ABBIE BURGESS DRY DOCK Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ABBIE_BURGESS_SECTION_B.xls | XLS spreadsheet | |
| ABBIE_BURGESS_SOLICITATION.docx | DOCX document | |
| Past_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC ABBIE BURGESS (WLM 553)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2016
Developed By: Jonathan C Copley (Rev-0, 11 January 2016)
TABLE OF CONTENTS
ivRevisions Record vConsolidated List of References xConsolidated List of Government-furnished Property xiiiConsolidated List of Critical Inspection Items xivPrincipal Characteristics - TENDER
1General Requirements
10WORK ITEM 1: Hull Plating (U/W Body), Inspect
13WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing
16WORK ITEM 3: Appendages (U/W), Leak Test
19WORK ITEM 4: Appendages (U/W) - Internal, Preserve
21WORK ITEM 5: Chain Lockers, Clean and Inspect
23WORK ITEM 6: Tanks (MP Fuel Stowage and Overflow), Clean and Inspect
27WORK ITEM 7: Voids (Non-Accessible), Leak Test
29WORK ITEM 8: Voids (Non-Accessible), Internal Surfaces, Preserve
31WORK ITEM 9: Tanks (Hydraulic Oil Stowage and Service), Clean and Inspect
34WORK ITEM 10: Tanks (Lube Oil), Clean and Inspect
38WORK ITEM 11: Tanks (Dirty Oil and Waste), Clean and Inspect
41WORK ITEM 12: Z-Drive Propulsion Units, Overhaul
50WORK ITEM 13: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean
53WORK ITEM 14: Fathometer Transducer, Renew
57WORK ITEM 15: Underwater (Speed) Log Transducer(s), Renew
59WORK ITEM 16: Sea Strainers - Duplex (All Sizes), Overhaul
62WORK ITEM 17: Sea Bay, Clean and Inspect
65WORK ITEM 18: Sea Bay, Preserve 100%
67WORK ITEM 19: Thruster Unit (General), Overhaul
71WORK ITEM 20: Hydraulic Crossdeck Winches, Inspect and Service
76WORK ITEM 21: Hydraulic Inhaul Winch, Inspect and Service
85WORK ITEM 22: Mechanical Chain Stoppers, Inspect and Service
88WORK ITEM 23: Anchor Windlass, Inspect and Service
92WORK ITEM 24: Anchor Chain(s) and Ground Tackle, Inspect and Repair
99WORK ITEM 25: Warping Capstan (Aft), Inspect and Service
103WORK ITEM 26: Tanks (Dirty Oil and Waste), Preserve “100%”
107WORK ITEM 27: Tanks (Dirty Oil and Waste), Preserve “Partial”
110WORK ITEM 28: U/W Body, Preserve (100%)
114WORK ITEM 29: Hull Plating Freeboard, Preserve “100%”
117WORK ITEM 30: Cathodic Protection / Zinc Anodes, Renew
120WORK ITEM 31: Drydock
124WORK ITEM 32: Temporary Services, Provide - Cutter
127WORK ITEM 33: Sea Trial Performance, Support, Provide
131WORK ITEM 34: M240 Gun Mounts, Ready Service Locker, and Ammunition Stowage Box, Install
134WORK ITEM 35: Bilges, Preserve
138WORK ITEM 36: Buoy Deck Cleats, Modify
142WORK ITEM 37: Power Assisted Griping System, Remove
147WORK ITEM 38: Buoy Crane Main Winch, CT Function, Remove
152WORK ITEM 39: Chain Locker, Preserve 100%
154WORK ITEM 40: Decks – Exterior (Buoy or Construction Deck), Preserve 100%
157WORK ITEM 41: Tanks (Sewage Holding), Preserve “Partial”
160WORK ITEM 42: Deck Covering, Wet/ Dry, Seal
163WORK ITEM 43: Decks - Exterior, Preserve (“MIL-Spec/Flight Deck” System)
167WORK ITEM 44: Superstructure, Preserve “100%”
171WORK ITEM 45: Hull and Structural Plating (General) -10.2-Pound Steel, Repair
173WORK ITEM 46: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Repair
175WORK ITEM 47: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Repair
177WORK ITEM 48: Hull and Structural Plating (General) - 20.5-Pound Steel Plate, Repair
179WORK ITEM 49: Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Repair
181WORK ITEM 50: Hull and Structural Plating (General) – 7.65-Pound Steel Plate, Repair
183WORK ITEM 51: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean
186WORK ITEM 52: Scuttles (External), Renew
189WORK ITEM 53: Deck Covering (Interior Wet/Dry), Renew
192WORK ITEM 54: Sewage Holding Tank Firemain Washdown Nozzle, Renew
195WORK ITEM 55: Decks (All Interior) Pump Room, Preserve
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages
Coast Guard Drawing 175 WLM 130-001, Rev -, Mods to Buoy Deck Incidental to Hawser Pipe Cover
Coast Guard Drawing 175-WLM 167-001, Rev L, Structural Closures
Coast Guard Drawing 175 WLM 184-001, Rev-, V850 Transducer Adapter Ring
Coast Guard Drawing 175 WLM 243-002, Rev F, Propulsion Shaft Arrangement
Coast Guard Drawing 175 WLM 245-001, Rev A, Propeller
Coast Guard Drawing 175 WLM 256-004, Rev J, Seawater Cooling System A & D, Hull Blocks 940-970
Coast Guard Drawing 175 WLM 256-013, Rev -, Sea Bay Thermometer Probe Install
Coast Guard Drawing 175 WLM 259-001, Rev A, Combustion Exhaust Diagram
Coast Guard Drawing 175 WLM 259-005, Rev C, Combustion Exhaust A&D, Hull Block 970
Coast Guard Drawing 175 WLM 320-001, Rev AJ, Electrical One-Line Diagram
Coast Guard Drawing 175 WLM 320-002, Rev G, Power System Deck Plan Frame 24 Fwd, Hull Blocks 910 & 901
Coast Guard Drawing 175 WLM 320-009, Rev R, Power Sys Elem Wiring Diagram
Coast Guard Drawing 175 WLM 330-002, Rev F, Lighting System Fr 24 Fwd, Hull Blk 910 & 901
Coast Guard Drawing 175 WLM 437-007, Rev P, Buoy Deck Control Sys Block, ISO & Elementary Wiring Diagram
Coast Guard Drawing 175 WLM 505-003, Rev B, Sea Connection Arrangements
Coast Guard Drawing 175 WLM 506-001, Rev G, Overflows, Air Escapes & Sounding Tubes Diagram
Coast Guard Drawing 175-WLM 521-001, Rev K, Firemain System Diagram
Coast Guard Drawing 175-WLM 521-004, Rev F, Firemain System A&D, Hull Block 940/950
Coast Guard Drawing 175 WLM 528-002, Rev M, Weather Deck Drains Diagram
Coast Guard Drawing 175 WLM 541-001, Rev H, Fuel Oil System Diagram
Coast Guard Drawing 175 WLM 541-006, Rev C, Independent Tanks, Emergency Generator Day Tank IIP:7-1
Coast Guard Drawing 175-WLM 549-001, Rev E, Onboard Lubrication Requirements
Coast Guard Drawing 175 WLM 556-001, Rev L, Hydraulic System Diagram
Coast Guard Drawing 175 WLM 556-004, Rev D, Fwd Hydraulic System A/D Hull Block 920
Coast Guard Drawing 175-WLM 568-001, Rev B, Bow Thruster Arrangement & Detail
Coast Guard Drawing 175-WLM 568-002, Rev K, Bow Thruster Detail Coast Guard Drawing 175 WLM 573-001, Rev U, Buoy Deck Arrangement
Coast Guard Drawing 175 WLM 581-001, Rev F, Anchor Handling System Arrgt
Coast Guard Drawing 175 WLM 581-001, Rev F, Anchor Handling System Arrgt
Coast Guard Drawing 175 WLM 593-001, Rev G, Sewage & Waste Water System Diagram
Coast Guard Drawing 175-WLM 593-005, Rev F, Sewage & Waste Water System A/D – Hull Block 940 & 950
Coast Guard Drawing 175 WLM 593-009, Rev E, Independent Tanks, Sewage Holding Tank
Coast Guard Drawing 175 WLM 601-001, Rev R, General Arrangement and Inboard and Outboard Profiles
Coast Guard Drawing 175-WLM 601-003, Rev M, Booklet of General Plans
Coast Guard Drawing 175 WLM 633-001, Rev D, Cathodic Protection
Coast Guard Drawing 175 WLM 702-001, Rev D, M240 Cal Mach Gun Install Arrgt & Dets
Coast Guard Drawing 175 WLM 801-001, Rev A, Hull Lines
Coast Guard Drawing 175 WLM 801-003, Rev A, Curves of Form
Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan
Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion
Coast Guard Drawing 175 WLM 920-001, Rev K, Hull Block 920 Panels
Coast Guard Drawing 175 WLM 920-002, Rev L, Hull Block 920 Modules
Coast Guard Drawing 175-WLM 910-002, Rev H, Hull Block 910 Modules
Coast Guard Drawing 175-WLM 990-001, Rev J, Hull Block Erection Plan
Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain
Coast Guard Drawing FL 2605-037, Rev A, Mechanical Chain Stopper Reinstallation
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem
Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters
NAVSEA Drawing 2803-980209, Plates, Label
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 3446, Jun 2009, Doppler Speed Log, Model SRD-500 Dual Axis
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3628, 1/1/1999; Vol 4 of 9, Instruction Manual, Bow Thruster
Coast Guard Technical Publication (TP) 3630, SWBS 573, Section A (573A), Jun 2015, Manufacturer's Instruction Book-SWBS Group 573, Buoy Crane
Coast Guard Technical Publication (TP) 3631, Mar 2007, Manufacturer’s Instruction Book-SWBS Group(s) 573-581, Section B, Cross Deck Winch – Appleton Marine Model BMD-463
Coast Guard Technical Publication (TP) 3631, Section 581-A, Sep 2013, Manufacturer's Instruction Book-SWBS Groups 573-581, Anchor Windlass
Coast Guard Technical Publication (TP) 3632, Section 582-A, March 2014, Manufacturer's Instruction Book-SWBS Groups 582-583, Aft Capstan
Coast Guard Technical Publication (TP) 3633, SWBS 593, Sewage System
Coast Guard Technical Publication (TP) 3653, Jul 2013; SWBS 245, Section A; Z-Drive - Model 1350-H
Coast Guard Technical Publication (TP) 5458, SWBS 555, Oct 2012, Winch, Radial – Model 50.2PT (270 WMEC A-Class)
Surface Forces Logistics Center Naval Engineering Directive (SFLC NED) 5735-01, 05 May 2010, Inspection And Test Procedure For Buoy Chain Winch Model Cw-1 Onboard WLM 551 Through 564 And WLB 201-215
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC Electrical Motors
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, And Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses
OTHER REFERENCES
ASTM International (ASTM) A53, 2005, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and Seamless
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component Adhesives (AN)
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An)
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2013, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 29, Part 1915, Section 15, 2007, Shipyard Employment
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-Petrolatum
Commercial Item Description (CID) A-A-59323, Rev A, Cloths, Cleaning, Low-Lint
Commercial Item Description (CID) A-A-59588, 2005, Rubber Silicone
DOD-STD-2188, Apr 1987, Babbitting of Bearing Shells
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Rubber-Sheet, Cloth Insert
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Rubber-Sheet, Cloth Insert
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
Federal Specification (Fed Spec) RR-C-271, Rev E, Dec 2010, Chain and Attachments, Welded and Weldless
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)
MIL-DTL-23549, Dec 2011, Grease, General Purpose
MIL-F-24402, May 1995, Filters (Hydraulic), Filter Elements (High Efficiency), and Filter Differential Pressure Indicators, General Specification
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric)
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-PRF-24667, Jun 2005, Coating system, Non-Skid, for Roll or Spray Application
MIL-PRF-900, Mar 1991, Rubber Gasket Material, 45 Durometer Hardness
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-419, Jul 1987, Cleaning and Protecting Piping, Tubing and Fittings for Hydraulic Power Transmission Equipment
QPL-24667, May 2006, Qualified Product List of Products Qualified under Performance Specification MIL-PRF-24667, Coating system, Non-Skid, for Roll or Spray Application
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC), May 2012, Paint Application Specification No. 2 (PA-2), Measurement of Dry Coating Thickness with Magnetic Gages
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 12 |
| N |
| Prop Shaft Seal |
| NSN: 5330-01-F15-4227 |
| 2 ea. |
| 25,493.00 |
| 12 |
| N |
| **Seal Ring, MN Bronze |
| NSN: 5330-01-F15-4225 |
| 2 ea. |
| 2,206.00 |
| 12 |
| N |
| Clutch Overhaul Kit (New Clutch) |
| NSN: 2520-01-645-8279 |
| 2 ea. |
| 7,959.62 |
| 12 |
| N |
| **O-Ring |
| NSN: 5331-21-912-4287 |
| 2 ea. |
| 7,007 |
| 12 |
| N |
| **Lantern Ring |
| NSN: 4320-XF-C34-1974 |
| 2 ea. |
| 1,017 |
| 14 |
| N |
| ***Fathometer Transducer, Shallow Water, 50-200 kHz (Airmar Technology SS505) |
| NSN: 5845-01-470-2500 |
| 1 ea. |
| 148.92 |
| 15 |
| Y |
| ***Sperry SRD 500 Doppler speed log |
| NSN:5999-01-472-7499 |
| 1 ea. |
| 12,936.00 |
| 16 |
| N |
| ***Kreissl 3” Duplex Sea Strainer |
| NSN:4730-01-614-9064 |
| 1 ea. |
| 5,580.00 |
| 19 |
| N |
| Seal Kit, Bow Thruster |
| NSN: 2010-01-555-9048 |
| 1 ea. |
| 3,634.00 |
| 19 |
| N |
| Anode, Zinc |
| NSN: 5365-01-495-5350 |
| 9 ea. |
| 113.75 |
| 20 |
| Y |
| Hydraulic Brake Assembly |
| NSN: 2530-01-550-7474 |
| 4 ea. |
| 399.00 |
| 20 |
| N |
| Winch Gear Box Assembly |
| NSN: 3010-XF-C34-2104 (PN-YMD-7914) |
| 4 ea. |
| 1,000.00 |
| 20 |
| Y |
| Hydraulic Motor |
| NSN: 4320-01-470-8467 |
| 4 ea. |
| 900.00 |
| 20 |
| N |
| Wire Rope |
| NSN: 4010-01-620-9604 |
| 4 ea. |
| 577.95 |
| 20 |
| N |
| Counter Balance Valve |
| NSN: 4820- 01-324-4269 |
| 8 ea. |
| 107.50 |
| 20 |
| N |
| Shuttle Valve |
| NSN: 4820-01-317-2748 |
| 8 ea. |
| 34.78 |
| 20 |
| N |
| Needle Valve |
| NSN: 4820-01-329-0051 |
| 4 ea. |
| 38.00 |
| 20 |
| Y |
| **Directional Control Valve |
| NSN: 4810-01-543-3252 |
| 4 ea. |
| 3,465.17 |
| 20 |
| N |
| Electrical Connector, Hirshmann |
| NSN: 5935-01-640-6747 |
| 4 ea. |
| 32.00 |
| 20 |
| Y |
| **Winch Drum Power Operated |
| NSN: 3950-01-475-5105 |
| 2 ea. |
| 59,091.24 |
| 20 |
| Y |
| **Winch Drum Power Operated |
| NSN: 3950-01-475-4951 |
| 2 ea. |
| 59,091.24 |
| 21 |
| N |
| Roller bearing Unit |
| NSN:3130-01-504-4363 |
| 2 ea. |
| 4,012.00 |
| 21 |
| N |
| Grease seal |
| NSN: 5330-01-462-5544 |
| 4 ea. |
| 79.25 |
| 21 |
| N |
| Level wind pivot bushing |
| NSN: 3120-01-621-2293 |
| 1 ea. |
| 1,139.00 |
| 21 |
| N |
| Level wind thrust bearing |
| NSN: 3120-01-621-2300 |
| 2 ea. |
| 483.30 |
| 21 |
| N |
| Rexroth DCV |
| NSN: 4810-01-507-0037 |
| 1 ea. |
| 208.29 |
| 21 |
| N |
| Rexroth Sandwich Flow Control |
| NSN: 4810-01-505-9289 |
| 1 ea. |
| 250.00 |
| 21 |
| N |
| Sun Sandwich Relief Valves |
| NSN: 4820-01-439-2451 |
| 2 ea. |
| 900.00 |
| 21 |
| N |
| Rexroth Tandem Center Proportional Directional Valve |
| NSN: 4810-01-506-3841 |
| 1 ea. |
| 300.00 |
| 21 |
| Y |
| Level Wind Hydraulic Cylinder) |
| NSN: 3040-01-441-3721 |
| 1 ea. |
| 7,423.00 |
| 21 |
| N |
| 3:1 Pilot Ratio, Vented Counterbalance Valve Assembly |
| NSN: 4820-01-563-5841 |
| 1 ea |
| 98.70 |
| 21 |
| N |
| Fully Adjustable Needle Valve |
| NSN: 4820-01-416-0579 |
| 1 ea |
| 48.75 |
| 21 |
| N |
| Wire Rope Assembly |
| NSN: 4010-01-646-6972 |
| 1 ea. |
| 500.00 |
| 21 |
| Y |
| **Hydraulic Motor |
| NSN: 4320-01-445-2248 |
| 1 ea |
| 23,998 |
| 21 |
| N |
| **Pump, Hydraulic Ram, Hand Driven |
| NSN: 4320-01-286-4065 |
| 1 ea. |
| 419.77 |
| 21 |
| N |
| **Cylinder Pin |
| NSN: 5315-01-515-9847 |
| 1 ea |
| 500.00 |
| 21 |
| N |
| **Cylinder Pin |
| NSN: 5315-01-515-9912 |
| 1 ea |
| 520.00 |
| 22 |
| N |
| Hardware Kit |
| NSN: 5430-01-494-2479 |
| 2 ea. |
| 618.54 |
| 22 |
| N |
| Hardware Kit, Mechanical |
| NSN: 2030-01-485-7215 |
| 2 ea. |
| 784.35 |
| 23 |
| N |
| Anchor Windlass Overhaul kit |
| NSN: 5430-01-546-4684 |
| 1 ea. |
| 12,474.00 |
| 23 |
| N |
| Ball Valve |
| NSN: 4820-01-013-3430 |
| 1 ea. |
| 87.36 |
| 23 |
| N |
| Valve, Counterbalance |
| NSN: 0000-XF-C03-5889 PN: Sun CBEH-LKN-BCL |
| 1 ea. |
| N/A |
| 23 |
| N |
| ** Motor, Hydraulic |
| NSN: 4320-01-419-3520 |
| 1 ea. |
| 1,811.00 |
| 23 |
| N |
| ** Valve, Linear, Directional Control |
| NSN: 4810-01-511-3173 |
| 1 ea. |
| 983.14 |
| 31 |
| Y |
| *Transducer Cover Plate |
| N/A |
| 2 ea. |
| 50.00 |
| 34 |
| N |
| Ready Service Locker (with rear heat shield installed) |
| NSN: 2090-01-317-7266 |
| 1 ea. |
| 6,200.00 |
| 36 |
| Y |
| Cleat, Rope (15 in. steel) |
| NSN: 2040-01-614-2587 |
| 6 ea. |
| 154.81 |
| 36 |
| Y |
| Winch, Drum, Hand Operated |
| NSN: 3950-01-614-5150 |
| 4 ea. |
| 1,934.35 |
| 38 |
| N |
| Joystick Controller, Winch |
| NSN: 3950-01-603-1550 |
| 1 ea |
| 500.00 |
| 38 |
| N |
| Wire Rope, Crane Main Fall |
| NSN: 3950-01-617-1700 |
| 1 ea |
| 1,425.00 |
| 38 |
| Y |
| **Main CT Winch |
| NSN: 3950-01-419-1845 |
| 1 ea. |
| 33,000.00 |
| 52 |
| Y |
| Scuttle 18” dia RWTQA; Steel; 12” Coaming |
| NAVSEA Dwg 803-1401890 NSN 2040-00-727-5458 |
| 2 |
| 3,000.00 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 2 |
| Hull Plating (U/W Body), Ultrasonic Testing |
| 3 |
| Appendages (U/W), Leak Test |
| 7 |
| Voids (Non-Accessible), Leak Test |
| 12 |
| Z-Drive Propulsion Units, Overhaul |
| 16 |
| Sea Strainers - Duplex (All Sizes), Overhaul |
| 17 |
| Sea Bay, Clean and Inspect |
| 20 |
| Hydraulic Crossdeck Winches, Inspect and Service |
| 21 |
| Hydraulic Inhaul Winch, Inspect and Service |
| 22 |
| Mechanical Chain Stoppers, Inspect and Service |
| 23 |
| Anchor Windlass, Inspect and Service |
| 24 |
| Anchor Chain(s) and Ground Tackle, Inspect and Repair |
| 25 |
| Warping Capstan (Aft), Inspect and Service |
| 28 |
| U/W Body, Preserve (100%) |
Principal Characteristics - TENDER
175' WLM, BUOY TENDER
Physical
| Length overall |
| 174' 8" |
| Length between perpendiculars |
| 155' 1" |
| Depth |
| 14' 8" |
| Maximum beam |
| 36' 0" |
| Designed draft |
| 8' 0" |
| Mast height (above 8' waterline) |
| 58' 8" |
| Frame spacing |
| 20" |
| Full load displacement |
| 855.15 Long Tons SW |
| Light load displacement |
| 719.78 Long Tons SW |
| Minimum op condition displ |
| 852.19 Long Tons SW |
HULL
| Hull material |
| Steel |
Machinery
| Main propulsion |
| Two Caterpillar 3508 DITA V-8 diesel; 999 BHP ea @ 1500 RPM |
Two Ulstein 360 degree steerable Z-Drives, 403 SRPM @ 1600 ERPM
| Reduction gears |
| Two Z-Drive units, Cardan shafting; 3.973:1 gear ratio |
| Shaft seal |
| John Crane Type ND |
| Shaft bearings |
| Five pedestal mounted, Cooper split roller bearings |
| Number of propellers |
| 2 |
| Number of blades |
| 4 |
| Diameter |
| 57.1" |
| Rudders |
| None; Z-drive |
| Ship's service generators |
| Three Caterpillar Model 3406 DITA Turbocharged; 285KW, 450V, 60 Hz, 1800 RPM |
| Emergency diesel generator |
| One Caterpillar Model 3406 DIT 210 KW, 24V, 60 Hz, 1800 RPM |
Tank Capacities
| Diesel oil capacity (100%) |
| 16,385 gal |
| Fresh water capacity (100%) |
| 7,339 gal |
| Lubricating oil (100%) |
| 86 gal |
00000_0315_FLT
REC_00000_FLT_ Commercial Project @ Contractor’ Facility (1212) General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Stand Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
· None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (Frame References) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
11000_0815_FLT
REC_11000_UWHIB_FLT_175’ WLM (ALL) (1211)
WORK ITEM 1: Hull Plating (U/W Body), Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s Under Water (U/W) hull plating, including U/W appendages and coating system.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Other References
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
The Society for Protective Coatings (SSPC), May 2012, Paint Application Specification No. 2 (PA-2), Measurement of Dry Coating Thickness with Magnetic Gages
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Inspection. The Contractor shall accompany the Underwater Hull Inspection Board (UWHIB) in the performance of the below inspection tasks, as applicable, using the drawings listed in Section 2 (References) as guidance. The Contractor shall provide the following, to facilitate the UWHIB in assessing the condition of the designated U/W hull components and systems:
· A hull repair supervisor and a marker.
· Temporary staging and other necessary equipment, as applicable, for ensuring safe access to all areas of the U/W hull.
NOTES
1. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.
2. Some of the components and/or systems addressed in this work item may not be applicable to all vessel classes.
3.2.1 Hull plating.
3.2.1.1 The Contractor shall inspect the condition of the hull plating (including thruster tunnel plating, as applicable), for the presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action.
3.2.1.2 The Contractor shall inspect the hull and keel areas, report on the condition of butt-welded seams, doubler plates, lap seams, and for any signs of damaged plating or unusual waviness in the plating.
3.2.2 Sea chests and all other cooling system intake components. The Contractor shall inspect all sea chests, tunnels, hull openings, and grates for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolts, marine growth on grating slots, and any obstructions in the openings that might prevent proper suction and discharge of water.
3.2.3 Water jet drive. The Contractor shall inspect the water jet drive assembly for signs of corrosion, pitting, erosion, fouling, cracks, dings, and nicks. Inspect all linkages for any missing fasteners, physical damage, pitting, or other conditions effecting usage.
3.2.5 Transducers. The Contractor shall check general condition for cuts, cracks, corrosion, and surface defects around the openings. Check transducer securing nuts for tightness, and inspect cables for chafing and other damage.
3.2.6 Zinc anodes.
3.2.6.1 The Contractor shall remove all marine growth and oxide coating from all hull, rudder, shaft strut, sea chest, z-drive, and thruster tunnel zinc anodes, or water jet drives anodes, as applicable, using a light-wire brush.
3.2.6.2 The Contractor shall visually inspect all zinc anodes; check the soundness of mounting strap and stud welds, missing fasteners, and percentage of remaining material.
3.2.7 Coating system inspections. The Contractor shall accomplish the below inspections, in conjunction with the underwater hull inspection conducted by the Underwater Hull Inspection Board (UWHIB). Document the condition found as “Partial - Condition A”, “Partial - Condition B”, “Partial Condition C”, or “100%”, as applicable (see 4.1 (Definitions)). Submit a CFR.
NOTE
The following inspections are for determining the existing condition of the coating system for the underwater body surfaces, which are deemed “Critical-coated” surfaces; they must be carried out by a SSPC-QP-1 certified contractor/sub-Contractor or a NACE Inspector – see SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.2.7.1 Visual. Perform a visual inspection of the existing U/W body coating system.
3.2.7.2 Dry film thickness (DFT) measurements. Take total DFT measurements of the U/W body coating system, in accordance with SSPC-PA 2.
3.2.7.3 Coating system thickness and scheme inspection. Perform a microscopic observation of precision angular cuts in the coating system film (“Tooke Paint Inspection”), in accordance with ASTM D4138, and measure the total coating thickness and thickness of each individual coat of paint, in addition to identifying/verifying the existing color scheme for each coat of paint comprising the coating system.
NOTE
The Tooke Paint Inspection Gage/Gauge (Plastic) is a precision tool for inspection and thickness measurement (ASTM D4138) of single or multiple coats on any substrate, and for microscopic observation and measurement of substrate and film defects. The gage uses an illuminated 50-power microscope with measuring reticle, and mounts tungsten carbide cutting tips for precise incision of the work surface.
Direct measurement of total coating thickness and thickness of individual coats of paint is a unique capability of the Tooke Paint Inspection Gage/Gauge. Thus, in addition to routine use, it often serves as a “referee” instrument to calibrate indirect or non-destructive thickness measuring instruments.
Other uses include assessment of substrate conditions and coating adhesion, and observation of microscopic cracking, tendency for brittleness, cratering, or other microscopic film symptoms.
3.2.7.3.1 Take a total of four readings in locations designated by the Coast Guard Inspector, and as follows: one each, port and starboard, in the boot-top area; and one each, port and starboard, below the boot-topping.
3.2.7.3.2 Ensure that the repair of all areas affected by the destructive Tooke Gauge inspection is included in the optional repair work item that is activated by the result of the inspection.
4. NOTES
4.1 Definitions.
4.1.1 "Partial – Condition A”: The condition that exists where the substrate is exposed in up to 33% of the entire U/W body.
4.1.2 "Partial - Condition B": The condition that exists where the anticorrosive (AC) undercoating system has incurred damage, but, the u/w body hull substrate is not exposed in any location.
4.1.3 "Partial - Condition C”: The condition that exists where damage is confined to the antifoulant (AF) topcoating; the epoxy undercoating system is not exposed in any location.
4.1.4 "100%”: The condition that exists where more than 33% of the U/W body hull substrate is exposed.
4.2 UWHIB convention. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.
11010_UT_0712_FLT
REC_11010_UT_FLT_175’ WLM (ALL) (0911)
WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to conduct ultrasonic testing (UT) of U/W hull plating.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Other References
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
· 3.2 (UT measurements).
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 UT measurements. The Contractor shall perform a total of 300 UT measurements of U/W hull surfaces, in locations designated by the Coast Guard Inspector, using Coast Guard Drawings 175 WLM 801-006 and 175 WLM 801-019 for guidance, in accordance with SFLC Std Spec 0740, Appendix C. Mark up a copy of Coast Guard Drawing 175 WLM 801-019 to show all locations selected for measurement and record all measurements in Table I (UT Measurements Summary Sheet - Port/Stbd Shell) provided at the end of this item. Submit A CIR, to also include the marked up drawing and completed Table I.
4. NOTES
4.1 UT Table. Table 1 provided below is for the recording of all UT measurements.
Table 1 - UT MEASUREMENTS SUMMARY SHEET PORT/STBD SHELL
| SHOT # |
| STRAKE # |
| FWD/MID/AFT |
| ORIG PL |
| MEASURED PL |
| PERCENT |
| PLATE # |
| TOP/MID/BOT |
| THICKNESS |
| THICKNESS |
| WASTAGE |
11400_0415_FLT
REC_11400_UWAppndgs_FLT_175’ WLM (ALL) (1111) WORK ITEM 3: Appendages (U/W), Leak Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform leak test of the U/W appendages.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages Coast Guard Drawing 175 WLM 184-001, Rev-, V850 Transducer Adapter Ring Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Other References
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An)
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
· 3.2 Leak test particulars.
· 3.4 Appendage air test.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Leak test. In the presence of the Coast Guard Inspector, the Contractor shall accomplish the following tasks for all appendages as designated in Table 1 below, using the Coast Guard drawings listed in Section 2 (References) as guidance:
· Remove and dispose of the existing drain plugs.
· Submit a CIR noting any liquids draining from any of the…