ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES

SOLICITATION NO. HSCG85-16-R-P45018

Dry Dock Repairs of USCGC STRATTON (WMSL 752) FY16

B.1 CLIN 0001 - DEFINITE ITEMS

These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.

ITEM

NO.

DESCRIPTION QTY UNIT UNIT PRICE AMOUNT

D-01 3-D Hull Scan 1 JB $ $

D-02 Hull Plating, U/W Body Ultrasonic Testing 1 JB $ $

D-03 Propulsion Shaft Fairwaters and Rope Guards, Inspect and Repair 1 JB $ $

D-04 Chain Lockers, Clean and Inspect 1 JB $ $

D-05 Tanks (JP-5), Clean and Inspect 1 JB $ $

D-06 Voids (Non-Accessible), Leak Test and Preserve 1 JB $ $

D-07 Propulsion Shaft GRP Coating, Inspect, Test, and Repair 1 JB $ $

D-08 Propulsion Shaft Seals (Mechanical), Inspect and Clean 1 JB $ $

D-09 Propulsion Shaft Alignment Check and Bearings (External) Check Clearances 1 JB $ $

D-10 Controllable Pitch Propeller System, General Maintenance 1 JB $ $

D-11 Controllable Pitch Propeller Hub Assembly, General Maintenance 1 JB $ $

D-12 Doppler Speed Log, General Maintenance 1 JB $ $

D-13 Fathometer Transducer (Shallow Water), Renew 1 JB $ $

D-14 Fathometer Transducer (Deep Water), General Maintenance 1 JB $ $

D-15 Doppler Speed Log, Valve, Overhaul 1 JB $ $

D-16 Sea Valves and Waster Pieces, Overhaul or Renew 1 JB $ $

D-17 Seawater Strainers (All Sizes), Overhaul and Inspect 1 JB $ $

D-18 Port and Starboard Steering Actuator, Overhaul 1 JB $ $

D-19 Rudder, Inspect and Repair 1 JB $ $

D-20 Rudder Stock Seals, Clean and Inspect 1 JB $ $

D-21 Bow Thruster Unit (General), Overhaul 1 JB $ $

D-22 Anchors, Chains, and Stoppers, Inspect and Preserve 1 JB $ $

D-23 Transom Doors, Inspection and Repair 1 JB $ $

D-24 Stern Ramp, Preserve 100% 1 JB $ $

D-25 Cathodic Protection, Zinc Anode Renew 1 JB $ $

D-26 Impressed Current Cathodic Protection System, Inspect and Maintain 1 JB $ $

D-27 Temporary Services, Dry-dock Provide 1 JB $ $

D-28 Sea Trials 1 JB $ $

D-29 Dry-docking, Accomplish 1 JB $ $

D-30 Tanks (Ballast), Clean & Inspect 1 JB $ $

D-31 Hull Plating, Underwater Body Preserve,100 % 1 JB $ $

D-32 Hull Plating Freeboard, Preserve “100%” 1 JB $ $

D-33 Port and Starboard Sea Chest Suctions, Modify 1 JB $ $

D-34 Sounding Tubes, Replace 1 JB $ $

TOTAL AMOUNT OF ALL DEFINITE ITEMS $ $

B.2 CLIN 0002 - OPTIONAL ITEMS

Optional items listed below will be awarded if inspection reports reveal the necessity for activation, but before 15 March 2016 (see Contract Clause 18 entitled “Optional Items). The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The quantities are estimates used for evaluation purposes only. Actual quantities may vary.

The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). See

ATTACHMENT 3, Section 18, Pages 8-9, entitled “OPTIONAL ITEMS.”

ITEM

NO. DESCRIPTION

QTY UNIT UNIT PRICE AMOUNT

O-35 General Welding, Provide-Optional

O-35A

Para 3.3.1 The contractor shall provide a bid to perform

5 sq. ft. of clad welding at a designated location. The bid shall include the costs of set up, gas free certification and additional ventilation as required, but no additional amount for interferences shall be include. The 2 sq. ft. of clad welding shall be in 4 inch square sections at locations designated by the Coast Guard Inspector. All locations shall be close enough that additional welding set up or additional ventilation shall not be required. 1 JB $ $

O-35B

Para 3.3.2 The contractor shall provide a bid to perform an additional 5 sq. ft. of clad welding at the same location as in paragraph 3.3.1. No additional set up shall be required. No additional gas free certification or ventilation shall be required. This section of the bid may be authorized up to 5 additional times. All welding shall take place in the same area with no additional set up, gas free certification or ventilation required. 5 JB $ $

O-36 Plate Renewal-Optional 1 JB $ $

O-37 Propulsion Shaft Sleeve, Skim Cut-Optional

O-37A Para 1.1 - Starboard propeller 1 JB $ $

O-37B Para 1.1 - Port propeller 1 JB $ $

O-38 Propulsion Shaft Bearing Stave Renewal-Optional

O-38A Para 1.1 - Port main strut bearing 1 JB $ $

O-38B Para 1.1 - Starboard main strut bearing 1 JB $ $

O-38C Para 1.1 - Port Stern Tube bearing 1 JB $ $

O-38D Para 1.1 - Starboard Stern Tube Bearing 1 JB $ $

O-39 Intermediate Shaft Sleeve, Skim Cut-Optional

O-39A Para 1.1 - Port stern tube shaft sleeve 1 JB $ $

O-39B Para 1.1 - Starboard stern tube shaft sleeve 1 JB $ $

O-40 Propulsion Shafting, Remove, Inspect, and Reinstall-Optional

O-40A Para 1.1 - Port shaft 1 JB $ $

O-40B Para 1.1 - Starboard shaft 1 JB $ $

O-41 Ballast Tanks, Preserve -Optional

O-41A Tank located at 5-22-0-W 1 JB $ $

O-41B Tank located at 5-82-0-W 1 JB $ $

O-42 Chain Locker, Preserve -Optional

O-42A Chain locker, Starboard 3-9-1-Q 1 JB $ $

O-42B Chain locker, Port 3-9-2-Q 1 JB $ $

O-42C Chain locker sump 3-9-0-W 1 JB $ $

O-43 Tanks (JP-5), Preserve -Optional

O-43A JP-5 Storage tank 5-70-0-J 1 JB $ $

O-43B JP-5 Storage tank 5-76-0-J 1 JB $ $

O-43C JP-5 Storage tank 3-68-6-J 1 JB $ $

O-43D JP-5 Service Tank 3-68-8-J 1 JB $ $

O-43E JP-5 Overflow Tank 4-67-2-J 1 JB $ $

O-43F JP-5 Drain Tank 4-70-2-J 1 JB $ $

O-44 Impressed Current Cathodic Protection System Anodes, Renew-Optional

O-44A Para 3.1 Table 1 Stbd Sea Water Ballast Tank (5-

16-1-W) 1 JB $ $

O-44B Para 3.1 Table 1 Port Sea Water Ballast Tank (5-

16-2-W) 1 JB $ $

O-44C Para 3.1 Table 1 Stbd Fwd Main Machinery Rm (5-

44-01-E) 1 JB $ $

O-44D Para 3.1 Table 1 Port Fwd Main Machinery Rm (5-

44-01-E) 1 JB $ $

O-44E Para 3.1 Table 1 Stbd Void (5-82-1-V) 1 JB $ $

O-44F Para 3.1 Table 1 Port Void (5-82-2-V) 1 JB $ $

O-45 Impressed Current Cathodic Protection System Reference Cells, Renew- Optional

O-45A Para 3.2 Table 1 Stbd Void (5-10-0-V) 1 JB $ $

O-45B Para 3.2 Table 1 Port Void (5-10-0-V) 1 JB $ $

O-45C Para 3.2 Table 1 Stbd Shaft Alley (5-64-1-Q) 1 JB $ $

O-45D Para 3.2 Table 1 Port Void (5-64-2-V) 1 JB $ $

O-46 Impressed Current Cathodic Protection System Dielectric Shield, Repair-Optional

O-46A Para 3.1 Table 1 Stbd Sea Water Ballast Tank (5-

16-1-W) 1 JB $ $

O-46B Para 3.1 Table 1 Port Sea Water Ballast Tank (5-16-

2-W) 1 JB $ $

O-46C Para 3.1 Table 1 Stbd Fwd Main Machinery Rm (5-

44-01-E) 1 JB $ $

O-46D Para 3.1 Table 1 Port Fwd Main Machinery Rm (5-

44-01-E) 1 JB $ $

O-46E Para 3.1 Table 1 Stbd Void (5-82-1-V) 1 JB $ $

O-46F Para 3.1 Table 1 Port Void (5-82-2-V) 1 JB $ $

TOTAL AMOUNT OF ALL OPTIONAL ITEMS $

TOTAL-ALL DEFINITE & OPTIONAL ITEMS $

B.3 COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES

The following labor hour rate shall be used in pricing all contract changes in accordance with

ATTACHMENT 3, Section 15, Pages 6-7, entitled "COMPOSITE LABOR RATE.”

LABOR HOUR RATE

ESTIMATED QUANTITY

6936 hours

EXTENDED AMOUNT

**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The proposed rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.

B.4 LAY DAYS

Provide a price for dry dock Lay Days in accordance with HSAR 3052-217-94 (DEC 2003). The quoted price per day will apply to all lay days.

PRICE PER DAY ESTIMATED QUANTITY

EXTENDED AMOUNT

X 3 DAYS

**NOTE: The estimated quantity of Three (3) days is for evaluation purposes only.