Amendment_0001.pdf

PDF 69 KB Posted

Attached to
USCGC MUNRO (WMSL 755) Post Shakedown Availability #2 DS FY18 FQ2
Solicitation number
HSCG85-17-R-P45K73
Issued by

About this file

Amendment 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0001 06SEP17 21-17-857P45K73

6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE

COMMANDER, USCG

Surface Forces Logistics Center – Contract & Procurement Division 1301 Clay Street, Suite 807N Oakland, CA 94612

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.

TO ALL PROSPECTIVE OFFERORS

HSCG85-17-R-P45K73

X 9B. DATE (SEE ITEM 11)

11 AUG 2017

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SUBJECT: Solicitation No. HSCG85-17-R-P45K73, USCGC MUNRO (WMSL 755) Post Shakedown Availability #2 Dockside Repairs FY18 FQ2

See Continuation Page

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

Solicitation No. HSCG85-17-R-P45K73 CGC MUNRO (WMSL 755) PSA2 Dockside Repairs FY18 FQ2 Amendment No. 0001

The purpose of this amendment is as follows:

1. To address the following clarification questions

D-04, Para 3.1.2; 3.5 (Water Mist Fire Extinguishing System, Inspect & Test) Q: System tech rep states that “dry” inspection was conducted on system in July time-frame and requests clarification if intent is to conduct “wet or dry” inspection?

A: A “wet” inspection is required for the purposes of this work item.

D-08, References; Para 3.5 (Overhead Light Fixture, Modify) Q: Reference paragraph lists WMSL SHIPALT Drawing 750-WMSL-330-SKT Ref F which was not included on reference CD. 750-WMSL-330-509 was included but sheet numbering does match up with directions given in paragraph 3.5. Is this reference available?

A: The reference is available. Please see attached.

D-08, Para 1.1;3.5 (Overhead Light Fixture, Modify) Q: Intent paragraph states that there are seven (07) compartments being modified while paragraph 3.5 states to conduct modifications in twenty-four (24) compartments listed in table 2 (which only lists 7 spaces). Please clarify tht there are only 7 spaces or if there are additional spaces to be Modified.

A: Paragraph 3.5 is in error. There are only 7 spaces within which modifications will take place.

D-12, Para 1.2 (Sea Painter Boom, Replace) Q: Is the Sea Painter Boom line provided as GFM as part of the boom equipment or is the contractor to fabricate and provide this item?

A: A Sea painter line is not provided as GFE with the Boom. The plan is to utilize the current Sea Painter line the cutter uses as the sea painter.

D-08, Para 3.5.1.1 (Overhead Light Fixture, Modify) Q: Replace one existing FPS220-2CAI overhead lights with one Pauluhn fluorescent fixtures FPS320EM-2CAI or equal as depicted on sheet 15 of Coast Guard Drawing 750-WMSL-330-SKT and labeled 004-010. Indicating multiple lights and fixtures vice one overhead light. Sheet 15 shows 4 fixtures being replaced. Is it the intent to replace just 1 fixture labeled 004-010?

A: The intent is to only replace as identified in the spec.

D-08, Para 3.5.6.1 (Overhead Light Fixture, Modify)

Amendment No. 0001 Q: Paragraph 3.5.6.1 states to Replace one FPS220EM-2CAI overhead fixtures in the passageway with one FPS320EMRV-2CAI light fixtures or equal as identified on sheet 32B of Coast Guard Drawing 750-WMSL-330-SKT and located above the DC repair locker labeled 002-012, indicating multiple assemblies vice one. Sheet 32B shows 4 fixtures as replaced. Is it the intent to replace just 1 fixture labeled 002-012?

A: Replace one as per specification.

D-08, Para 3.3 (Overhead Light Fixture, Modify) Q: Paragraph 3.3 has 13 fixtures for removal and reuse, spec. only has a single light fixture being removed in paragraph 3.5.1.1 and paragraph 3.5.6.1. Are the additional 11 fixtures to be part of this work item? If so please provide detailed information regarding type and location of fixtures are to be removed and type and location where fixtures are being reinstalled.

A: Removal and replacement of fixtures listed on the table are shown in 750 WMSL 330 SKT

REV F.

D-08, Para 3.5.2.1 (Overhead Light Fixture, Modify) Q: Paragraph 3.5.2.1 references sheet 14B of CG dwg 750-WMSL-330-SKT, provided dwg has no sheet 14B.

A: SEE REV F OF 750 WMSL 330 SKT

D-08, Para 3.5.3.1 (Overhead Light Fixture, Modify) Q: Paragraph 3.5.3.1 installs one FPS320EM-2CAI fixture, GFP only provides one these fixtures and that is used in paragraph 3.5.1.1, is contractor to provide additional FPS320EM-2CAI?

A: KTR shall supply other fixture (s) as CFM

D-08, Para 3.5.4.1 (Overhead Light Fixture, Modify) Q: Paragraph 3.5.4.1 installs four FR320CPR-ASI fixtures, are these the fixtures shown in the GFP material list identified as Pauluhn ProRec Meridian FR/MI (FR220J)? If not is contractor to provide four FR320CPR-ASI fixtures?

A: use GFP provided. Refer to sheet 26 of 750 WMSL 330 SKT for verification of dimensions

D-08, Para 3.5.5.1 (Overhead Light Fixture, Modify) Q: Paragraph 3.5.5.1 only tasks contractor with replacing 4 terminal box with a 10 terminal box in Rescue Station, provided dwg does not show this. Table 2 notes “lights shall switch from white to blue when the door is opened from the compartment”. Table 3 states “lights shall switch from white to NVD Green A when the door is opened from the compartment”. Please clarify intent and provide information on incorporating 10 terminal box (wiring schematic) and any other materials

Amendment No. 0001 such as cabling or different type/additional fixtures required that necessitate a 10 terminal box here.

A: Refer to REV F of 750 WMSL 330 SKT for both terminal box schematic as well as the correct color.

D-08, Para 3.5.6.1 (Overhead Light Fixture, Modify) Q: Paragraph 3.5.6.1 installs one FPS320EMRV-2CAI, is this to be provided by contractor?

A: Refer to REV F of 750 WMSL 330 SKT, sheet 32B. KTR shall supply fixture if not provided in GFP table.

The solicitation closing date is NOT extended due to this amendment. Receipt of proposals are still due no later than 12SEPT17 @ 1400 Pacific time.

SF 30 (0001)
Page 2 - 0001