AMENDMENT 02

QUESTIONS AND ANSWERS

Repair Waterfront at USCG ANT Bristol

HSCGG1-14-B-PRV218

PSN: 01P04321

4 August 2014

1. Are wave screen repairs and timber bracing included in the base bid?

Response: Yes

2. The timbers shown on drawing S-103 highlighted in red, are they the only timbers to be replaced?

Response: No. See note 3 on S-103, 50% of the blue highlighted timbers and 100% of the red are to be replaced

3. Is there a grading requirement for the timbers to be replaced?

Response: Yes, see Specification section 06 13 33

4. Is there a requirement for timber treatment?

Response: Yes, see Specification section 06 13 33

5. Would a turbidity curtain be acceptable to contain floating debris?

Response: Yes

6. Is there a junction box or electrical source available to connect the new hazardous material storage building or buildings?

Response: Yes, the new lockers should be powered from the existing circuit that powers the existing sheds.

7. What are the tightly packed grout bags shown on detail A2 on drawing S-506?

Response: Grout bags are bags of fast setting grout designed for underwater placement.

8. What permits apply to this work?

Response: We have no environmental permits required for this work.