IDA_LEWIS_(WLM_551)_Blank_SoS.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- FY15 IDA LEWIS (WLM 551) DRYDOCK REPAIRS
- Solicitation number
- HSCG85-15-Q-P45P31
About this file
BLANK SOS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 175-WLM_635_1_1_-_F.txt | TXT text file | |
| Superstructure_Sketch_(2).png | PNG image | |
| IDA_LEWIS_Amendment_2_Questions.docx | DOCX document | |
| Amendment_2.pdf | ||
| IDA_LEWIS_RFQ_SF1449.doc | DOC document | |
| Amendment_1.pdf | ||
| IDA_LEWIS_RFQ.docx | DOCX document | |
| GOVERNMENT_PROPERTY_REPORT.docx | DOCX document | |
| IDA_LEWIS_(WLM_175)_DD_JCC_15R0_.docx | DOCX document | |
| Request_for_Clarification.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| BLANK SCHEDULE OF SUPPLIES |
| USCGC IDA LEWIS (WLM 551) DRYDOCK AVAILABILITY FY2015 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | SME Action | Date SME Done |
| D-001 | Hull Plating (U/W Body), Inspect | JOB | 1 | No | |||
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | No | |||
| D-003 | Appendages (U/W), Leak Test | JOB | 1 | No | |||
| O-004 | Appendages (U/W) - Internal, Preserve | JOB | 1 | No | |||
| D-005 | Chain Lockers, Clean and Inspect | JOB | 1 | No | |||
| D-006 | Tanks (MP Fuel Stowage and Overflow), Clean and Inspect | JOB | 1 | No | |||
| D-007 | Voids (Non-Accessible), Leak Test | JOB | 1 | No | |||
| O-008 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | 1 | No | |||
| D-009 | Tanks (Hydraulic Oil Stowage and Service), Clean and Inspect | JOB | 1 | No | |||
| D-010 | Tanks (Dirty Oil and Waste), Clean and Inspect | JOB | 1 | No | |||
| D-011 | Z-Drive Propulsion Units, Overhaul | JOB | 1 | No | |||
| D-012 | SW Heat Exchangers, Clean, Inspect and Hydro | JOB | 1 | No | |||
| D-013 | Fathometer Transducer, Renew | JOB | 1 | No | |||
| D-014 | Sea Bay, Clean and Inspect | JOB | 1 | No | |||
| D-015 | Thruster Unit (General), Overhaul | JOB | 1 | No | |||
| D-016 | Anchor Windlass, Inspect and Service | JOB | 1 | No | |||
| D-017 | Anchor Chain(s) and Ground Tackle, Inspect and Repair | JOB | 1 | No | |||
| D-018 | Grey Water Holding and Collection Tank(s), Clean and Inspect | JOB | 1 | No | |||
| D-019 | Sewage Holding and Vacuum Collection Tank(s), Clean and Inspect | JOB | 1 | No | |||
| D-020 | Sewage and Grey Water Piping, Clean and Flush | JOB | 1 | No | |||
| O-021 | Tanks (Ballast), Preserve “Partial” | JOB | 1 | No | |||
| D-022 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | No | |||
| O-023 | U/W Body, Preserve (100%) | JOB | 1 | No | |||
| O-024 | U/W Body, Preserve (Partial - Condition A) | JOB | 1 | No | |||
| O-025 | U/W Body, Preserve (Partial - Condition B) | JOB | 1 | No | |||
| O-026 | U/W Body, Preserve (Partial - Condition C) | JOB | 1 | No | |||
| D-027 | Hull Plating Freeboard, Preserve - Partial | JOB | 1 | No | |||
| D-028 | Superstructure, Preserve “Partial” | JOB | 1 | No | |||
| O-029 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | No | |||
| D-030 | Drydock | JOB | 1 | No | |||
| D-031 | Temporary Services, Provide - Cutter | JOB | 1 | No | |||
| D-032 | Sea Trial Performance, Support, Provide | JOB | 1 | No | |||
| D-033 | M240 Gun Mounts, Ready Service Locker, and Ammunition Stowage Box, Install | JOB | 1 | No | |||
| D-034 | Propulsion Shaft Bulkhead Seals, Upgrade | JOB | 1 | No | |||
| D-035 | Power Assisted Griping System, Remove | JOB | 1 | No | |||
| O-036 | Tanks (Dirty Oil and Waste), Preserve “Partial” | JOB | 1 | No | |||
| D-037 | Z-Drive Propulsion Unit, Renew (Drydock) | JOB | 1 | No | |||
| D-038 | Tanks (Ballast), Clean and Inspect | JOB | 1 | No | |||
| D-039 | Underwater (Speed) Log Transducer(s), Renew | JOB | 1 | No | |||
| O-040 | Sea Bay, Preserve 100% | JOB | 1 | No | |||
| D-041 | Bilges (Machinery Space), Preserve – Partial | JOB | 1 | No | |||
| D-042 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | No | |||
| D-043 | Deck Tie Down, Renew | JOB | 1 | No | |||
| D-044 | Buoy Deck Aft Ladder Handrails and Stanchions, Renew | JOB | 1 | No | |||
| D-045 | Watertight Doors and Hatch (External), Renew | JOB | 1 | No | |||
| D-046 | 02 Level Vent Space Deck Coaming , Renew | JOB | 1 | No | |||
| D-047 | Hull Plating, Repair | JOB | 1 | No | |||
| D-048 | Sewage Deck Connections, Repair | JOB | 1 | No | |||
| D-049 | Remote Cutoff Valve, Renew | JOB | 1 | No | |||
| D-050 | J-Bar Davit, Service and Inspect | JOB | 1 | No | |||
| D-051 | Condensing Unit, Renew | JOB | 1 | No | |||
| D-052 | Weather Deck Drain, Install | JOB | 1 | No | |||
| D-053 | Buoy Deck Cleats, Modification | JOB | 1 | No | |||
| D-054 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | No | |||
| D-055 | Deck Covering (Interior Wet), Renew | JOB | 1 | No | |||
| D-056 | Bilges (Machinery Space), Preserve – 100% | JOB | 1 | No | |||
| D-057 | Superstructure Surfaces (Pilothouse Catwalk Structural Mounts), Preserve | JOB | 1 | No | |||
| D-058 | Anchor Chain Stoppers and Guides, Renew | JOB | 1 | No | |||
| D-059 | Weather Deck Stuffing Tubes, Renew | JOB | 1 | No | |||
| O-00A | Composite Labor Rate | Hour | 1670 | 0 | |||
| D-00B | GFP Report | NSP | EA | NSP | |||
| O-00Z | Laydays | Day | 5 | $0.00 | |||
| Total Price of Definite Items | $0.00 | ||||||
| Total Price of Option Items | $0.00 | ||||||
| Total Price of Definite and Optional Items | $0.00 |
(7/1/2015)_x000D_ Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .