ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES
Provide all labor, materials, facility, and equipment, except as specified, to perform Dockside Repairs of CGC BERTHOLF (WMSL 750) during the period of 30 November 2015 through 08 January 2016. All work will be performed at the cutter’s home moorage in Alameda, CA.
B.1
DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
| ITEM NO. |
| DESCRIPTION |
| AMOUNT |
| D-01 |
| Tanks, Clean and Inspect |
| $ |
| D-02 |
| Fixed CO2, FM 200 and Ansul R-102 Systems Annual Certification |
| $ |
| D-03 |
| Water Mist System, Annual Inspection and Biannual Discharge Test, Perform |
| $ |
| D-04 |
| Carriage and Centerline Winch, Inspection and Test |
| $ |
| D-05 |
| Flight Deck Net, Weight Testing |
| $ |
| D-06 |
| Tenting, Provide |
| DESCOPED |
| D-07 |
| Temporary Services, Dockside, Home Pier |
| $ |
| D-08 |
| Surfaces, Preserve |
| $ |
| D-09 |
| Deck Covering (Polymeric), Renew |
| $ |
| D-10 |
| Shower and Toilet Deck, Replace |
| $ |
| D-11 |
| Gasket (Sideport Shell Door), Renew |
| $ |
| D-12 |
| Deck (Slip-Resistant Sheet), Preserve |
| $ |
| D-13 |
| Ventilation Duct, Renew |
| $ |
| D-14 |
| Piping Insulation, Renew |
| $ |
| D-15 |
| Firemain Piping, Renew |
| $ |
| D-16 |
| Superstructure, Preserve (Partial) |
| DESCOPED |
| D-17 |
| Deck Covering (Polymeric), Seal |
| $ |
| TOTAL AMOUNT OF ALL DEFINITE ITEMS |
| $ |
B.2
OPTIONAL ITEMS
All optional items O-18 through O-21 will be awarded if inspection reports reveal the necessity for activation, but before 14 December 2015, see Section 16, Page 13, entitled “Optional Items”
| ITEM NO. |
| DESCRIPTION |
| AMOUNT |
| O-18 |
| General Welding, Provide |
| $ |
| O-19 |
| Tanks (JP-5), Preserve 100% |
| $ |
| O-20 |
| Tanks (Water Mist), Preserve 100% |
| $ |
| O-21 |
| Tanks (Water Mist), Preserve Partial |
| $ |
B.3
COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES
The following labor hour rate shall be used in pricing all contract changes in accordance with ATTACHMENT 3, Section 13, Page 11, entitled "COMPOSITE LABOR RATE.”
LABOR HOUR RATE
ESTIMATED QUANTITY
1600 hours
EXTENDED AMOUNT
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.