IDA_LEWIS_Amendment_2_Questions.docx
DOCX document 13 KB Posted
- Attached to
- FY15 IDA LEWIS (WLM 551) DRYDOCK REPAIRS
- Solicitation number
- HSCG85-15-Q-P45P31
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 175-WLM_635_1_1_-_F.txt | TXT text file | |
| Superstructure_Sketch_(2).png | PNG image | |
| Amendment_2.pdf | ||
| IDA_LEWIS_RFQ_SF1449.doc | DOC document | |
| Amendment_1.pdf | ||
| IDA_LEWIS_(WLM_551)_Blank_SoS.xlsx | XLSX spreadsheet | |
| IDA_LEWIS_RFQ.docx | DOCX document | |
| GOVERNMENT_PROPERTY_REPORT.docx | DOCX document | |
| IDA_LEWIS_(WLM_175)_DD_JCC_15R0_.docx | DOCX document | |
| Request_for_Clarification.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDA LEWIS
HSCG85-15-Q-P45P31
Amendment 2 Questions
WI-15
Question:
1.2 GFE stands for (9) Zinc supplied by Government
3.5 Zinc Renewal stands for Contractor supplies zincs Please clarify.
Answer:
The government will supply the zincs as GFE. The contractor does not supply zincs for the renewal.
WI-28
Question:
4. NOTES.
4.1 Definition of superstructure. For the purposes…. …..as shown in sketch provided below. Please provide sketch.
Answer: Please see attached for the sketch.
Question: 4.2 Unit’s Responsibility. Unit crew installs new decals, compartment check off holders and name plates.
Who is supplying those? If Contractor has to supply then, please provide information (qty, size, type, etc.)
Answer: Everything is the Unit's Responsibility. The Contractor does not need to supply.
WI-30
Question: Solicitation request only Drydock Certifications to be submitted with Bid Offer; WI 30 request pre-award calculations and Spec 8634 also request Dockmaster's resume’. Please clarify.
Answer: The Contractor needs to follow the specification along with SFLC Std Spec 8634. Dockmaster’s resume’ along with pre-award calculations will be needed.
WI-37
Question: 4.1 When the new clutches are introduced, besides the pressure reducer being added to provide the required 85psig air, Cutter must ensure that the required console changes and solenoid switch adjustments also occur. Contact IBCT-PL if additional information is required.
Please, explain required console changes and solenoid switch adjustments that might occur. Provide contact point.
Answer: The new clutches operate with 85psi vs. the old style which operates at 125psi. When installation of the new style clutch occurs, the Rolls Royce Tech Rep needs to adjust the Air Solenoids and the MPCMS values changed. This is a known occurrence that the Tech Reps have had to do when receiving the new style clutches, Cutters have already completed this; however, it is a reminder just in case this has not been done. If there are any questions when this occurs, the contractor can engage the PL and the PL will direct accordingly.
WI-46
Question: Provide Sheets 18-29 of Dwg 635-001, Rev F.
Pages 18-29 are a supplemental attachment to sheet 1 which is attached.
WI-48
Question: 3.5 Piping Renew/Repair...located in Main Deck.
Shouldn’t it be read ‘located on 01 Deck’? Please clarify.
Answer: The Sewage piping and deck connection is located on the Main Deck.