asbestos
Condition of
Material
Not ApplicableWall and
Ceiling
Plaster
White Rooms 1, 2, 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 54, 55, 56, 57, 58, 59, and 60
08 No 0415-SG-08A (CB) None Detected Room 3 No Not Applicable Not Applicable
0415-SG-08A (YAD) None Detected Room 3
0415-SG-08A (BAD) None Detected Room 3
0415-SG-08B (CB) None Detected Room 31
0415-SG-08B (YAD) None Detected Room 31
0415-SG-08B (BAD) None Detected Room 31
0415-SG-08C (CB) None Detected Room 52
0415-SG-08C (YAD) None Detected Room 52
0415-SG-08C (BAD) None Detected Room 52
09 Yes 0415-SG-09A None Detected Room 7 No Not Applicable Not Applicable
0415-SG-09B None Detected Room 38
0415-SG-09C None Detected Room 55
Cove Base Yellow/Tan under 4" Vinyl
Cove Base
Rooms 3, 4, 5, 6, 8, 9, 12, 19, 29, 31, 34, 35, 36, 38, 40, 41, 43, 44, 46, 48, 49, 51, 52, 55, 56, 57, and 58
Ceiling Tile 2' x 4'
Fissured, Pinhole
Rooms 7, 8, 12, 13, 14, 29, 31, 34, 38, 39, 40, 42, 43, 48, 51, 52, 55, 57, and
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by
NESHAP, contains less than 10% asbestos is considered positive, unless re-analyzed by PLM point count.
STATION GLOUCESTER
Homogeneous
Material
Number
Material
Type
Material
Description
Material
Locations Friable Sample Numbers Sample Results
Sample
Locations
Asbestos-
Containing
Material
Approximate
Quantity of
Asbestos
Condition of
Material
Not ApplicableWall and
Ceiling
Plaster
White Rooms 1, 2, 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 54, 55, 56, 57, 58, 59, and 60
10 Yes 0415-SG-10A None Detected Room 23 No Not Applicable Not Applicable
0415-SG-10B None Detected Room 23
0415-SG-10C None Detected Room 24
11 No 0415-SG-11A (FT) None Detected Room 34 No Not Applicable Not Applicable
0415-SG-11A (AD) None Detected Room 34
0415-SG-11B (FT) None Detected Room 34
0415-SG-11B (AD) None Detected Room 34
0415-SG-11C (FT) None Detected Room 34
0415-SG-11C (AD) None Detected Room 34
Ceiling Tile 2' x 2'
Fissured, Pinhole
Rooms 23 and
Vinyl Floor
Tile with
Floor
Adhesive
12" x 12"
White, Mottled Vinyl
Floor Tile with
Yellow Floor
Adhesive
Room 34
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by
NESHAP, contains less than 10% asbestos is considered positive, unless re-analyzed by PLM point count.
TABLE 2
LEAD PAINT
STATION GLOUCESTER
Component Locations Color Substrate Condition Findings Recommendations
If impacted by renovation, proper removal is needed.
* The requirements of the Occupational Safety and Health Administration (OSHA) Construction Standards need to be invoked if any metal content is present in the paint that may be affected by renovation activities. OSHA does not provide a minimum concentration criteria level for lead; however, it requires precautions and protection for workers and the working environment be taken at any work place where an exposure to airborne metals may occur.
All painted components Interior and Exterior - - - - - - - - -
All paint contains at least a trace of lead and must be addressed according to OSHA requirements.
TABLE 3
MOLD TESTING
STATION GLOUCESTER
Sample Number Sample Locations Sample
Results Findings Recommendations
No mold problems were identified within this building. No Further Actions Needed
No samples were collected.
ATTACHMENT I
EMSL Analytical, Inc.
200 Route 130 North Cinnaminson, NJ 08077
Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
BAKE51
041519379EMSL Order ID:
Customer ID:
Customer PO:
Project ID:
Attn:
Proj: Station Gloucester
Phone: (412) 269-6300
Fax: (412) 375-3996
Collected: 6/24/2015
Received: 7/02/2015
Analyzed: 7/18/2015
Gary Case
Michael Baker, Jr. Inc.
100 Airside Drive
Moon Township, PA 15108
Summary Test Report for Asbestos Analysis of Bulk Material via EPA 600/R-93/116 Method via
Polarized Light Microscopy Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00010615-SG-01A-Skim Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 100%PLM White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0001A0615-SG-01A-Base Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 100%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00020615-SG-01B-Skim Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 100%PLM White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0002A0615-SG-01B-Base Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 100%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00030615-SG-01C-Skim Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 100%PLM White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0003A0615-SG-01C-Base Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 100%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00040615-SG-01D-Skim Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 100%PLM White None Detected
Test Report:EPAMultiTests-7.32.2.D Printed: 7/20/2015 07:01AM Page 1 of 9
Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
BAKE51
041519379EMSL Order ID:
Customer ID:
Customer PO:
Project ID:
Summary Test Report for Asbestos Analysis of Bulk Material via EPA 600/R-93/116 Method via
Polarized Light Microscopy Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0004A0615-SG-01D-Base Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 100%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00050615-SG-01E-Skim Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0005A0615-SG-01E-Base Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00060615-SG-01F-Skim Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0006A0615-SG-01F-Base Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00070615-SG-01G-Skim Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0007A0615-SG-01G-Base Coat
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00080615-SG-02A
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 15% 85%PLM White None Detected
Test Report:EPAMultiTests-7.32.2.D Printed: 7/20/2015 07:01AM Page 2 of 9
Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
BAKE51
041519379EMSL Order ID:
Customer ID:
Customer PO:
Project ID:
Summary Test Report for Asbestos Analysis of Bulk Material via EPA 600/R-93/116 Method via
Polarized Light Microscopy Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00090615-SG-02B
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 15% 85%PLM White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00100615-SG-02C
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 10% 90%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00110615-SG-03A-Floor Tile
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 100%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0011A0615-SG-03A-Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 98% 2% ChrysotilePLM Black
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00120615-SG-03B-Floor Tile
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 100%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0012A0615-SG-03B-Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015PLM Stop Positive (Not Analyzed)
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00130615-SG-03C-Floor Tile
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0013A0615-SG-03C-Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015PLM Stop Positive (Not Analyzed)
Test Report:EPAMultiTests-7.32.2.D Printed: 7/20/2015 07:01AM Page 3 of 9
Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
BAKE51
041519379EMSL Order ID:
Customer ID:
Customer PO:
Project ID:
Summary Test Report for Asbestos Analysis of Bulk Material via EPA 600/R-93/116 Method via
Polarized Light Microscopy Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00140615-SG-04A
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 30% 70% <1% ChrysotilePLM White
7/17/2015 30% 70% <0.25% Chrysotile400 PLM Pt Ct White
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00150615-SG-04B
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 30% 70% <1% ChrysotilePLM White
7/17/2015 30% 70% <0.25% Chrysotile400 PLM Pt Ct White
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00160615-SG-04C
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 40% 60%PLM Gray None Detected
7/18/2015 35% 65%400 PLM Pt Ct None DetectedGray
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00170615-SG-05A
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 30% 70% <1% ChrysotilePLM White
7/18/2015 35% 64.75% 0.25% Chrysotile400 PLM Pt Ct White
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00180615-SG-05B
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 30% 70% <1% ChrysotilePLM Gray
7/18/2015 30% 69.25% 0.75% Chrysotile400 PLM Pt Ct Gray
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00190615-SG-05C
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 30% 70% <1% ChrysotilePLM Gray/White
7/18/2015 30% 70% <0.25% Chrysotile400 PLM Pt Ct Gray/White
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00200615-SG-06A-Floor Tile
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 98% 2% ChrysotilePLM Gray
Test Report:EPAMultiTests-7.32.2.D Printed: 7/20/2015 07:01AM Page 4 of 9
Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
BAKE51
041519379EMSL Order ID:
Customer ID:
Customer PO:
Project ID:
Summary Test Report for Asbestos Analysis of Bulk Material via EPA 600/R-93/116 Method via
Polarized Light Microscopy Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0020A0615-SG-06A-Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015 0% 93% 7% ChrysotilePLM Black
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00210615-SG-06B-Floor Tile
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015PLM Stop Positive (Not Analyzed)
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0021A0615-SG-06B-Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015PLM Stop Positive (Not Analyzed)
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00220615-SG-06C-Floor Tile
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015PLM Stop Positive (Not Analyzed)
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0022A0615-SG-06C-Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/07/2015PLM Stop Positive (Not Analyzed)
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00230615-SG-07A
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 90% 10%PLM Gray/White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00240615-SG-07B
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 90% 10%PLM Gray/White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00250615-SG-07C
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 80% 20%PLM Gray None Detected
Test Report:EPAMultiTests-7.32.2.D Printed: 7/20/2015 07:01AM Page 5 of 9
Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
BAKE51
041519379EMSL Order ID:
Customer ID:
Customer PO:
Project ID:
Summary Test Report for Asbestos Analysis of Bulk Material via EPA 600/R-93/116 Method via
Polarized Light Microscopy Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00260615-SG-08A-Cove Base
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Purple None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0026A0615-SG-08A-Yellow Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Yellow None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0026B0615-SG-08A-Brown Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Brown None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00270615-SG-08B-Cove Base
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Purple None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0027A0615-SG-08B-Yellow Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Yellow None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0027B0615-SG-08B-Brown Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Brown None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00280615-SG-08C-Cove Base
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Brown None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0028A0615-SG-08C-Yellow Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Yellow None Detected
Test Report:EPAMultiTests-7.32.2.D Printed: 7/20/2015 07:01AM Page 6 of 9
Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
BAKE51
041519379EMSL Order ID:
Customer ID:
Customer PO:
Project ID:
Summary Test Report for Asbestos Analysis of Bulk Material via EPA 600/R-93/116 Method via
Polarized Light Microscopy Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0028B0615-SG-08C-Brown Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Brown None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00290615-SG-09A
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 90% 10%PLM Gray/White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00300615-SG-09B
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 90% 10%PLM Gray/White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00310615-SG-09C
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 80% 20%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00320615-SG-10A
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 85% 15%PLM Gray/White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00330615-SG-10B
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 80% 20%PLM Gray/White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00340615-SG-10C
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 90% 10%PLM Gray None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00350615-SG-11A-Floor Tile
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM White None Detected
Test Report:EPAMultiTests-7.32.2.D Printed: 7/20/2015 07:01AM Page 7 of 9
Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
BAKE51
041519379EMSL Order ID:
Customer ID:
Customer PO:
Project ID:
Summary Test Report for Asbestos Analysis of Bulk Material via EPA 600/R-93/116 Method via
Polarized Light Microscopy Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0035A0615-SG-11A-Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Yellow None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00360615-SG-11B-Floor Tile
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0036A0615-SG-11B-Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Yellow None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-00370615-SG-11C-Floor Tile
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM White None Detected
Client Sample ID:
Sample Description:
Lab Sample ID: 041519379-0037A0615-SG-11C-Mastic
DateTEST Non-Fibrous Asbestos CommentColor Fibrous
Non-AsbestosAnalyzed
7/08/2015 0% 100%PLM Yellow None Detected
Test Report:EPAMultiTests-7.32.2.D Printed: 7/20/2015 07:01AM Page 8 of 9
Phone/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com
BAKE51
041519379EMSL Order ID:
Customer ID:
Customer PO:
Project ID:
Summary Test Report for Asbestos Analysis of Bulk Material via EPA 600/R-93/116 Method via
Polarized Light Microscopy
Analyst(s):
PLM (26)Adam Gart
PLM (8)Brett Poulton
PLM (19)Daniel Fricker
400 PLM Pt Ct (4)Felix Anusiem
400 PLM Pt Ct (2)Jillian Yurick
Benjamin Ellis, Laboratory Manager or Other Approved Signatory
Reviewed and approved by:
EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. This test report must not be used to claim product endorsement by NVLAP or any agency of the U.S.
Government. EMSL bears no responsibility for sample collection activities or analytical method limitations. The laboratory is not responsible for the accuracy of results when requested to physically separate and analyze layered samples. PLM alone is not consistently reliable in detecting asbestos in floor coverings and similar NOBs
Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA-LAP, LLC-IHLAP Lab 100194, NYS ELAP
10872, NJ DEP 03036
Report amended: 07/20/201507:01:27 Replaces initial report from: 07/08/201517:44:28 Reason Code: Client-Additional Analysis
Test Report:EPAMultiTests-7.32.2.D Printed: 7/20/2015 07:01AM Page 9 of 9
ATTACHMENT II
MICHAEL BAKER INTERNATIONAL, LLC – PHOTOGRAPHIC RECORD
PARCEL IDENTIFICATION: Station Gloucester – United States Coast Guard
PHOTOGRAPH
PHOTOGRAPHS
BY
Baker
Comments: Front of Building
Comments: Material 03 - Floor Tile Adhesive (Black) under 12” x 12” Gray Mottled Vinyl Floor Tile
MICHAEL BAKER INTERNATIONAL, LLC – PHOTOGRAPHIC RECORD
PARCEL IDENTIFICATION: Station Gloucester – United States Coast Guard
Comments: Material 06 – 12” x 12” White/Black Vinyl Floor Tile with Black Floor Adhesive
SUMMARY OF WORK 011100 - 1
SECTION 011100 – SUMMARY OF WORK 08/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
MILITARY SPECIFICATIONS (MIL)
MIL-I-16165 (Rev. E) Shielding Harness, Shielding Items and Shielding
Enclosures for use in Reduction of Interference from Engine Electrical Systems
MILITARY STANDARDS (MIL-STS)
MIL-STD-461E (Rev. D) Control of Electromagnetic Interference Emissions and Susceptibility
MIL-STD-462 (Rev. D) Electromagnetic Interference Characteristics
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes improvements to the existing Coast Guard Station Gloucester facility located at 17 Harbor Loop, Gloucester, Massachusetts 01930 and incidental related work as indicated in the contract plans, including but not limited to the following:
Addition electrical facility grounding on 1st Floor Renovation of three (3) bathrooms on 2nd Floor Renovation of four (4) bathrooms on 3rd Floor Within each Bathroom:
Replacement of all Plumbing fixtures Replacement or repair of Floor, Ceiling and Walls finishes Replacement of Lighting Replacement of Exhaust Fan Replacement of Vanity and Medicine Cabinets
1.2.2 Location
The work shall be located at the USCG Station Gloucester, 17 Harbor Loop, and Gloucester, Massachusetts 01930, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
SUMMARY OF WORK 011100 - 2
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.4 SUPERVISION
Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.
1.5 PRECONSTRUCTION CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule prices, shop drawings, and other submittals, scheduling programming, and prosecution of the work. Major subcontractors who will engage in the work shall also attend.
1.6 INSPECTION
The Contractor shall keep the Contracting Officer or duly appointed representative fully informed of contract operations and plans so that a representative may arrange to be present at various times that work is being performed.
1.6.1 CONTRACTOR’S DAILY LOG
The Contractor shall be complete the USCG Daily Log form at the end of each working day and deliver it to the Government Inspector. The Government Inspector will attest to its accuracy by initialing the form and forwarding that form to CEU Providence. The form will be provided to the Contractor by the Contracting Officer’s Representative.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
END OF SECTION 011100
WORK RESTRICTIONS 011400 - 1
SECTION 01 14 00 – WORK RESTRUCTIONS 02/10
1.1 CONTRACTOR ACCESS AND USE OF PREMISES
1.1.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall be conspicuously marked for identification.
The Contractor shall condense all work affecting use of the basement exercise equipment by personnel to a single period of no more than 3 weeks. During the work period, the Contractor shall provide dust covers or protective enclosures to protect existing exercise equipment in the basement. Before and after this work period, the Contractor shall make the basement exercise room available and accessible to personnel at all times. Furthermore, the Contractor shall maintain one means of access through the building (or directly from the basement to the outside), and shall take all necessary precautions to protect personnel from safety and environmental hazards related to the construction. No contract work shall be performed in the basement during this time.
1.1.2 Working Hours
Regular working hours shall consist of an 8 1/2 hour period established by the Contracting Officer Monday through Friday, excluding Government holidays.
1.1.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.1.4 Occupied and Existing Buildings
The Contractor shall be working in an existing building which will be unoccupied, but will contain furnishings, finishes and equipment to remain.
The existing buildings and their contents shall be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the basement, 1st and 2nd floors during the construction period.
WORK RESTRICTIONS 011400 - 2
Relocate movable furniture approximately 6 feet away from the Contractor's working area or as required to perform the work, protect the furniture, and replace the furniture in its original locations upon completion of the work. Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall equipment at the completion of the work.
The Government will remove and relocate other Government property in the areas of the building scheduled to receive work.
1.1.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, gas service, heating and fire alarm shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours.”
d. Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.2 SECURITY REQUIREMENTS
1.2.1 Areas Not Covered by Contract
Not Used
1.2.2 Parking
Prohibited on any piers and waterfront areas. Do not park on or block the marked fire lanes at any time. Vehicles may stop on the piers or waterfront areas for 15 minutes for loading and unloading. An exception may be made for vehicles which are part of the equipment needed to do the required work and are attached or connected to the pier of ship; for example, a truck which uses a mounted generator or a vehicle with built-in equipment.
PART 3 EXECUTION
END OF SECTION 011400
CONSTRUCTION SCHEDULE 013200 - 1
SECTION 013200 - CONSTRUCTION SCHEDULE/SCHEDULE OF VALUES 02/10
1.1 SUBMITTALS
Submit the following in accordance with Section 01 33 00, "Submittal Procedures."
SD-01 Preconstruction Submittals
Construction Schedule Schedule of Values
1.2 CONSTRUCTION SCHEDULE/SCHEDULE OF VALUES
At the Pre-Construction Conference, submit a Construction Schedule and Schedule of Values in accordance with FAR Clause 52.236.15. The Schedule of Values shall be based on the actual breakdown of the bid price. The cost of insurance shall not be listed as a separate item but included as part of each item of work. The actual cost of bonds may be paid as the first progress payment when a receipt from the bonding company is presented to the Contracting Officer. For contracts under $25,000, a Schedule of Values is not required. In addition, keep the Government Inspector informed daily of the expected delivery dates for major pieces of equipment and materials.
The Construction Schedule shall clearly indicate the start and completion dates of major work components. The Schedule of Values shall clearly indicate unit value of all major work components.
The Construction Schedule shall incorporate at a minimum the following activities:
a. Mobilization
b. Demobilization
c. Pre-Construction Submittals
d. Work Activities
e. In-Progress Submittals
f. Final Government Inspection
g. Close-Out Submittals; i.e. Testing Balancing Reports, Warranties, Operation and Maintenance Manuals, Posted Instructions
h. As-Built Drawings
i. Factors which Constitute Potential Interruptions to Station Operations
Pre-Construction Submittals are those activities which encompass the obtaining, submission, review and approval of submittals necessary prior to the start of the related site work. Contractor shall annotate all such activities into the progress schedule with their forecasted time periods. These activity periods shall not be exclusive of the contract performance period. No site work shall commence until the respective submittals have been approved.
The value of all major work components within the project shall be identified on the Schedule of Values on a unit quantity and unit cost basis, e.g. number of squares and cost per square of roofing, number of lineal feet and cost per lineal foot of conduit, number of panels and cost per panel etc.
Lump sum items shall only be paid for when 100% complete. Do not include mobilization and demobilization line items on the Schedule of Values.
CONSTRUCTION SCHEDULE 013200 - 2
The Construction Schedule and Schedule of Values as approved by the Government is not a substitute for quantities conveyed by the specification and drawings and those required for a complete job. Omissions and errors on the Construction Schedule and Schedule of Values are the responsibility of the Contractor.
Payments will not be made until the schedule of prices has been submitted to and approved by the Contracting Officer.
1.3 UPDATED SCHEDULES
Update the construction schedule and equipment delivery schedule at monthly intervals or when schedule has been revised. Reflect any changes occurring since the last update. Submit copies of the purchase orders and confirmation of the delivery dates as directed.
PART 3 EXECUTION
3.1 PROGRESS UPDATES
3.1.1 General
A revised Construction Schedule/Schedule of Values shall be issued by the Contractor on a monthly basis. In addition, any revisions to the Construction Schedule/Schedule of Values such as modifications or delays shall be reflected by Contractor submission of an updated Construction Schedule/Schedule of Values.
3.1.2 Modifications
When a modification is issued by the Government, record the modification as the last activity of the Construction Schedule and Schedule of Values and include the value of the modification. Adjust the Schedule of Values to reflect the inclusion of the modification. Revise the Construction Schedule portion of the form to annotate the progress change.