WEDGE_(WLR_75307)_DD_FQ4_AMH_17ER0_BLANK.xls
XLS spreadsheet 38 KB Posted
- Attached to
- DRY DOCK REPAIRS FOR CGC WEDGE AND BARGE
- Solicitation number
- HSCG85-17-Q-P45B85
About this file
Contractor's Quote
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF_30_CGC_WEDGE_AMENDMENT.pdf | ||
| SF_30_CGC_WEDGE_AMENDMENT_4-17-2017.pdf | ||
| Attachment_4_Request_for_Clarification_WEDGE.doc | DOC document | |
| WEDGE_(WLR_75307)_DD_FQ4_AMH_17R0.pdf | ||
| Attachment_5_-_WEDGE-_USCG_Ombudsman_Notice.doc | DOC document | |
| CGC_WEDGE_FY2017_combined_synopsis-solicitation-29MAR2017.pdf | ||
| Attachment_3_Past_Performance_Information_Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC WEDGE (WLR-75D) DRYDOCK AVAILABILITY FY2017 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect- Tender | JOB | 1 | $0.00 | |
| D-002 | Hull Plating (U/W Body), Inspect - Barge | JOB | 1 | $0.00 | |
| D-003 | Hull Plating (U/W Body), Ultrasonic Testing - Tender | JOB | 1 | $0.00 | |
| D-004 | Appendages (U/W), Leak Test - Tender | JOB | 1 | $0.00 | |
| D-005 | Appendages (U/W), Leak Test - Barge | JOB | 1 | $0.00 | |
| O-006 | Appendages (U/W) - Internal, Preserve - Tender | JOB | 1 | $0.00 | |
| O-007 | Appendages (U/W) - Internal, Preserve - Barge | JOB | 1 | $0.00 | |
| D-008 | Propulsion Shaft Bearings (External), Check Clearances | JOB | 1 | $0.00 | |
| O-009 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | $0.00 | |
| D-010 | Fathometer Transducer, Renew – Tender | JOB | 1 | $0.00 | |
| D-011 | Fathometer Transducer, Renew – Barge | JOB | 1 | $0.00 | |
| D-012 | Capstan, Inspect and Service - Barge | JOB | 1 | $0.00 | |
| D-013 | Spuds, Overhaul - Tender | JOB | 1 | $0.00 | |
| D-014 | Spuds, Overhaul - Barge | JOB | 1 | $0.00 | |
| D-015 | Spud Wells, Preserve - Tender | JOB | 1 | $0.00 | |
| D-016 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $0.00 | |
| D-017 | U/W Body, Preserve (100%) - Tender | JOB | 1 | $0.00 | |
| D-018 | U/W Body, Preserve (100%) - Barge | JOB | 1 | $0.00 | |
| D-019 | Cathodic Protection / Zinc Anodes, Renew - Tender | JOB | 1 | $0.00 | |
| D-020 | Cathodic Protection / Zinc Anodes, Renew - Barge | JOB | 1 | $0.00 | |
| D-021 | Drydock - Tender | JOB | 1 | $0.00 | |
| D-022 | Drydock - Barge | JOB | 1 | $0.00 | |
| D-023 | Temporary Services, Provide - Tender | JOB | 1 | $0.00 | |
| D-024 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-025 | Boat Davit Winch, Shrink Wrap | JOB | 1 | $0.00 | |
| D-026 | Buoy and Cargo Handling Crane, Shrink Wrap | JOB | 1 | $0.00 | |
| D-027 | Spud Wells, Preserve - Barge | JOB | 1 | $0.00 | |
| D-028 | Tanks (Potable Water), Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| O-029 | Tanks (Potable Water), Preserve “100%” - Tender | JOB | 1 | $0.00 | |
| D-030 | Tanks (Potable Water), Preserve “Partial” - Tender | JOB | 1 | $0.00 | |
| D-031 | Tanks (MP Fuel Service), Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| D-032 | Tanks (MP Fuel Service), Clean and Inspect - Barge | JOB | 1 | $0.00 | |
| D-033 | Keel Coolers, Clean, Inspect and Hydro | JOB | 1 | $0.00 | |
| D-034 | Rudder Assembly; Remove, Inspect And Reinstall | JOB | 1 | $0.00 | |
| D-035 | Rudder(s), Preserve (“100%”) | JOB | 1 | $0.00 | |
| D-036 | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-037 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-038 | Propulsion Shaft Seals, Mechanical & Inflatable, Overhaul And Renew | JOB | 1 | $0.00 | |
| D-039 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-040 | Keel Coolers, Clean, Inspect and Hydro - Barge | JOB | 1 | $0.00 | |
| D-041 | Barge Fuel Oil Tank Sounding Tube Brackets, Install | JOB | 1 | $0.00 | |
| D-042 | Hull Plating, Repair | JOB | 1 | $0.00 | |
| D-043 | Internal Structural Members, Repair | JOB | 1 | $0.00 | |
| D-044 | Potable Water Tank (2-35-0-W), Weld Repairs | JOB | 1 | $0.00 | |
| D-045 | Various System Piping and Components, Renew | JOB | 1 | $0.00 | |
| D-046 | Hull Plating (U/W Body), Ultrasonic Testing - Barge | JOB | 1 | $0.00 | |
| O-047 | Propeller, Perform Minor Repairs and Reconditioning | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | $45.00 | Hour | 920 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $500.00 | JOB | $0.00 | |
| O-00Z | Laydays | $500.00 | Day | 5 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(2/17/2017) Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 1 | 62 | Baltimore, MD | ||||||||||||||||||||||
| 1 | 52 | Biloxi, MS | ||||||||||||||||||||||
| 1 | 56 | Boston, MA | ||||||||||||||||||||||
| 1 | 50 | Charleston, SC | ||||||||||||||||||||||
| 1 | 60 | Corpus Christi, TX | ||||||||||||||||||||||
| O-006 | 1 | 51 | Hampton Roads | |||||||||||||||||||||
| O-007 | 1 | 64 | Honolulu, HI | |||||||||||||||||||||
| Propulsion Shaft Bearings (External), Check Clearances | 1 | 55 | Houston, TX | |||||||||||||||||||||
| O-009 | 1 | 56 | Los Angeles, CA | |||||||||||||||||||||
| 1 | 55 | Median Rate | ||||||||||||||||||||||
| 1 | 49 | Miami | ||||||||||||||||||||||
| 1 | 50 | Narragansett Bay, RI | ||||||||||||||||||||||
| 1 | 55 | New London, CN | ||||||||||||||||||||||
| 1 | 45 | New Orleans | ||||||||||||||||||||||
| 1 | 62 | NYNY | ||||||||||||||||||||||
| 1 | 49 | Panama City, FL | ||||||||||||||||||||||
| 1 | 60 | Philadelphia, PA | ||||||||||||||||||||||
| 1 | 51 | Portland, ME | ||||||||||||||||||||||
| 1 | 57 | Portland, OR | ||||||||||||||||||||||
| 1 | 55 | San Diego, CA | ||||||||||||||||||||||
| 1 | 67 | San Francisco, CA | ||||||||||||||||||||||
| 1 | 55 | Santa Barbara, CA | ||||||||||||||||||||||
| 1 | 55 | SE North Carolina | ||||||||||||||||||||||
| 1 | 65 | Seattle, WA | ||||||||||||||||||||||
| 1 | 48 | Tampa-St. Petersburg | ||||||||||||||||||||||
| 1 | 60 | Wilmington, DE | ||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| O-029 | 1 | |||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| Propulsion Shaft Seals, Mechanical & Inflatable, Overhaul And Renew | 1 | |||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| 1 | ||||||||||||||||||||||||
| Hull Plating (U/W Body), Ultrasonic Testing - Barge | 1 | |||||||||||||||||||||||
| O-047 | 1 | |||||||||||||||||||||||
| $ 45.00 | 920 | |||||||||||||||||||||||
| $ 500.00 |
&C(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate