MARIA_BRAY_DD _Specification.doc
DOC document 3 MB Posted
- Solicitation number
- HSCG85-17-Q-P45020
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MARIA_BRAY_Question_3.docx | DOCX document | |
| MARIA_BRAY_Question_1.docx | DOCX document | |
| Amendment_1 _MARIA_BRAY.pdf | ||
| MARIA_BRAY_Question_2.docx | DOCX document | |
| MARIA_BRAY _Attachment_4_Request_for_Clarification.docx | DOCX document | |
| MARIA_BRAY _Attachment_3_Past_Performance_Information_Form.doc | DOC document | |
| MARIA_BRAY _Attachment_1 _Line_Item_Pricing_Schedule.xls | XLS spreadsheet | |
| MARIA_BRAY_Combined_Synopsis_Solicitation_1_Nov.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC MARIA BRAY (WLM 562)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2016
Developed By: Jonathan C Copley (Rev-0, 29 September 2016)
TABLE OF CONTENTS
ivRevisions Record vConsolidated List of References xiConsolidated List of Government-furnished Property xiiiConsolidated List of Critical Inspection Items xvPrincipal Characteristics - TENDER
1General Requirements
11WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing
15WORK ITEM 2: Hull Plating (U/W Body), Inspect
19WORK ITEM 3: Hull Plating (Freeboard), Ultrasonic Testing
22WORK ITEM 4: Hull and Structural Plating (General) -10.2-Pound Steel, Renew
24WORK ITEM 5: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew
26WORK ITEM 6: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew
28WORK ITEM 7: Hull And Structural Plating (General) - 20.5-Pound Steel Plate, Renew
30WORK ITEM 8: Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew
32WORK ITEM 9: Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew
34WORK ITEM 10: Appendages (U/W), Leak Test
37WORK ITEM 11: Appendages (U/W) - Internal, Preserve
39WORK ITEM 12: Chain Locker(s), Clean and Inspect
41WORK ITEM 13: Voids (Non-Accessible), Leak Test
44WORK ITEM 14: Voids (Non-Accessible), Internal Surfaces, Preserve
46WORK ITEM 15: Tanks (Potable Water), Clean and Inspect
49WORK ITEM 16: Tanks (Ballast), Clean and Inspect
52WORK ITEM 17: Tanks (Dirty Oil and Waste), Clean and Inspect
55WORK ITEM 18: Hydraulically Operated Cargo Hatch, Inspect and Service
59WORK ITEM 19: Z-Drive Propulsion Units, Overhaul
68WORK ITEM 20: SW Heat Exchangers; Clean, Inspect And Hydro
73WORK ITEM 21: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean
76WORK ITEM 22: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean
80WORK ITEM 23: Fathometer Transducer, Renew
84WORK ITEM 24: Underwater (Speed) Log Transducer(s), Inspect and Service
87WORK ITEM 25: Sea Strainers (All Sizes), Renew
91WORK ITEM 26: Sea Bay, Clean and Inspect
94WORK ITEM 27: Sea Bay, Preserve 100%
96WORK ITEM 28: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift
102WORK ITEM 29: Thruster Unit (General), Overhaul
106WORK ITEM 30: Hydraulic Crossdeck Winches, Inspect and Service
111WORK ITEM 31: Mechanical Chain Stoppers, Inspect and Service
114WORK ITEM 32: Anchor Windlass, Inspect And Service
119WORK ITEM 33: Anchor Chain(s) and Ground Tackle, Inspect and Repair
126WORK ITEM 34: Tanks (Ballast), Preserve “100%”
129WORK ITEM 35: Tanks (Ballast), Preserve “Partial”
132WORK ITEM 36: Chain Locker, Preserve 100%
134WORK ITEM 37: Chain Lockers, Preserve - Partial
136WORK ITEM 38: Tanks (Dirty Oil and Waste), Preserve “100%”
139WORK ITEM 39: Tanks (Dirty Oil and Waste), Preserve “Partial”
142WORK ITEM 40: Decks – Exterior (Buoy or Construction Deck), Preserve 100%
145WORK ITEM 41: U/W Body, Preserve (100%)
149WORK ITEM 42: Hull Plating Freeboard, Preserve “100%”
152WORK ITEM 43: Superstructure, Preserve “100%”
157WORK ITEM 44: Cathodic Protection / Zinc Anodes, Renew
160WORK ITEM 45: Drydock
164WORK ITEM 46: Temporary Services, Provide - Cutter
167WORK ITEM 47: Sea Trial Performance, Support, Provide
171WORK ITEM 48: Tanks (Potable Water), Preserve “100%”
175WORK ITEM 49: Tanks (Potable Water), Preserve “Partial”
179WORK ITEM 50: Compressed Air System Refrigerated Air Dryer, Replacement
188WORK ITEM 51: Machine Shop Structural Repairs
192WORK ITEM 52: Outboard of Sewage Tank, Preservation
196WORK ITEM 53: Deck Covering (Interior Wet/Dry), Renew
198WORK ITEM 54: Deck Covering (Interior Wet/Dry), Renew
200WORK ITEM 55: ATON Shop Bulkhead Repairs
204WORK ITEM 56: Trash Locker Weathertight Door (External), Renew
208WORK ITEM 57: CO and CPO Window Plating, Preserve
211WORK ITEM 58: Auxiliary Seawater Piping, Clean and Flush
215WORK ITEM 59: Heat Pump System, Renew
218WORK ITEM 60: Heat Pump Deck, Preserve
221WORK ITEM 61: Air Handler Drain Pipes, Repair
223WORK ITEM 62: Deck Covering (Interior Wet/Dry), Renew
226WORK ITEM 63: Cargo Hold Deck, Preserve 100%
228WORK ITEM 64: Bilges (Machinery/Non-Machinery), Preserve 100%
231WORK ITEM 65: Bilges (Machinery/Non-Machinery), Preserve Partial
234WORK ITEM 66: EDG Switchboard Deck, Preserve
237WORK ITEM 67: Pump Room and Heat Pump Decks, Preserve
241WORK ITEM 68: Lube Oil Supply and Return Piping, Repair
244WORK ITEM 69: Boat Washdown Station, Renew
247WORK ITEM 70: Firemain System, Cleaning
253WORK ITEM 71: Garbage Grinder Drain, Modification
256WORK ITEM 72: Kickpipe Stuffing Tubes, Renew.
262WORK ITEM 73: TLI FO Sensor, Renew
265WORK ITEM 74: Valves, Overhaul/Renew
269WORK ITEM 75: Hydraulic Oil Supply and Return Piping, Repair
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages
Coast Guard Drawing 175 WLM 130-001, Rev -, Mods to Buoy Deck Incidental to Hawser Pipe Cover Coast Guard Drawing 175 WLM-167-001, Rev L, Structural Closures Coast Guard Drawing 175 WLM 180-004, Rev M, Foundations Hull Block 930 Coast Guard Drawing 175 WLM 184-001, Rev -, V850 Transducer Adapter Ring Coast Guard Drawing 175 WLM 201-001, Rev C, Machinery Spaces Arrangement Coast Guard Drawing 175 WLM 243-002, Rev F, Propulsion Shaft Arrangement Coast Guard Drawing 175 WLM 245-001, Rev A, Propeller Coast Guard Drawing 175 WLM 256-001, Rev J, Seawater Cooling System Diagram Coast Guard Drawing 175 WLM 256-003, Rev D, Seawater Cooling System, Fr 61 Fwd Blocks 910, 920, 930 Coast Guard Drawing 175 WLM 256-004, Rev J, Seawater Cooling System A&D, Hull Blks 940-970
Coast Guard Drawing 175 WLM 256-005, Rev -, Z-Drive Lube Oil Heat Exchanger Tube Bundle, Replacmnt & Piping Mods
Coast Guard Drawing 175 WLM 256-012, Rev B, ASW System Piping Modifications Coast Guard Drawing 175 WLM 256-013, Rev -A, Sea Bay Thermometer Probe Install Coast Guard Drawing 175 WLM 259-001, Rev A, Combustion Exhaust Diagram
Coast Guard Drawing 175 WLM 259-005, Rev C, Combustion Exhaust A&D, Hull Block 970
Coast Guard Drawing 175 WLM 262-001, Rev H, Lube Oil System Diagram Coast Guard Drawing 175 WLM 320-001, Rev AJ, Electrical One-Line Diagram Coast Guard Drawing 175 WLM-422-001, Rev G, Navigation, Signal & Searchlight Block, Isometric and Arrangements Coast Guard Drawing 175 WLM-422-002, Rev F, Navigation, Signal & Searchlight Elementary Wiring Diagram Coast Guard Drawing 175 WLM-437-001, Rev E, Tank Level Indicating System Block, ISO & Elementary Wiring Diagram Coast Guard Drawing 175 WLM 505-003, Rev B, Sea Connection Arrangements
Coast Guard Drawing 175 WLM-506-001, Rev G, Overflows, Air Escapes & Sounding Tubes Diagrams Coast Guard Drawing 175 WLM 512-001, Rev E, HVAC Diagram
Coast Guard Drawing 175 WLM 516-001, Rev F, HVAC Refrigeration System Piping Diagram
Coast Guard Drawing 175 WLM 516-003, Rev D, HVAC Refrigeration System Piping A & D Coast Guard Drawing 175 WLM 516-004, Rev A, HVAC Refrigeration Piping Arr & Details Coast Guard Drawing 175 WLM 521-001, Rev K, Firemain System Diagram Coast Guard Drawing 175 WLM 521-004, Rev F, Firemain System A & D, Hull Block 940/950
Coast Guard Drawing 175 WLM 528-002, Rev H, Weather Deck Drains Diagram Coast Guard Drawing 175 WLM 528-005, Rev -, Modifications to Garbage Grinder Drain Piping
Coast Guard Drawing 175 WLM 533-001, Rev G, Potable Water System Diagram Coast Guard Drawing 175 WLM 533-006, Rev D, Independent Tank Potable Water Hb 950
Coast Guard Drawing 175 WLM 549-001, Rev F, Onboard Lubrication Requirements Coast Guard Drawing 175 WLM 551-001, Rev J, Compressed Air System Diagram
Coast Guard Drawing 175 WLM 551-005, Rev E, Compressed Air System A/D Hull Block 940, 950
Coast Guard Drawing 175 WLM 556-001, Rev L, Hydraulic System Diagram Coast Guard Drawing 175 WLM 561-001, Rev J, Z-Drive Hydraulic System Diagram Coast Guard Drawing 175 WLM 568-001, Rev B, Bow Thruster Arrangement & Detail
Coast Guard Drawing 175 WLM 568-002, Rev K, Bow Thruster Detail Coast Guard Drawing 175 WLM 573-001, Rev U, Buoy Deck Arrangement Coast Guard Drawing 175 WLM 581-001, Rev F, Anchor Handling System Arrgt Coast Guard Drawing 175 WLM 593-009, Rev E, Independent Tanks, Sewage Holding Tank Coast Guard Drawing 175 WLM 601-001, Rev T, General Arrangement Inboard and Outboard Profiles Coast Guard Drawing 175 WLM 601-003, Rev N, Booklet of General Plans Coast Guard Drawing 175 WLM 625-001, Rev K, Windows And Portlights Coast Guard Drawing 175 WLM 631-002, Rev E, Painting Schedule (552 On) Coast Guard Drawing 175 WLM 633-001, Rev D, Cathodic Protection
Coast Guard Drawing 175 WLM 635-001, Rev F, Hull Thermal & Acoustic Insulation Schedule
Coast Guard Drawing 175 WLM 801-001, Rev A, Hull Lines
Coast Guard Drawing 175 WLM 801-003, Rev A, Curves of Form
Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan Coast Guard Drawing 175 WLM 801-015, Rev C, Scantlings, Decks & Platforms Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion Coast Guard Drawing 175 WLM 920-001, Rev K, Hull Block 920 Panels Coast Guard Drawing 175 WLM 920-004, Rev J, H. B. 920 Transverse Frames and Bulkheads
Coast Guard Drawing 175 WLM 930-002, Rev F, Hull Block 930 Modules Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain
Coast Guard Drawing FL 2605-034, Rev C, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1-1/4"
Coast Guard Fleet Drawing FL 2804-012, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-022, Rev-, Consolidated Visual ID for Cutters (Vessels 65 FT And Over In Length)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 3446, Jun 2009, Doppler Speed Log, Model SRD-500 Dual Axis
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3610, Section 167-A, Nov 2005, Hydraulic Cargo Hatch - Model No. D-WK-787
Coast Guard Technical Publication (TP) 3626, 12/16/1996; Manufacturers Instruction Book-SWBS Group(s) 516-533
Coast Guard Technical Publication (TP) 3626, SWBS 516, Section B, Jan 2007, Pump, AC Heat (Adrick Marine Corporation)
Coast Guard Technical Publication (TP) 3628, 1/1/1999; Vol 4 of 9, Instruction Manual, Bow Thruster
Coast Guard Technical Publication (TP) 3631, Mar 2007, Manufacturer’s Instruction Book-SWBS Group(s) 573-581, Section B, Cross Deck Winch – Appleton Marine Model BMD-463
Coast Guard Technical Publication (TP) 3631, Section 581-A, Sep 2013, Manufacturer's Instruction Book-SWBS Groups 573-581, Anchor Windlass
Coast Guard Technical Publication (TP) 3633, Section A, June 1999, Sewage System
Coast Guard Technical Publication (TP) 3653, Jul 2013; SWBS 245, Section A; Z-Drive - Model 1350-H
General Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses
United States Coast Guard TP-3622, SWBS 437_D, Tank Level Indicating (TLI) System.
OTHER REFERENCES
3.1 General.
3.1.1 CIR.
3.1.2 Tech Rep.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
3.2 System drainage. The Contractor shall drain all affected systems and dispose of removed fluids in accordance with all applicable Federal, state, and location regulations. Ensure that the vessel’s deck surfaces are completely free of spilled water within one hour after system drainage.
3.3 Temporary ASW connections. The Contractor shall rig their flushing system to ensure at least two (2) Air Conditioning (A/C) plants and one Reefer unit are in operation at all times during the flushing and inspection of the ASW piping system. Ensure all ASW piping serving the A/C plants and Reefer units get flushed. Provide a source of cooling water to supply the on-line A/C and Reefer units. Submit a piping schematic of the proposed cooling water supply for approval by the Coast Guard Inspector. Ensure cooling water pressure is regulated per Cutter’s instruction.
3.4 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.5 Contamination prevention. The Contractor shall take all precautions to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations.
3.6 Cleaning plan. The Contractor shall establish a plan for cleaning the designated piping system, using Coast Guard Drawing 175-WLM 256-1 as guidance, listing the step by step procedures necessary to ensure that all foreign debris is removed from the piping system.
Although the Coast Guard prefers pressurized water as the cleaning fluid, the Contractor may propose chemical cleaning as an alternative, providing that the proposed chemical cleaning agent conforms to DOD-STD-2187 (where applicable), is environmentally safe, and pre-approved by the COR. The Contractor shall submit a MSDS to the COR for all chemicals proposed for use.
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for Personal Qualification and Certification in Nondestructive Testing
American Society for Testing and Materials (ASTM) International F1508, 2010, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and Welding End
American Water Works Association (AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American Welding Society (AWS) D1.1, 2008, Structural Welding Code - Steel
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Coast Guard personnel will operate all shipboard machinery and equipment.
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-Petrolatum
Commercial Item Description (CID) A-A-59316, 2003, Abrasive Materials for Blasting
Commercial Item Description (CID) A-A-59323, Rev A, Cloths, Cleaning, Low-Lint
Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone
Deck plates.
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert
Federal Specification (Fed Spec) RR-C-271, Rev E, Dec 2010, Chain and Attachments, Welded and Weldless
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
Gems Sensors and Controls, 1 Cowles Rd, Plainville, CT 06062, Tel: 800-378-1600
Insulation.
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
MIL-DTL-23549, Dec 2011, Grease, General Purpose
Mil-DTL-24643/15, Power and Lighting, Watertight, Circuit Integrity
MIL-F-24402, May 1995, Filters (Hydraulic), Filter Elements (High Efficiency), and Filter Differential Pressure Indicators, General Specification
MIL-I-3064, Mar 1991, Insulation, Electrical, Plastic-Sealer
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
Mil-S-24235/9E, 1992, Stuffing Tubes, Metal, And Packing Assemblies For Electric Cables, Brass and Steel, for Decks and Bulkhead With Pipe Protection.
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-1622, Nov 2006, Cleaning of Shipboard Compressed Air Systems
MIL-STD-2003-3A, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships & Submarines (Penetrations)
NOTE
Piping.
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
The Society for Protective Coatings (SSPC)/NACE International (NACE) 2006, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning
Valves and Strainers
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 19 |
| N |
| Prop Shaft Seal |
| NSN: 5330-01-F15-4227 |
| 2 ea. |
| 25,493.00 |
| 19 |
| N |
| **Seal Ring, MN Bronze |
| NSN: 5330-01-F15-4225 |
| 2 ea. |
| 2,206.00 |
| 19 |
| N |
| Clutch Overhaul Kit (New Clutch) |
| NSN: 2520-01-645-8279 |
| 2 ea. |
| 7,959.62 |
| 19 |
| N |
| **O-Ring |
| NSN: 5331-21-912-4287 |
| 2 ea. |
| 7,007.00 |
| 19 |
| N |
| **Lantern Ring |
| NSN: 4320-21-912-4285 |
| 2 ea. |
| 1,017.00 |
| 20 |
| Y |
| **Z-Drive Lube Oil Cooler |
| NSN: 4420-01-505-9267 |
| 2 ea. |
| 7,725.00 |
| 20 |
| N |
| Heat Exchanger, Gasket |
| NSN: 5330-01-449-2451 |
| 2 ea. |
| 22.53 |
| 20 |
| N |
| Heat Exchanger, Gasket |
| NSN: 5330-01-449-2479 |
| 2 ea. |
| 18.66 |
| 23 |
| N |
| ***Fathometer Transducer, Shallow Water, 50-200 kHz (Airmar Technology SS505) |
| NSN: 5845-01-470-2500 |
| 1 ea. |
| 343.63 |
| 24 |
| Y |
| ****Sperry SRD 500 Doppler speed log |
| NSN: 5999-01-472-7499 |
| 1 ea. |
| 16, 504.43 |
| 25 |
| N |
| **Kreissl 3” Duplex Sea Strainer |
| NSN:4730-01-614-9064 |
| 1 ea. |
| 5,580.00 |
| 29 |
| N |
| Seal Kit, Bow Thruster |
| NSN: 2010-01-555-9048 |
| 1 ea. |
| 3,634.00 |
| 29 |
| N |
| Anode, Zinc |
| NSN: 5365-01-495-5350 |
| 9 ea. |
| 113.75 |
| 30 |
| Y |
| Hydraulic Brake Assembly |
| NSN: 2530-01-550-7474 |
| 4 ea. |
| 399.00 |
| 30 |
| N |
| Winch Gear Box Assembly |
| NSN: 3010-01-F16-4570 PN: SK9052AZ-SAEB-31.4-H1 (Nord Gear Corp) or YMD-7914 (Appleton Marine Inc) |
| 4 ea. |
| 1,000.00 |
| 30 |
| Y |
| Hydraulic Motor |
| NSN: 4320-01-470-8467 |
| 4 ea. |
| 900.00 |
| 30 |
| N |
| Wire Rope |
| NSN: 4010-01-620-9604 |
| 4 ea. |
| 577.95 |
| 30 |
| N |
| Counter Balance Valve |
| NSN: 4820-01-324-4269 |
| 8 ea. |
| 107.50 |
| 30 |
| N |
| Shuttle Valve |
| NSN: 4820-01-317-2748 |
| 8 ea. |
| 34.78 |
| 30 |
| N |
| Needle Valve |
| NSN: 4820-01-329-0051 |
| 4 ea. |
| 38.00 |
| 30 |
| Y |
| **Directional Control Valve |
| NSN: 4810-01-543-3252 |
| 4 ea. |
| 3,465.17 |
| 30 |
| N |
| Electrical Connector, Hirshmann |
| NSN: 5935-01-640-6747 |
| 4 ea. |
| 32.00 |
| 31 |
| N |
| Hardware Kit |
| NSN: 5430-01-494-2479 |
| 2 ea. |
| 618.54 |
| 31 |
| N |
| Hardware Kit, Mechanical |
| NSN: 2030-01-485-7215 |
| 2 ea. |
| 784.35 |
| 32 |
| N |
| Anchor Windlass Overhaul kit |
| NSN: 5430-01-546-4684 |
| 1 ea. |
| 12,474.00 |
| 32 |
| N |
| Ball Valve |
| NSN: 4820-01-013-3430 |
| 1 ea. |
| 87.36 |
| 32 |
| N |
| Valve, Counterbalance |
| NSN: 4820-01-F16-4571 PN: CBEH-LKN-BCL Sun Hydraulics Corp |
| 1 ea. |
| 354.00 |
| 32 |
| N |
| ** Motor, Hydraulic |
| NSN: 4320-01-419-3520 |
| 1 ea. |
| 1,811.00 |
| 32 |
| N |
| ** Valve, Linear, Directional Control |
| NSN: 4810-01-511-3173 |
| 1 ea. |
| 983.14 |
| 32 |
| N |
| Hydraulic Brake |
| NSN: 2530-01-F14-4033 P/N: 90B3C4G087 |
| 1 ea |
| 2000.00 |
| 45 |
| Y |
| *Transducer Cover Plate |
| N/A |
| 2 ea. |
| 50.00 |
| 50 |
| N |
| Refrigerated Air Filter-Dryer |
| Ingersoll-Rand model D72IN |
| 1 ea. |
| 1,000.00 |
| 56 |
| N |
| 26” x 66” Weathertight Door, Steel, LH Swing |
| NSN: N/A |
| 1 ea. |
| 7,500.00 |
| 57 |
| N |
| **24” x 30” ½” thick Clear heat treated (P/S) Windows with Stainless Steel Frames Cres 316 |
| NSN: 2090-01-566-3759 |
PN: 0262501-15 ES Marine TYPE-K-325-F Style A
| 2 ea. |
| 1,228.00 |
| 59 |
| Y |
| Heat Pump #5 and #6 |
| PN: Model SCSC6 |
| 2 ea. |
| 28,250.00 |
| 73 |
| N |
| Gems Sensor XM-36840-039-4300-O-L |
| NSN: N/A. |
PN: 59229
| 1 ea. |
| 1,214.00 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center ****New or refurbished equipment that the Government may provide for installation in place of existing equipment , which is to be supplied by either the vessel or the C4IT Service Center upon receipt of CFR.
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 1 |
| Hull Plating (Side Scan), Ultrasonic Testing |
| 3 |
| Hull Plating (Freeboard), Ultrasonic Testing |
| 10 |
| Appendages (U/W), Leak Test |
| 13 |
| Voids (Non-Accessible), Leak Test |
| 16 |
| Tanks (Ballast), Clean and Inspect |
| 18 |
| Hydraulically Operated Cargo Hatch, Inspect and Service |
| 19 |
| Z-Drive Propulsion Units, Overhaul |
| 26 |
| Sea Bay, Clean and Inspect |
| 29 |
| Thurster Unit (General), Overhaul |
| 30 |
| Hydraulic Crossdeck Winches, Inspect and Service |
| 31 |
| Mechanical Chain Stoppers, Inspect and Service |
| 32 |
| Anchor Windlass, Inspect And Service |
| 33 |
| Anchor Chain(s) and Ground Tackle, Inspect and Repair |
| 41 |
| U/W Body, Preserve (100%) |
| 53 |
| Deck Covering (Interior Wet/Dry), Renew |
| 54 |
| Deck Covering (Interior Wet/Dry), Renew |
| 60 |
| Heat Pump Deck, Preserve |
| 62 |
| Deck Covering (Interior Wet/Dry), Renew |
| 63 |
| Cargo Hold Deck, Preserve 100% |
| 64 |
| Bilges (Machinery/Non-Machinery), Preserve 100% |
| 65 |
| Bilges (Machinery/Non-Machinery), Preserve Partial |
| 66 |
| EDG Switchboard Deck, Preserve |
| 67 |
| Pump Room Deck, Preserve |
Principal Characteristics - TENDER
175' WLM, BUOY TENDER
Physical
| Length overall |
| 174' 8" |
| Length between perpendiculars |
| 155' 1" |
| Depth |
| 14' 8" |
| Maximum beam |
| 36' 0" |
| Designed draft |
| 8' 0" |
| Mast height (above 8' waterline) |
| 58' 8" |
| Frame spacing |
| 20" |
| Full load displacement |
| 855.15 Long Tons SW |
| Light load displacement |
| 719.78 Long Tons SW |
| Minimum op condition displ |
| 852.19 Long Tons SW |
HULL
| Hull material |
| Steel |
Machinery
| Main propulsion |
| Two Caterpillar 3508 DITA V-8 diesel; 999 BHP ea @ 1500 RPM |
Two Ulstein 360 degree steerable Z-Drives, 403 SRPM @ 1600 ERPM
| Reduction gears |
| Two Z-Drive units, Cardan shafting; 3.973:1 gear ratio |
| Shaft seal |
| John Crane Type ND |
| Shaft bearings |
| Five pedestal mounted, Cooper split roller bearings |
| Number of propellers |
| 2 |
| Number of blades |
| 4 |
| Diameter |
| 57.1" |
| Rudders |
| None; Z-drive |
| Ship's service generators |
| Three Caterpillar Model 3406 DITA Turbocharged; 285KW, 450V, 60 Hz, 1800 RPM |
| Emergency diesel generator |
| One Caterpillar Model 3406 DIT 210 KW, 24V, 60 Hz, 1800 RPM |
Tank Capacities
| Diesel oil capacity (100%) |
| 16,385 gal |
| Fresh water capacity (100%) |
| 7,339 gal |
| Lubricating oil (100%) |
| 86 gal |
00000_0316_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3: SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.2 SFLC Standard Specification 0000 General Requirements.
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer:
Abrasive Sieve Size:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer:
Abrasive Sieve Size:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
| Date |
| Test Locations |
| Conductivity (Microsiemens/CM) |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
11000_SideScan_1215_FLT REC_11000_Side_Scan_FLT_175 WLM- ALL (1211)
WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (u/w) hull plating by ultrasonic side scan method.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion COAST GUARD Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2014, General Requirements Other References
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for Personal Qualification and Certification in Nondestructive Testing
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
· 3.3 Side scan requirements and procedures.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
· Hull zinc anode system
· Docking blocks.
3.2 Work coordination and preparation. The Contractor shall plan all specified vessel work detailed in this specification package to ensure the side scan survey does not necessitate a work stoppage. The Contractor shall abide by the following guidance, to facilitate the ultrasonic survey:
· Ensure that all u/w body surface preparation and primer coat application tasks are completed within ten days of lifting the vessel.
· Provide a continuous supply of fresh water at .50 gpm within 50 feet of the vessel with standard hose bib fitting.
· Provide 110 VAC electrical power, and scaffolding or other suitable means of access to bring inspection personnel within one foot of all the body surface inspection areas that are five feet above ground level.
· After completion of the hull survey, and authorized hull repairs, resume/complete u/w body preservation process by applying the second coat of the anti-corrosive coating system, and all anti-fouling paint coats.
· Pay close attention to manufacturer’s recommended practices in regards to paint system overcoat time limitations and required degree of surface cleanliness prior to resuming u/w body coating application.
3.3 Side scan requirements and procedures. The Contractor shall ensure the following referring to the Coast Guard drawings listed in Section 2 (References) herein as guidance during the performance of the tasks specified below and submit a CIR.
3.3.1 Testing company and personnel. Provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating for the presence of metal corrosion and deterioration. Ensure the following:
· All scanning operations are completed by personnel meeting the personnel qualification and certification, as required by contractor process. This contractor developed personnel qualification and certification process must meet, at a minimum, ASNT Recommended Practice No. SNT-TC-1A.
· An SNT Level III Analyst is on site, to oversee the project and evaluate the collected data.
· An SNT Level III or II Analyst is on site, to verify with a hand held gauge all…