Specifications Section 07 19 00 Water Repellents
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSN (01-04342) ANT Bristol Waterfront Repairs
SECTION 07 19 00
WATER REPELLENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 501.1 (2005) Standard Test Method for Water Penetration of Windows, Curtain Walls and Doors Using Dynamic Pressure
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 259 (2002; R 2012) Standard Method of Test for Resistance of Concrete to Chloride Ion Penetration
AASHTO T 260 (1997; R 2011) Standard Method of Test for Sampling and Testing for Chloride Ion in Concrete and Concrete Raw Materials
ASTM INTERNATIONAL (ASTM)
ASTM C140/C140M (2013a) Standard Test Methods for Sampling and Testing Concrete Masonry Units and Related Units
ASTM C672/C672M (2012) Scaling Resistance of Concrete Surfaces Exposed to Deicing Chemicals
ASTM D1653 (2013) Water Vapor Transmission of Organic Coating Films
ASTM D2369 (2010; E 2011) Volatile Content of Coatings
ASTM D3278 (1996; R 2011) Flash Point of Liquids by Small Scale Closed-Cup Apparatus
ASTM E514/E514M (2011) Standard Test Method for Water Penetration and Leakage Through Masonry
ASTM E96/E96M (2013) Standard Test Methods for Water Vapor Transmission of Materials
ASTM G154 (2012a) Standard Practice for Operating Fluorescent Light Apparatus for UV Exposure of Nonmetallic Materials
SECTION 07 19 00 Page 1
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1000 Air Contaminants
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Water repellents
SD-06 Test Reports
Water absorption
Accelerated weathering
Resistance to chloride ion penetration
Moisture vapor transmission
Scaling resistance
Water Penetration and Leakage
SD-07 Certificates
Manufacturer's qualifications
Applicator's qualifications
Evidence of acceptable variation
Warranty
SD-08 Manufacturer's Instructions
Application instructions
Provide manufacturer's instructions including preparation, application, recommended equipment to be used, safety measures, and protection of completed application.
Manufacturer's material safety data sheets
1.3 QUALITY ASSURANCE
1.3.1 Qualifications
a. Manufacturer's qualifications: Minimum five years record of successful in-service experience of water repellent treatments manufactured for concrete application.
b. Applicator's qualifications: Minimum five years successful experience in projects of similar scope using specified or similar treatment
SECTION 07 19 00 Page 2 materials and manufacturer's approval for application.
1.3.2 Performance Requirements
a. Water absorption: ASTM C140/C140M. Comparison of treated and untreated specimens.
b. Moisture vapor transmission: ASTM E96/E96M. Comparison of treated and untreated specimens.
c. Water penetration and leakage through masonry: ASTM E514/E514M.
1.3.3 Evidence of Acceptable Variation
If a product proposed for use does not conform to requirements of the referenced specification, submit for approval to the Contracting Officer, evidence that the proposed product is either equal to or better than the product specified. Include the following:
a. Identification of the proposed substitution;
b. Reason why the substitution is necessary;
c. A comparative analysis of the specified product and the proposed substitution, including tabulations of the composition of pigment and vehicle;
d. The difference between the specified product and the proposed substitution; and
e. Other information necessary for an accurate comparison of the proposed substitution and the specified product.
1.4 SAMPLE TEST PANEL
The approved Sample Test Panel will serve as the standard of quality for all other water repellent coating work. Do not proceed with application until the sample panel has been approved by the Contracting Officer.
1.4.1 Sample Test Panel
Prior to commencing work, including bulk purchase and delivery of material, apply water repellent treatment to a minimum 4 feet wide by 4 feet long area of existing concrete deck as a test panel.
1.4.1.1 Testing
Provide field water testing of water repellent treated surfaces in the presence of the Contracting Officer and the water repellent treatment manufacturer's representative for review of water repellency, concrete discoloration, and non-skid characteristics.
a. Apply water repellent to entire test panel.
b. After completion of application of treatment, test mock-up with 5/8 inch garden hose, with spray nozzle, located 10 feet from surface. After water has run continuously for a proved amount of time, observe test panel surface for water repellency, concrete discoloration, and non-skid characteristics.
SECTION 07 19 00 Page 3
c. Coordinate testing procedures and modify project treatment application as required to pass test panel tests.
1.4.1.2 Approval
Proceed with water repellent treatment work only after completion of field test application and approval of mock-up and tests by the Contracting Officer.
1.5 REGULATORY REQUIREMENTS
1.5.1 Environmental Protection
In addition to requirements specified in Section 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS for environmental protection, notify the Contracting Officer of any water repellent coating specified herein which fails to conform to the local Air Quality Management District Rules at the location of the Project.
1.6 DELIVERY, STORAGE, AND HANDLING
Deliver materials in original sealed containers, clearly marked with the manufacturer's name, brand name, type of material, batch number, percent solids by weight and volume, and date of manufacturer. Store materials off the ground, in a dry area where the temperature will be not less 40 degrees F nor more than 95 degrees F.
1.7 SAFETY METHODS
Apply coating materials using safety methods and equipment in accordance with Section 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS, and the following:
1.7.1 Toxic Materials
To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
a. The coating manufacturer when using solvents or other chemicals. Use impermeable gloves, chemical goggles or face shield, and other recommended protective clothing and equipment to avoid exposure of skin, eyes, and respiratory system. Conduct work in a manner to minimize exposure of building occupants and the general public.
b. 29 CFR 1910.1000.
c. Threshold Limit Values (R) of the American Conference of Governmental Industrial Hygienists.
d. Manufacturer's material safety data sheets.
1.8 ENVIRONMENTAL CONDITIONS
1.8.1 Weather and Substrate Conditions
Do not proceed with application of water repellents under any of the following conditions, except with written recommendations of manufacturer.
SECTION 07 19 00 Page 4
a. Ambient temperature is less than 40 degrees F or above 100 degrees F.
b. Substrate faces have cured less than one month.
c. Rain or temperature below 40 degrees F or above 100 degrees Fare predicted for a period of 24 hours before or after treatment.
d. Earlier than three days after surfaces are wet.
e. Substrate is frozen or surface temperature is less than 40 degrees F and falling.
1.8.2 Moisture Condition
Determine moisture content of substrate meets manufacturer's requirements prior to application of water repellent material.
1.9 SEQUENCING AND SCHEDULING
1.9.1 Concrete Surfaces
Do not start water repellent coating until all patching, pointing and cleaning operations have been completed and concrete has cured a minimum of 30 days under normal weather conditions.
1.9.2 Sealants
Do not apply water repellents until the sealants for joints adjacent to surfaces receiving water repellent treatment have been installed and cured.
a. Water repellent work may precede sealant application only if sealant adhesion and compatibility have been tested and verified using substrate, water repellent, and sealant materials identical to those used in the work.
b. Provide manufacturers' test results of compatibility.
1.10 INSPECTIONS
Notify the manufacturer's representative a minimum of 72 hours prior to scheduled application of water repellents for field inspection. Inspect surfaces and obtain approval in writing from the manufacturer's representative prior to any application of any water repellent coating.
1.11 SURFACES TO BE COATED
Coat the entire deck as shown in the construction drawings.
1.12 WARRANTY
Provide a warranty, issued jointly by the manufacturer and the applicator of the water repellent treatment against moisture penetration through the treated structurally sound surface for a period of five years. Warranty to provide the material, labor, and equipment necessary to remedy the problem. At the satisfactory completion of the work, complete the warranty sign, notarize, and submit to the Contracting Officer.
SECTION 07 19 00 Page 5
PART 2 PRODUCTS
2.1 MATERIALS
Water repellent solution shall be a clear, non-yellowing, deep-penetrating, VOC compliant solution. Material shall not stain or discolor and shall produce a mechanical and chemical interlocking bond with the substrate to the depth of the penetration.
2.2 WATER REPELLENTS
2.2.1 Silane, 85 Percent Solids or Greater
Penetrating water repellent. A monomeric compound containing 85 percent or greater isobutyltrimethoxysilane or alkyltrialkoxysilanes with alcohol, mineral spirits, or water.
a. Composition: Isobutyltrimethoxysilane or modified alkylalkoxysilane.
b. Active alkylalkoxysilane content: ASTM D2369 20 percent by weight, plus or minus 1 percent.
c. Appearance: White, milky liquid.
d. Average depth of penetration: Up to 3/8 inch depending on substrate.
e. VOC content: Less than 350 grams per liter.
f. Flash point, ASTM D3278.
g. Specific gravity, at 78 degrees F: 0.90 to 0.98.
h. Density: 8.0 to 8.2 pounds per gallon.
2.3 PERFORMANCE CRITERIA
2.3.1 Silane, 85 Percent Solids or Greater
a. Average depth of penetration: 3/8 inches depending on substrate.
b. Resistance to chloride ion penetration, AASHTO T 259 and AASHTO T 260.
c. Water absorption test, ASTM E514/E514M: 0.42 percent per 48 hours; 1.2 percent per 50 days.
d. Moisture vapor transmission: ASTM D1653, 28.33 perms or 51.61 percent maximum compared to untreated surfaces.
e. Scaling resistance, ASTM C672/C672M, non-air-entrained concrete: Zero rating, no scaling, 100 cycles treated concrete.
f. Resistance to accelerated weathering, ASTM G154. Testing 2,500 hours:
No loss in repellency.
g. Drying time under normal conditions: Four hours per 75 degrees F.
SECTION 07 19 00 Page 6
PART 3 EXECUTION
3.1 EXAMINATION
Examine concrete surfaces to be treated to ensure that:
a. All visible cracks, voids or holes have been repaired.
b. Concrete surfaces are free of form release agents, curing compounds and other compounds that would prevent full penetration of the water repellent material.
Do not start water repellent treatment work until all deficiencies have been corrected, examined and found acceptable to the Contracting Officer and the water repellent treatment manufacturer. Do not apply treatment to damp, dirty, dusty or otherwise unsuitable surfaces. Comply with the manufacturer's recommendations for suitability of surface.
3.2 PREPARATION
3.2.1 Surface Preparation
Prepare substrates in accordance with water repellent treatment manufacturer's recommendation. Clean surfaces of dust, dirt, efflorescence, alkaline, and foreign matter detrimental to proper application of water repellent treatment.
3.2.2 Protection
Provide masking or protective covering for materials which could be damaged by water repellent treatment.
a. Protect glass, glazed products, and prefinished products from contact with water repellent treatment.
b. Protect landscape materials with breathing type drop cloths: plastic covers are not acceptable.
3.2.3 Compatibility
a. Confirm treatment compatibility with each type of joint sealer within or adjacent to surfaces receiving water repellent treatment in accordance with manufacturer's recommendations.
b. When recommended by joint sealer manufacturer, apply treatment after application and cure of joint sealers. Coordinate treatment with joint sealers.
c. Mask surfaces indicated to receive joint sealers which would be adversely affected by water repellent treatment where treatment must be applied prior to application of joint sealers.
3.3 MIXING
Mix water repellent material thoroughly in accordance with the manufacturer's recommendations. Mix, in quantities required for that days work, all containers prior to application. Mix each container the same length of time.
SECTION 07 19 00 Page 7
3.4 APPLICATION
In strict accordance with the manufacturers written requirements. Do not start application without the manufacturer's representative being present or his written acceptance of the surface to be treated.
3.4.1 Water Repellent Treatment
3.4.1.1 Spray Application
Spray apply water repellent material to exterior concrete surfaces using low-pressure airless spray equipment in strict accordance with manufacturer's printed application, instructions, and precautions.
Maintain copies at the job site. Apply flood coat in an overlapping pattern allowing approximately 8 to 10 inch rundown on the vertical surface. Maintain a wet edge at all overlaps, both vertical and horizontal. Hold gun maximum 18 inches from surface.
3.4.1.2 Brush or Roller Application
Brush or roller apply water repellent material only at locations where overspray would affect adjacent materials and where not practical for spray applications.
3.4.1.3 Rate of Application
Apply materials to exterior surfaces at the coverages recommended by the manufacturer and as determined from sample panel test. Increase or decrease application rates depending upon the surface texture and porosity of the substrate so as to achieve even appearance and total water repellency.
3.4.1.4 Number of Coats
The sample panel test shall determine the number of coats required to achieve full coverage and protection.
3.4.1.5 Appearance
If unevenness in appearance, lines of work termination or scaffold lines exist, or detectable changes from the approved sample panel occur, the Contracting Officer may require additional treatment at no additional cost to the Government. Apply any required additional treatment to a natural break off point.
3.5 CLEANING
Clean all runs, drips, and overspray from adjacent surfaces while the water repellent treatment is still wet in a manner recommended by the manufacturer.
3.6 FIELD QUALITY CONTROL
Do not remove drums containing water repellent material from the job site until completion of all water repellent treatment and until so authorized by the Contracting Officer.
3.6.1 Field Testing
AAMA 501.1. At a time not less than twenty days after completion of the
SECTION 07 19 00 Page 8 water repellent coating application, subject a representative wall area of the building to the Navy Hose Stream Field Test similar to AAMA 501.1 hose test to simulated rainfall for a period of three hours. Use a minimum 5/8 inch diameter hose and a fixed lawn sprinkler spray head which will direct a full flow of water against the wall. Place the sprinkler head so that the water will strike the wall downward at a 45 degree angle to the wall.
If the inside of the wall shows any trace of moisture during or following the test, apply another coat of water repellent, at the manufacturer's recommended coverage rate to the entire building. Repeat testing and re-coating process until no moisture shows on the inside wall face.
Accomplish any required work retesting and re-coating at no additional cost to the Government.
3.6.2 Site Inspection
Inspect treatment in progress by manufacturer's representative to verify compliance with manufacturer instructions and recommendations.
-- End of Section --