0001.pdf
PDF 65 KB Posted
- Attached to
- USCGC BERTHOLF (WMSL 750) Dockside FY15 FQ3
- Solicitation number
- HSCG85-15-R-P45546
About this file
Amendment (0001)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract_Award_Notification_(DHS_2140-01)_(Signed).pdf | ||
| 0002.pdf | ||
| ATTACHMENT_2_-_Schedule_of_Prices_-_Final_(Rev1).doc | DOC document | |
| Dockside_Repairs_FY15_FQ3.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 10MAR15 21-15-855P45546
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER, USCG
Surface Forces Logistics Center – Contract & Procurement Division 1301 Clay Street, Suite 807N Oakland, CA 94612
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
TO ALL PROSPECTIVE OFFERORS
HSCG85-15-R-P45546
X 9B. DATE (SEE ITEM 11)
10 FEBRUARY 2015
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: Solicitation No. HSCG85-15-R-P45546, USCGC BERTHOLF (WMSL 750) Dockside Repairs FY15 FQ3
See continuation pages
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
Solicitation No. HSCG85-15-R-P45546 CGC BERTHOLF (WMSL 750) Dockside Repairs FY15 FQ3 Amendment No. 0001
The purpose of this amendment is as follows:
1. To address the following clarification questions
D-01, (Main Reduction Gear Turning Gear, Renew) Q: Sumitomo rep. requests P/N and S/N of equipment involved. Can the government provide any additional information than that contained in the work item specification?
A: The requirement for a Sumitomo Tech Rep is a misprint. Services from a RENK tech rep will be required instead of Sumitomo. The complete turning gear unit is Renk #6460443. Spec directs the renewal of certain components of the unit. Renk part numbers of the individual components are listed in the spec.
D-06, Para 3.5.3 (Boat Gantry Crane, Level 2 Inspect and Repair) Q: Paragraph 3.5.3 states to renew brake pads that show wear over 50% during inspection. Will this renewal be the result of a contract mod via CFR or should the contractor price this action into the proposal?
A: Yes. The renewal of brake pads show greater than 50% wear will be covered under a contract mod via CFR.
D-06, Para 3.7.1 (Boat Gantry Crane, Level 2 Inspect and Repair) Q: Paragraph 3.7.1 states to provide and install new wire rope assemblies with hooks. The table under paragraph 1.2 lists 16 wire rope assemblies and 8 hook assemblies as GFM. Please clarify if the wire ropes and hooks are GFM or CFM?
A: Coast Guard will provide all items listed in the table under paragraph 1.2. Contractor is not to provide the items mentioned in paragraph 3.7.1.
O-12, Para 1.1 (Tanks (Water Mist), Preserve “Partial”) Q: Please clarify the intent of the work item. Is the contractor to quote a total of 100 SF that can be activated for each tank as often as the Coast Guard requires or is the price to reflect 100 SF for each tank for a total of 200 SF?
A: Paragraph 3.3.3 states in the last sentence “For bidding purposes, assume that 100 sq. ft. in each tank shall require preservation.”
D-05, Para 3.1.2 (Boat Davit and Winch Inspect and Overhaul) Q: Para 3.1.2 implies to have the Tech Rep “On Site” during the complete overhaul. Contractor request to have the OEM Tech Support on an “As Needed Basis”
A: Concur. Tech Rep does not need to be on-site during the entire overhaul period. “As Needed” on-site support is sufficient to meet the requirements of 3.1.2.
Solicitation No. HSCG85-15-R-P45546 CGC BERTHOLF (WMSL 750) Dockside Repairs FY15 FQ3 Amendment No. 0001
D-06, Para 3.1.2 (Boat Gantry Crane, Level 2 Inspect and Repair) Q: Para 3.1.2 implies to have the Tech Rep “On Site” during the complete overhaul. Contractor request to have the OEM Tech Support on an “As Needed Basis”
A: Concur. Tech Rep does not need to be on-site during the entire overhaul period. “As Needed” on-site support is sufficient to meet the requirements of 3.1.2. Requirement for on-site Tech Rep support described in paragraph 3.1.2.2 remains in effect.
D-10, Para 3.5 (Temporary Services, Dockside, Home Pier) Q: Please confirm CG requires Compressed Air? SFLC 0000 requires the Portable Sanitation Units to be pumped and cleaned daily, recent projects have indicated this level of frequency is excessive. Contractor request Pumped and Cleaned Twice a week? (Tuesday and Friday)
A: There is not a compressed air source available for use by the Contractor. If the Contractor requires compressed air to complete work, it must be provided by a Contractor-supplied air compressor. The Coast Guard does not require an air compressor for Coast Guard use during the performance period.
Twice-weekly cleanings (Tuesday/Friday) for the portable sanitation units should be sufficient.
However, the portable sanitation units must remain functional throughout the performance period, and excessive waste buildup due to less frequent cleanings (to an extent that renders the portable sanitation units unusable) must not occur.
D-13, Para 3.3 (General Welding,Provide) Q: Paragraphs 3.1 and 3.2 What is the space the welding is in? Contractor request adjacent spaces requiring Gas Free, Interference Removal, Paint restoration will be subject to CFR and a change order?
A: The intent is to activate this item in support of either (or both) Work Items 4 and 8. Work will be performed in either the water mist system tanks and/or the Vacuum Collection and Holding Tank.
Scope of work includes Marine Chemist visit to certify work area safe for welding (including boundary space). Interference removal and paint restoration will be handled via CFR/Change Request process.
The solicitation closing date is extended due to this amendment. Receipt of proposals are still now due no later than 13MAR15 @ 1400 Pacific time.