Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0002 May 26, 2017 4985469
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE Contracting Officer USCG CEU Oakland 1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203
Same as Block 6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
ALL PROSPECTIVE BIDDERS
X HSCG88-17-R-PQQ091
9B. DATE (SEE ITEM 11)
May 4, 2017
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide responses to questions from prospective bidders:
QUESTION: (1)While the Scope of Repairs notes that the Secretary of Interior Treatment Standards require that rust and paint be removed by “…the least abrasive way possible…”, the specifications require that it be removed via conventional, high-pressure abrasive blasting. Considering the specification requirements, shall the Bidders assume that we may ignore the Secretary of Interior Treatment Standards?
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JASON DUGAN
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
Request for Proposal Number HSCG88-17-R-PQQ091 Amendment 0002 May 26, 2107
RESPONSE: No, Secretary of Interior Standards will apply. Per Lighthouse Preservation Handbook, Part IV. B, Page 21 allows low-pressure grit blasting using blast pressures not to exceed 100 pounds per square inch to minimize damage to iron substrate. The goal is to remove all rust to SSPC SP 10/NACE 2 near-white surface prep standard without using high-pressure blasting.
QUESTION: (2)Our experience indicates that once rust and paint are removed via the specified means (ie.
conventional, high-pressure abrasive blasting, in accordance with SSPC SP 10 / NACE No. 2, that such surface cleaning / preparation, will expose considerably more damage to the existing structure, than may be observed prior to said treatment. Additionally, assuming that the damage is repaired, whether via installation of an epoxy-based composite as called for on the drawings, welding or replacement, that the substrate will no longer meet the requirements of SSPC SP 10 / NACE No. 2, due to the formation of rust on the unprotected surface. As such, the surface will require re-blasting, in order to restore it to cited standard. Is it your intent that the surface be abrasive blasted twice? Also, how will the Contractor be compensated for those repairs, which are not quantifiable prior to the initial abrasive blasting? Will the time for completion be extended, should additional repair work be required?
RESPONSE: Section 05 50 13 Metal Fabrications para 3.07A indicates 'unprotected in-place metalwork must be primed immediately to prevent flash rusting" and as follows "Prior to field erection rust preventative coating must be removed". An allowance should be included in your bid for additional flash rusting protection and removal.