MARIA_BRAY_Question_3.docx
DOCX document 15 KB Posted
- Solicitation number
- HSCG85-17-Q-P45020
About this file
Question Answer 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MARIA_BRAY_Question_1.docx | DOCX document | |
| Amendment_1 _MARIA_BRAY.pdf | ||
| MARIA_BRAY_Question_2.docx | DOCX document | |
| MARIA_BRAY _Attachment_4_Request_for_Clarification.docx | DOCX document | |
| MARIA_BRAY _Attachment_3_Past_Performance_Information_Form.doc | DOC document | |
| MARIA_BRAY _Attachment_1 _Line_Item_Pricing_Schedule.xls | XLS spreadsheet | |
| MARIA_BRAY_Combined_Synopsis_Solicitation_1_Nov.docx | DOCX document | |
| MARIA_BRAY_DD _Specification.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR CLARIFICATION
Question No: 3
DRYDOCK REPAIRS FOR USCGC MARIA BRAY
| RFQ Number: | HSCG85-17-Q-P45020 | |
| SOLICITATION SECTION: | PARA NO. | |
| DEFINITE/OPTION ITEM NO. | 75 | PARA NO. 3.3 |
| TITLE: | HYDRAULIC OIL SUPPLY AND RTURN PIPING, REPAIR |
QUESTION:
Item specifies CuNi piping material for the repairs, however, the referenced drawing indicates that the piping is carbon steel. Please clarify the material required.
RESPONSE: Carbon steel instead of CuNi piping.