ATTACHMENT_2_-_Schedule_of_Prices_-_Final_(Rev1).doc

DOC document 39 KB Posted

Attached to
USCGC BERTHOLF (WMSL 750) Dockside FY15 FQ3
Solicitation number
HSCG85-15-R-P45546
Issued by

About this file

Attachment 2 - Schedule of Prices - Final (Rev1)

View the file

Other files

File Type Posted
Contract_Award_Notification_(DHS_2140-01)_(Signed).pdf PDF
0002.pdf PDF
0001.pdf PDF
Dockside_Repairs_FY15_FQ3.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF PRICES

B.1

DEFINITE ITEMS

These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.

ITEM NO.
DESCRIPTION
AMOUNT
D-01
Main Reduction Gear Turning Gear, Renew
DE-SCOPED
D-02
Ship Service Diesel Generator, Engine Top End Overhaul
$
D-03
Fixed CO2, FM 200 and Ansul R-102 Systems Annual Certification, Perform
$
D-04
Water Mist System Annual Inspection, Perform
$
D-05
Boat Davit and Winch Inspection and Overhaul
$
D-06
Boat Gantry Crane, Level 2 Inspect and Repair
$
D-07
Oily Water Separator, Overhaul
$
D-08
Vacuum Collection Holding Tank, Clean and Inspect
$
D-09
Flight Deck Net, Weight Testing
$
D-10
Temporary Services, Dockside, Home Pier
$
TOTAL AMOUNT OF ALL DEFINITE ITEMS
$

B.2

OPTIONAL ITEMS

All optional items O-11 through O-13 will be awarded if inspection reports reveal the necessity for activation, but before two weeks after the start of contract performance see Section 16, Page 14, entitled “Optional Items”

ITEM NO.
DESCRIPTION
AMOUNT
O-11
Vacuum Collection Holding Tank, Preserve “100”
$
O-12
Tanks (Water Mist), Preserve “Partial”
$
O-13
General Welding, Provide
$
TOTAL AMOUNT OF ALL OPTION ITEMS
$
TOTAL OF ALL DEFINITE AND OPTIONAL ITEMS
$

B.3

COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES

The following labor hour rate shall be used in pricing all contract changes in accordance with ATTACHMENT 3, Section 13, Page 11 entitled "COMPOSITE LABOR RATE.”

LABOR HOUR RATE

ESTIMATED QUANTITY

1235 hours

EXTENDED AMOUNT

**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.

File details come from the government source that posted it. Updated .