AMENDMENT 02
QUESTIONS AND ANSWERS
Repair Waterfront at USCG ANT Bristol
HSCGG1-14-B-PRV218
PSN: 01P04321
4 August 2014
1. Are wave screen repairs and timber bracing included in the base bid?
Response: Yes
2. The timbers shown on drawing S-103 highlighted in red, are they the only timbers to be replaced?
Response: No. See note 3 on S-103, 50% of the blue highlighted timbers and 100% of the red are to be replaced
3. Is there a grading requirement for the timbers to be replaced?
Response: Yes, see Specification section 06 13 33
4. Is there a requirement for timber treatment?
Response: Yes, see Specification section 06 13 33
5. Would a turbidity curtain be acceptable to contain floating debris?
Response: Yes
6. Is there a junction box or electrical source available to connect the new hazardous material storage building or buildings?
Response: Yes, the new lockers should be powered from the existing circuit that powers the existing sheds.
7. What are the tightly packed grout bags shown on detail A2 on drawing S-506?
Response: Grout bags are bags of fast setting grout designed for underwater placement.
8. What permits apply to this work?
Response: We have no environmental permits required for this work.