| Item No. |
| DESCRIPTION |
| Unit of Issue |
| Price |
| D-31 |
| Rudder Stock Lower Bearing Renewal |
| 1 JB |
| $ |
| D-32 |
| Rudder Assembly, Remove, Inspect and Reinstall |
| 1 JB |
| $ |
| D-33 |
| Thruster Unit (General), Overhaul |
| 1 JB |
| $ |
| D-34 |
| Anchor Chain(s) and Ground Tackle, Inspect and Repair |
| 1 JB |
| $ |
| D-35 |
| U/W Body, Preserve (Partial - Condition A) |
| 1 JB |
| $ |
| D-36 |
| Masts (Foremast and Mainmast), Preserve, 100% |
| 1 JB |
| $ |
| D-37 |
| Superstructure, Preserve “100%” |
| 1 JB |
| $ |
| D-38 |
| Cathodic Protection / Zinc Anodes, Renew |
| 1 JB |
| $ |
| D-40 |
| Temporary Services, Provide - Cutter |
| 1 JB |
| $ |
| D-41 |
| Lead Ballast Enclosing, Forward Pump Room |
| 1 JB |
| $ |
| D-42 |
| DC Stores Floor Plate Support Renewal |
| 1 JB |
| $ |
| D-43 |
| Bilges (Dc Stores) Preserve Partial |
| 1 JB |
| $ |
| D-44 |
| Commissary Stores, Bilge Preservation |
| 1 JB |
| $ |
| D-45 |
| Passageway 3-304-0-L, Bilge Preservation |
| 1 JB |
| $ |
| D-46 |
| Stern Tubes, UT Inspections and Repair |
| 1 JB |
| $ |
| D-47 |
| Sea Chest Structural Inspection and Preservation |
| 1 JB |
| $ |
| D-48 |
| Engine Room Bilge Preservation |
| 1 JB |
| $ |
| D-49 |
| Hull Plating (U/W Body), Inspect |
| 1 JB |
| $ |
| D-50 |
| Chain Locker, Preserve 100% |
| 1 JB |
| $ |
| D-51 |
| Sea Trial Performance, Provide Support |
| 1 JB |
| $ |
| D-52 |
| Bulkhead Plate Inspection and Renewal Lower Bosn Stores |
| 1 JB |
| $ |
| D-53 |
| Thruster Unit Hydraulic Accumulators, Inspect and Test |
| 1 JB |
| $ |
| D-55 |
| Diesel Oil Pump Room Bilge Preservation |
| 1 JB |
| $ |
| D-56 |
| Bow Propulsion Room Bilge Preservation |
| 1 JB |
| $ |
| D-57 |
| Decks - Exterior, Preserve (“MIL-Spec/Flight Deck” System) |
| 1 JB |
| $ |
| D-58 |
| Hull Plating Freeboard, Preserve -“100%” |
| 1 JB |
| $ |
| D-60 |
| Auxiliary Machine Shop/Tool Room Deck; Tank Top/Decking Steel Repairs |
| 1 JB |
| $ |
| D-62 |
| Stern Tube Interior Surfaces, Preserve 100% |
| 1 JB |
| $ |
| D-63 |
| Forward Pump Room, Preserve 100% |
| 1 JB |
| $ |
TOTAL AMOUNT OF DEFINITE ITEMS
CLIN 0002 – OPTIONAL ITEMS
Optional items listed below will be awarded if inspection reports reveal the necessity for activation, but before 30 January 2015, see Contract Clause (21) entitled “Optional Items”.
| Item No. |
| DESCRIPTION |
| Unit of Issue |
| Price |
| O-02 |
| Hull and Structural Plating (General) - 10.2 Pound Plate to 20.5 Pound Plate Steel, Repair |
| 1 JB |
| $ |
| O-04 |
| Appendages (U/W), Leak Test |
| 1 JB |
| $ |
| O-09 |
| Voids (Non-Accessible), Leak Test |
| 1 JB |
| $ |
| O-54 |
| Hull Plating (U/W Body) And Structural, Ultrasonic Testing |
| 1 JB |
| $ |
| O-59 |
| Lead-Based Paint, Perform Spot Abatement |
| 1 JB |
| $ |
| O-61 |
| Aluminum Plate Renewal |
| 1 JB |
| $ |
TOTAL AMOUNT OF OPTIONAL ITEMS
TOTAL AMOUNT OF DEFINITE & OPTIONAL ITEMS
CLIN 0003 - COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (17) entitled “COMPOSITE LABOR HOUR RATE.”
| LABOR HOUR RATE |
| ESTIMATED QUANTITY** |
| EXTENDED AMOUNT* |
| $__________ |
| per hour |
| 6,220 hours |
| $________________ |
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The proposed rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.
CLIN 0004 – LAY DAYS
Provide a price for dry dock Lay Days in accordance with HSAR 3052.217-94 (DEC 2003). The quoted price per day will apply to all lay days. The estimated quantity of 3 days is for evaluation purposes only.
PRICE PER DAY:
ADDENDA
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (MAY 2014)
(1) TIME OF PERFORMANCE: USCGC MORGENTHAU will be available for performance of the work under this contract during the period of 10 February 2015 through 08 May 2015. There is geographical restriction under this contract which states that the contractor will perform the contract within the West Coast of the United States, including Alaska and Hawaii.
(2)
PLACE OF PERFORMANCE
(1) All work under this contract will be performed at the Contractor’s provided dry-dock facility which has been certified in accordance with SFLC Standard Specification 8634, Jan 2009.
(2) The work to be performed on the cutter shall not be performed at any other location unless the Contracting officer approves a change in location in writing, in advance.
NOTE: The contractor must specify in the provision FAR 52.215-6 Place of Performance, the location of the facility where work is to be performed. If Contractor plans on using different shipyard, Contractor must state the location for the cutter will have the work performed. If this provision is not completed, the proposal may be considered non-responsive.
(3)
FAR 52.204-1 APPROVAL OF CONTRACT (DEC 1989)
This contract is subject to the written approval of the Section Chief, CPD, C&P2-LRE and shall not be binding until so approved.