MACKINAW_(WLBB_240)_PAINT_SECTIONBAMEND0002.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- PRESERVATION MAINTENANCE FOR THE CGC MACKINAW
- Solicitation number
- HSCG85-16-Q-P30A78
About this file
SECTION B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMEND0002MACKPAINT.doc | DOC document | |
| MACKINAW_(WLBB_240)PAINTSECTIONBAMEND001.xlsx | XLSX spreadsheet | |
| MACKINAWPAINTAMEND0001.doc | DOC document | |
| MACKINAW_(WLBB_240)_PAINT.pdf | ||
| MACKINAW_PAINT_FY16SOLICITATION.docx | DOCX document | |
| MACKINAW_(WLBB_240)_PAINT_SECTIONB.xlsx | XLSX spreadsheet | |
| MACKINAWPAINTSPEC.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MACK PAINT REQ FY17-FY21 IGE
| CLIN | Item Description | Unit | IGE Unit Price | Quantity | IGE Extended Price |
| O-001A | Weather Deck Surfaces - Level 1 (100 sqft, Continuous) - Critical-Coated Surfaces | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-001B | Weather Deck Surfaces - Level 1 (500 sqft, Continuous) - Critical-Coated Surfaces | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-001C | Weather Deck Surfaces - Level 2 (100 sqft, Continuous) - Critical-Coated Surfaces | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-001D | Weather Deck Surfaces - Level 2 (500 sqft, Continuous) - Critical-Coated Surfaces | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-003 | Hull Plating (Buoy Port Areas), Preserve | JOB | |||
| Base Year | 1 | 0.00 | |||
| Option Year 1 | 1 | 0.00 | |||
| Option Year 2 | 1 | 0.00 | |||
| Option Year 3 | 1 | 0.00 | |||
| Option Year 4 | 1 | 0.00 | |||
| O-004A | Freeboard Surfaces Preserve – “Partial” - Level 1 (100 sqft, Continuous) - Critical-Coated Surfaces | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-004B | Freeboard Surfaces Preserve – “Partial” - Level 1 (500 sqft, Continuous) - Critical-Coated Surfaces | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-007A | Main Mast Surfaces - Level 1 (50 sqft, Continuous) | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-007B | Main Mast Surfaces - Level 1 (100 sqft, Continuous) | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-008A | Superstructure Surfaces Preserve, 100% - Level 2 (100 sqft, Continuous) - Critical-Coated Surfaces | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-008B | Superstructure Surfaces Preserve, 100%- Level 2 (500 sqft, Continuous) - Critical-Coated Surfaces | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-009A | Superstructure Surfaces Preserve “Partial”- Level 1 (100 sqft, Continuous) - Critical-Coated Surfaces | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-009B | Superstructure Surfaces Preserve “Partial” - Level 1 (500 sqft, Continuous) - Critical-Coated Surfaces | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-011 | Stack Surfaces (Exterior), Preserve – “100%”- Level 1 (100 sqft, Continuous) | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-012A | Miscellaneous Ship Structures, Preserve Deck Fitting (Bouy & Non-Bouy Deck) - Level 1 | JOB | |||
| Base Year | 5 | 0.00 | |||
| Option Year 1 | 5 | 0.00 | |||
| Option Year 2 | 5 | 0.00 | |||
| Option Year 3 | 5 | 0.00 | |||
| Option Year 4 | 5 | 0.00 | |||
| O-012C | Miscellaneous Ship Structures, Preserve Machinery, Exterior - Level 1 (10 sqft, Continuous) | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-012D | Miscellaneous Ship Structures, Preserve Machinery, Exterior - Level 1 (100 sqft, Continuous) | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-012G | Miscellaneous Ship Structures, Preserve Machinery, Interior - Level 1 (10 sqft, Continuous) | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-012H | Miscellaneous Ship Structures, Preserve Machinery, Interior - Level 1 (100 sqft, Continuous) | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-012L | Miscellaneous Ship Structures, Preserve Railing and Stanchion - Level 1 (10 lnft, continuous) | JOB | |||
| Base Year | 16 | 0.00 | |||
| Option Year 1 | 16 | 0.00 | |||
| Option Year 2 | 16 | 0.00 | |||
| Option Year 3 | 16 | 0.00 | |||
| Option Year 4 | 16 | 0.00 | |||
| O-012M | Miscellaneous Ship Structures, Preserve Railing and Stanchion - Level 1 (100 lnft, continuous) | JOB | |||
| Base Year | 4 | 0.00 | |||
| Option Year 1 | 4 | 0.00 | |||
| Option Year 2 | 4 | 0.00 | |||
| Option Year 3 | 4 | 0.00 | |||
| Option Year 4 | 4 | 0.00 | |||
| O-012N | Miscellaneous Ship Structures, Preserve Railing and Stanchion - Level 1 (500 lnft, continuous) | JOB | |||
| Base Year | 1 | 0.00 | |||
| Option Year 1 | 1 | 0.00 | |||
| Option Year 2 | 1 | 0.00 | |||
| Option Year 3 | 1 | 0.00 | |||
| Option Year 4 | 1 | 0.00 | |||
| O-012Q | Miscellaneous Ship Structures, Preserve Bulkhead and Overhead Surfaces (Un-insulated), and Door - Level 2 (100 sqft, Continuous) | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-012R | Miscellaneous Ship Structures, Preserve Bulkhead and Overhead Surfaces (Un-insulated), and Door - Level 2 (500 sqft, Continuous) | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-012S | Miscellaneous Ship Structures, Preserve Bulkhead and Overhead Surfaces (Un-insulated), and Door - Level 1 (100 sqft, Continuous) | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-012T | Miscellaneous Ship Structures, Preserve Bulkhead and Overhead Surfaces (Un-insulated), and Door - Level 1 (500 sqft, Continuous) | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-012U | Miscellaneous Ship Structures, Preserve Bulkhead and Overhead Surfaces (Un-insulated), in Wet Spaces - Level 1 (100 sqft, Continuous) | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-012V | Miscellaneous Ship Structures, Preserve Bulkhead and Overhead Surfaces (Un-insulated), in Wet Spaces - Level 1 (500 sqft, Continuous) | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-012W | Miscellaneous Ship Structures, Preserve Bulkhead and Overhead Surfaces (Un-insulated), in Wet Spaces - Level 2 (100 sqft, Continuous) | JOB | |||
| Base Year | 3 | 0.00 | |||
| Option Year 1 | 3 | 0.00 | |||
| Option Year 2 | 3 | 0.00 | |||
| Option Year 3 | 3 | 0.00 | |||
| Option Year 4 | 3 | 0.00 | |||
| O-012X | Miscellaneous Ship Structures, Preserve Bulkhead and Overhead Surfaces (Un-insulated), in Wet Spaces - Level 2 (500 sqft, Continuous) | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-012Y | Miscellaneous Ship Structures, Preserve Interior Deck Surfaces - Level 1 (100 sqft, Continuous) | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-012Z | Miscellaneous Ship Structures, Preserve Interior Deck Surfaces - Level 1 (500 sqft, Continuous) | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-012AC | Miscellaneous Ship Structures, Preserve Surfaces, Level 1 (10 sqft, Continuous) | JOB | |||
| Base Year | 10 | 0.00 | |||
| Option Year 1 | 10 | 0.00 | |||
| Option Year 2 | 10 | 0.00 | |||
| Option Year 3 | 10 | 0.00 | |||
| Option Year 4 | 10 | 0.00 | |||
| O-012AD | Miscellaneous Ship Structures, Preserve Surfaces, Level 1 (50 sqft, Continuous) | JOB | |||
| Base Year | 5 | 0.00 | |||
| Option Year 1 | 5 | 0.00 | |||
| Option Year 2 | 5 | 0.00 | |||
| Option Year 3 | 5 | 0.00 | |||
| Option Year 4 | 5 | 0.00 | |||
| O-012AE | Miscellaneous Ship Structures,Preserve Surfaces, Level 1 (100 sqft, Continuous) | JOB | |||
| Base Year | 5 | 0.00 | |||
| Option Year 1 | 5 | 0.00 | |||
| Option Year 2 | 5 | 0.00 | |||
| Option Year 3 | 5 | 0.00 | |||
| Option Year 4 | 5 | 0.00 | |||
| O-012AF | Miscellaneous Ship Structures, Preserve Surfaces, Level 1 (500 sqft, Continuous) | JOB | |||
| Base Year | 1 | 0.00 | |||
| Option Year 1 | 1 | 0.00 | |||
| Option Year 2 | 1 | 0.00 | |||
| Option Year 3 | 1 | 0.00 | |||
| Option Year 4 | 1 | 0.00 | |||
| O-012AG | Miscellaneous Ship Structures, Preserve Surfaces, Level 2 (10 sqft, Continuous) | JOB | |||
| Base Year | 10 | 0.00 | |||
| Option Year 1 | 10 | 0.00 | |||
| Option Year 2 | 10 | 0.00 | |||
| Option Year 3 | 10 | 0.00 | |||
| Option Year 4 | 10 | 0.00 | |||
| O-012AH | Miscellaneous Ship Structures, Preserve Surfaces, Level 2 (50 sqft, Continuous) | JOB | |||
| Base Year | 2 | 0.00 | |||
| Option Year 1 | 2 | 0.00 | |||
| Option Year 2 | 2 | 0.00 | |||
| Option Year 3 | 2 | 0.00 | |||
| Option Year 4 | 2 | 0.00 | |||
| O-012AI | Miscellaneous Ship Structures, Preserve Surfaces, Level 2 (100 sqft, Continuous) | JOB | |||
| Base Year | 1 | 0.00 | |||
| Option Year 1 | 1 | 0.00 | |||
| Option Year 2 | 1 | 0.00 | |||
| Option Year 3 | 1 | 0.00 | |||
| Option Year 4 | 1 | 0.00 | |||
| O-013A | Machinery Space Bilges - Level 1 (100 sqft, Continuous) | JOB | |||
| Base Year | 4 | 0.00 | |||
| Option Year 1 | 4 | 0.00 | |||
| Option Year 2 | 4 | 0.00 | |||
| Option Year 3 | 4 | 0.00 | |||
| Option Year 4 | 4 | 0.00 | |||
| O-013B | Machinery Space Bilges - Level 1 (500 sqft, Continuous) | JOB | |||
| Base Year | 1 | 0.00 | |||
| Option Year 1 | 1 | 0.00 | |||
| Option Year 2 | 1 | 0.00 | |||
| Option Year 3 | 1 | 0.00 | |||
| Option Year 4 | 1 | 0.00 | |||
| O-014A | Tenting, Provide - Level 1 (100 Square Feet) | JOB | |||
| Base Year | 4 | 0.00 | |||
| Option Year 1 | 4 | 0.00 | |||
| Option Year 2 | 4 | 0.00 | |||
| Option Year 3 | 4 | 0.00 | |||
| Option Year 4 | 4 | 0.00 | |||
| O-014B | Tenting, Provide - Level 1 (500 Square Feet) | JOB | |||
| Base Year | 4 | 0.00 | |||
| Option Year 1 | 4 | 0.00 | |||
| Option Year 2 | 4 | 0.00 | |||
| Option Year 3 | 4 | 0.00 | |||
| Option Year 4 | 4 | 0.00 | |||
| O-015A | Preserve Shoreside Load Bank - Level 2 (10 Square Feet) | JOB | |||
| Base Year | 5 | 0.00 | |||
| Option Year 1 | 5 | 0.00 | |||
| Option Year 2 | 5 | 0.00 | |||
| Option Year 3 | 5 | 0.00 | |||
| Option Year 4 | 5 | 0.00 | |||
| O-015B | Preserve Shoreside Load Bank - Level 2 (100 Square Feet) | JOB | |||
| Base Year | 1 | 0.00 | |||
| Option Year 1 | 1 | 0.00 | |||
| Option Year 2 | 1 | 0.00 | |||
| Option Year 3 | 1 | 0.00 | |||
| Option Year 4 | 1 | 0.00 | |||
| O-016A | NACE inspector | Day | |||
| Base Year | 45 | 0.00 | |||
| Option Year 1 | 45 | 0.00 | |||
| Option Year 2 | 45 | 0.00 | |||
| Option Year 3 | 45 | 0.00 | |||
| Option Year 4 | 45 | 0.00 | |||
| O-016B | Compsite Labor Rate | HOUR | |||
| Base Year | 485 | 0.00 | |||
| Option Year 1 | 485 | 0.00 | |||
| Option Year 2 | 485 | 0.00 | |||
| Option Year 3 | 485 | 0.00 | |||
| Option Year 4 | 485 | 0.00 | |||
| O-017 | Stand-by Labor Rate | HOUR | |||
| Base Year | 100 | 0.00 | |||
| Option Year 1 | 100 | 0.00 | |||
| Option Year 2 | 100 | 0.00 | |||
| Option Year 3 | 100 | 0.00 | |||
| Option Year 4 | 100 | 0.00 |
| Total | Base Year | 0.00 |
| Option Year 1 | 0.00 | |
| Option Year 2 | 0.00 | |
| Option Year 3 | 0.00 | |
| Option Year 4 | 0.00 |
Total 0.00
File details come from the government source that posted it. Updated .