HOLLYHOCKDSSPECS.doc
DOC document 6 MB Posted
- Attached to
- DOCKSIDE REPAIRS FOR USCGC HOLLYHOCK Federal contract opportunity
- Solicitation number
- HSCG85-15-Q-P45B21
About this file
SPECIFICATIONS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HOLLYHOCK___HSCG85-15-Q-P45B21_-_Amendment_00003.docx | DOCX document | |
| HOLLYHOCK_(WLB_225B)_DS_FQ3_MJW_15Rev1.docx | DOCX document | |
| HOLLYHOCK___HSCG85-15-Q-P45B21_-_Amendment_00002.docx | DOCX document | |
| AMEND0001.doc | DOC document | |
| HOLLYHOCKDSSECTB.xls | XLS spreadsheet | |
| USCGCHOLLYHOCK420DSFY15.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC HOLLYHOCK (WLB 214)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2015
Developed By: Michael J Watson (REV-0, 23 February 2015)
TABLE OF CONTENTS
iiiRevisions Record ivConsolidated List of References viiiConsolidated List of Government-furnished Property xiiiConsolidated List of Critical Inspection Items xivPrincipal Characteristics
1General Requirements
11WORK ITEM 1: Main Diesel Engine (MDE) Exhaust Stack Uptakes, Commercial Clean
14WORK ITEM 2: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean
17WORK ITEM 3: Circuit Breakers (60 Hz), Inspect and Test
21WORK ITEM 4: Vent Ducts (Engine and Motor Room All), Commercial Cleaning
24WORK ITEM 5: Vent Ducts (Galley and Pantry Room All), Commercial Cleaning
27WORK ITEM 6: Vent Ducts (Laundry Exhaust), Commercial Cleaning
29WORK ITEM 7: Potable Water Pneumatic Tank(s), Clean and Inspect
32WORK ITEM 8: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift
37WORK ITEM 9: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test
42WORK ITEM 10: Crossdeck Winches, Inspect and Service
48WORK ITEM 11: Hull Fittings (Mooring and Towing), Inspect and Test
51WORK ITEM 12: Single Point Davit - Slewing Arm, Inspect and Service
55WORK ITEM 13: Hydraulic Steering Cooler, Install
60WORK ITEM 14: Stack and Uptake Space, Install Safety Components
63WORK ITEM 15: Hydraulic Chain Stoppers, Inspect And Service
68WORK ITEM 16: Anchor Windlass, Inspect and Service
72WORK ITEM 17: Warping Capstan, Inspect and Service
75WORK ITEM 18: Twin Pivot Arm Davit, Inspect and Service
83WORK ITEM 19: Buoy Crane, Inspect and Service
92WORK ITEM 20: Main Diesel Engine, Mount Upgrade
118WORK ITEM 21: Crane Cab Weather tight Door Renew
121WORK ITEM 22: Tanks (Potable Water), Renew Sounding Tube Flange and Preserve “100%”
125WORK ITEM 23: Stack Lighting, Install
130WORK ITEM 24: WTD’s, Renew
133WORK ITEM 25: Hatch’s (Interior), Renew
137WORK ITEM 26: Exhaust Systems and Fan Mounts, Renew
141WORK ITEM 27: Potable Water regulating Valve and brazed type valve, Overhaul or Renew
144WORK ITEM 28: Bulkheads (Bow and Stern Thrusters), Preserve
146WORK ITEM 29: Main Diesel Engine, Mount Renewal
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225B WLB 259-001, Rev C, Combustion Intake & Exhaust Diagram
Coast Guard Drawing 225B WLB 259-006, Rev C, Combustion Intake & Exhaust A&D Hull Blocks 970 & 975
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram
Coast Guard Drawing 225B WLB 512-007, Rev B, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform
Coast Guard Drawing 225B WLB 532-002, Rev D, Potable Water Sys Dia
Coast Guard Drawing 225B WLB 551-001, Rev D, Compressed Air System Diagram
Coast Guard Drawing 225B WLB 573-009, Rev E, Bi-Dir Ch Stopper With Retractable Roller Stopper
Coast Guard Drawing 225B WLB 573-11, Rev -, ATON Tie Downs
Coast Guard Drawing 225B WLB 581-001, Rev C, Anchor Handling System Arrangement
Coast Guard Drawing 225B WLB 582-001, Rev -, Mooring and Towing A & D
Coast Guard Drawing 225B WLB 672-001, Rev C, Storerooms, Cargo Stowage and Ship Store Arrangement and Details
Coast Guard Drawing 225B WLB 901-003, Rev A, Hull Block 901 Block Assembly
Coast Guard Drawing 225B-WLB 233-1, Rev D, Propulsion Train Installation Drawing
Coast Guard Drawing 225B-WLB 256-001, Rev N; Seawater Cooling Sys Diagram
Coast Guard Drawing 225B-WLB 505-001, Rev D; General Requirements for Piping Systems
Coast Guard Drawing 225B-WLB 506-001, Rev B, Overflows, Air Escapes & Sndg Tubes Diagram
Coast Guard Drawing 225B-WLB 549-1, Rev -, Onboard Lubrication Requirements
Coast Guard Drawing 225B-WLB 561-005, Rev B; Steering Gear Heat Exchanger Replacement
Coast Guard Drawing 225B-WLB 573-2, Rev -, Weight Handling System Arrangement
Coast Guard Drawing 225B-WLB 320-001 Rev W, Electrical One-Line Diagram
Coast Guard Drawing 225B-WLB 330-007 Rev M, Lighting System 02 Level & Above Hull Block 960B/975 & 970 Partial
Coast Guard Drawing 225B-WLB 561-001, Rev D, Steering Gear Hydraulics Diagram
Coast Guard Drawing 225B-WLB 573-001, Rev G, Buoy Handling System Arrangement
Coast Guard Drawing 225B-WLB 671-001, Rev. F, Misc. Stowage Arrangement & Details
Coast Guard Drawing 225B-WLB 801-015, Rev B, Scantlings, Decks and Platforms
Coast Guard Drawing 225-WLB 320-010 Rev U, Power System Elementary Wiring Diagram oast Guard Drawing 225-WLB 601-001, Rev T, General Arrangements, Inboard and Outboard Profiles
Coast Guard Drawing 225-WLB-623-001, Rev G, Ladders - Vertical
Coast Guard Drawing 225-WLB-970-001, Rev H, Hull Block 970 Panels
Coast Guard Drawing 225-WLB-970-002, Rev H, Hull Block 970 Modules
Coast Guard Drawing FL-1602-89, Rev -, Fleet 26" X 66" Weather tight Door (Supersedes 1602-48)
Coast Guard Drawing FL-1702-11, Rev -, Inspection of Sheaves
Coast Guard Fleet Drawing FL-2605-29, Rev H, Chain Stopper System – Rising Sheave Assembly
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3762, 15-OCT-04, Dual Point Davit - ATON Workboat - Model TWPIV5-0A 5
(if galley hood is being cleaned) Coast Guard Technical Publication (TP) 3796, Section A, Aug 2006, Galley Hood – Model NBDL-60 (13’-4”)
Coast Guard Commandant Instruction (COMDTINST)_MI0360.3 (series), Coatings and Color Manual
Coast Guard Technical Publication (TP) 3518B, 07-MAY-01, Main Diesel Engine (MDE) - Model 3608/1
Coast Guard Technical Publication (TP) 3523B, May 2001; Coupling, Torsional (Flexible), Manufacturer: American Vulkan, Model NO. RATO-S 3321-2100/1070 (Rev B)
Coast Guard Technical Publication (TP) 3534A, 07-JAN-97, Switchboards, Ship Service and Emergency Diesel Generator - Model D2
Coast Guard Technical Publication (TP) 3534B, 07-JAN-97, Switchboards, Ship Service and Emergency Diesel Generator - Model D2
Coast Guard Technical Publication (TP) 3555, Jan 2012, Steering Gear Systems
Coast Guard Technical Publication (TP) 3557, Section 573-C, Feb 2010, Manufacturer's Instruction Book-SWBS Group 568-573, Buoy Crane – Model EB-480-60-40 (Hulls 206, 207, 208, 209, 210, 211, 212, 213, 214, 215, 216)
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS Group(s) 573, Section B, Cross Deck Winch – Model BMD-471
Coast Guard Technical Publication (TP) 3559, SWBS 581B, Jan 1997, Anchor Windlass, P/S - Model BMD-478
Coast Guard Technical Publication (TP) 3559, Section 582B, Apr 2009, Aft Capstan, 21” - Model BMD-475
Coast Guard Technical Publication (TP) 3562, Sep 2013, Manufacturer's Instruction Book SWBS Groups 583-589, Section A, Davit, RHIB P/S – Model RAD30-15.5
Coast Guard Technical Publication (TP) 3750, SWBS 573-A, Dec 2012, Rising Sheave Chain Stopper
Coast Guard TCTO WLB-225-TB6020, Rev D, Replacement/Installation of Selected WTH & QAWTS to Support SCBA Install
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0085 (SFLC Std Spec 0085), 2014, General Requirements for Drawing Preparation
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC Electrical Motors
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects
American Society for Testing and Materials (ASTM) International F1508, 2010, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and Welding End
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Determination of Metals
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health Standards
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 33 CFR, Jul 2013, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment
Code of Federal Regulations (CFR) Title 49, Oct 2013, Transportation
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-PRF-900, Mar 1991, Rubber Gasket Material, 45 Durometer Hardness
MIL-STD-2003-3, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships & Submarines (Penetrations)
MIL-STD-2003-4, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships & Submarines (Cableways)
National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 9 |
| N |
| Hand Pump SS |
| PN: YMD-0541-SS |
| 1 ea |
| 1,476.00 |
| 9 |
| N |
| Pressure Guage - Model BMD-471 |
| PN: YMD-6822 |
| 4 ea |
| 123.00 |
| 9 |
| N |
| Wire rope Asssembly |
| PN: YMD-6654 |
| 4 ea |
| 1287.00 |
| 9 |
| N |
| Hydraulic brake repair kit - Model BMD-471 |
| PN: YMD-8191-R |
| 4 kit. |
| 546.00 |
| 9 |
| N |
| Counter balance valve - Model BMD-471 |
| PN: Sun CBEA-LHN |
| 4 ea. |
| 150.00 |
| 9 |
| N |
| **Shuttle valve - Model BMD-471 |
| PN: Sun CSAD-XXN |
| 4 ea. |
| 41.00 |
| 9 |
| N |
| Needle valve - Model BMD-471 |
| PN: Sun NFDC-KAN |
| 4 ea. |
| 82.00 |
| 9 |
| N |
| Hydraulic motor seal kit - Model BMD-471 |
| PN: YMD-8190-R |
| 4 kit. |
| 84.00 |
| 9 |
| N |
| Clutch shoe - Model BMD-471 |
| PN: MMD-2152 |
| 4 ea. |
| 33.00 |
| 9 |
| N |
| Drum bushing - Model BMD-471 |
| PN: MMD-3189 |
| 4 ea. |
| 143.00 |
| 9 |
| N |
| Shaft bushing - Model BMD-471 |
| PN: MMD-3190 |
| 4 ea. |
| 298.00 |
| 9 |
| N |
| ** Gear box Seal kit(for Winch Gearbox Assemblies) - Model BMD-471 |
| PN: YMD-8194-R |
| 4kit. |
| 135.00 |
| 9 |
| N |
| Control station repair parts |
| PN: YMD-8193-R |
| 4 ea. |
| 438.00 |
| 10 |
| N |
| Manifold replacement parts |
| PN: YMD-8192-R |
| 4 kit |
| 359.00 |
| 10 |
| N |
| Flag Block Bearing |
| PN: B54361 |
| 2 ea. |
| 180.00 |
| 10 |
| N |
| Flag Block Bearing Cup, Sheave |
| PN: 851547 |
| 2 ea. |
| 231.00 |
| 10 |
| N |
| Flag Block Bearing Cone, Sheave |
| PN: 827112 |
| 2 ea. |
| 182.00 |
| 10 |
| N |
| Flag Block Grease Seal |
| PN: 840503 |
| 2 ea. |
| 84.00 |
| 12 |
| N |
| Swing Brake Seal Kit |
| PN: YMD-6644 (Eskridge, Inc) |
| 2 ea |
| 1,875.00 |
| 12 |
| N |
| Swing Brake Disc & Bearing Kit |
| NSN 3010-01-464-1040 |
| 2 ea. |
| 178.00 |
| 12 |
| N |
| Counterbalance Valve |
| PN: YMD-3763 (Eskridge, Inc) |
| 1 ea. |
| 700.00 |
| 12 |
| N |
| Shuttle Valve |
| PN: YMD-1288 (Eskridge, Inc) |
| 1 ea. |
| 35.00 |
| 12 |
| N |
| Accumulator Assembly |
| NSN: 01-225-4010 |
| 1 ea. |
| 12850.00 |
| 13 |
| N |
| Heat Exchanger (37”x12” and 4” thick) |
| ITT Model P7A-8-TK |
| 2 |
| 10,000.00 |
| 13 |
| N |
| Thermostatic Valve |
| AMOT Model CM – Bronze Body 1-7/8” -12 |
| 2 |
| 1,500.00 |
| 13 |
| N |
| Test Cuopler, 1-5/8” x 20 Type SMK Connection S.S |
| 2030-01-F12-2646 SMK20-JIC1/4-VK-V4a |
| 2 |
| $800.00 |
| 13 |
| N |
| Valve, Calibrated Flow |
| 4820-01-467-1807 / 2352-1241SW |
| 1 |
| $4,500.00 |
| 13 |
| n |
| Valve, Relief 1-1/4 in |
(65 PSI S.S.)
| 4820-01-F12-2742 / FVSS-6R/3SS/WS-65 |
| 1 |
| $1500.00 |
| 15 |
| N |
| Repair Kit Assembly |
| NSN: 2040-01-496-9418 |
| 2 ea. |
| 1,409.15 |
| 15 |
| N |
| Rod Seal Repair Kit (FL-2605-29 PC#37) |
| NSN: 2040-01-496-9422 |
| 2 ea. |
| 3,030.07 |
| 15 |
| N |
| Repair Kit, Cable Chain (Includes Pads) (FL-2605-29 PC#36) |
| NSN: 3020-01-538-0684 |
| 16 ea. |
| 800.00 |
| 15 |
| N |
| Cylinder Assembly Actuating, Linear |
| NSN: 3040-01-496-9424 |
| 2 ea. |
| 1,894.47 |
| 18 |
| N |
| Wire Rope Renewal Kit |
| NSN: 3950-01-F13-3314/892-02060 |
| 1 ea. |
| 5,302.00 |
| 18 |
| N |
| Check Winch Gearbox Oil Kit |
| NSN: 5330-01-F13-3315/892-02061 |
| 1 ea. |
| 64.00 |
| 18 |
| N |
| Hydraulic Fluid Filter Renewal Kit |
| NSN: 3950-01-F13-3316/892-02063 |
| 1 ea. |
| 2,108.00 |
| 18 |
| N |
| Main Winch Brake and Centrifugal Brake Inspection Kit |
| NSN: 3950-01-f13-3299/892-02064 |
| 1 ea. |
| 908.00 |
| 18 |
| N |
| Hydraulic Breather Replacement Kit |
| NSN: 4310-01-F13-3300/892-02065 |
| 1 ea. |
| 228.00 |
| 18 |
| N |
| Hydraulic Hose Replacement Kit |
| NSN: 4720-99-553-9143/892-02066 |
| 1 ea. |
| 1,600.00 |
| 18 |
| N |
| Roller |
| PN: 5190-2911 |
| 4 ea. |
| $478.00 |
| 18 |
| N |
| Sleeve |
| PN: 5202-7211 |
| 30 ea. |
| $229.00 |
| 18 |
| N |
| Bush |
| PN: 5202-7811 |
| 4 ea. |
| $472.00 |
| 18 |
| N |
| Bush |
| PN: 5202-7911 |
| 4 ea. |
| $472.00 |
| 18 |
| N |
| Cylinder Pin Bush |
| PN: 5202-8011 |
| 2 ea. |
| $846.00 |
| 18 |
| N |
| Arm Pivot Bush |
| PN: 5203-8911 |
| 4 ea. |
| $1,360.00 |
| 18 |
| N |
| Roller |
| PN: 5204-5111 |
| 2 ea. |
| $748.00 |
| 18 |
| N |
| Roller |
| PN: 5392-3311 |
| 4 ea. |
| $748.00 |
| 18 |
| N |
| Striker Arm |
| PN: 5416-4421 |
| 2 ea. |
| $1,183.10 |
| 18 |
| N |
| Saddle Type Hold Down Clip |
| PN: 5667-6521G |
| 26 ea. |
| $46.20 |
| 18 |
| N |
| Hex head set screw |
| PN: 609-08060 |
| 26 ea. |
| $41.04 |
| 18 |
| N |
| Hex Skt HD Capscrew |
| PN: 617-04045 |
| 16 ea. |
| $25.00 |
| 18 |
| N |
| Hex nut |
| PN: 629-00005 |
| 16 ea. |
| $20.00 |
| 18 |
| N |
| Plain Washer |
| PN: 647-00805 |
| 2 ea. |
| $12.00 |
| 18 |
| N |
| Internal Circlip |
| PN: 652-00100 |
| 1 ea. |
| $68.00 |
| 18 |
| N |
| Split Cotter Pin |
| PN: 679-38020 |
| 6 ea. |
| $122.00 |
| 18 |
| N |
| Split Cotter Pin |
| PN: 679-40032 |
| 20 ea. |
| $32.20 |
| 18 |
| N |
| Split Cotter Pin |
| PN: 679-40035 |
| 4 ea. |
| $19.55 |
| 18 |
| N |
| Split Cotter Pin |
| PN: 679-41063 |
| 2 ea. |
| $122.00 |
| 18 |
| N |
| Deep Groove Ball Bearing |
| PN: 7004-0055 |
| 30 ea. |
| $286.00 |
| 18 |
| N |
| Self-Lubricating Bearing |
| PN: 7500-1225 |
| 16 ea. |
| $229.00 |
| 18 |
| N |
| Oil seal |
| PN: 7967-0702 |
| 30 ea. |
| $154.00 |
| 18 |
| N |
| Limit Switch-Roller Lever |
| PN: 859-01070 |
| 4 ea. |
| $644.00 |
| 18 |
| N |
| Grease Nipple |
| PN: 889-01048 |
| 4 ea. |
| $40.00 |
| 18 |
| N |
| Label (AAJB) |
| PN: 5420-5811B |
| 1 ea. |
| $24.00 |
| 18 |
| N |
| Label (AAJB) |
| PN: 5420-5811E |
| 1 ea. |
| $24.50 |
| 18 |
| N |
| Male-Male Adaptor |
| PN: 894-12326 |
| 2 ea. |
| $18.75 |
| 1 |
| N |
| Bonded Washer |
| PN: 894-01701 |
| 2 ea. |
| $24.00 |
| 18 |
| N |
| Straight Connector (EO-2) |
| PN: 894-10033 |
| 2 ea. |
| $48.40 |
| 18 |
| N |
| Flow Control Valve |
| PN: 891-00493 |
| 1 ea. |
| $1,949.00 |
| 18 |
| N |
| Bonded Washer |
| PN: 894-11905 |
| 2 ea. |
| $417.40 |
| 18 |
| N |
| Male Stud Coupling |
| PN: 891-00492 |
| 2 ea. |
| $662.40 |
| 18 |
| N |
| Centrifugal Brake Shoe Assembly |
| PN: 2520-1901 |
| 6 ea. |
| $827.00 |
| 18 |
| N |
| Sleeve |
| PN: 5201-6111 |
| 1 ea. |
| $177.00 |
| 18 |
| N |
| Bush |
| PN: 5204-5011 |
| 1 ea. |
| $147.00 |
| 18 |
| N |
| Sleeve |
| PN: 5201-6111 |
| 1 ea. |
| $177.00 |
| 18 |
| N |
| Gasket |
| PN: 5405-6911 |
| 1 ea. |
| $178.00 |
| 18 |
| N |
| Pivot Plate |
| PN: 5421-8011 |
| 1 ea. |
| $537.00 |
| 18 |
| N |
| Heater Gasket |
| PN: 5431-7111 |
| 1 ea |
| $102.00 |
| 18 |
| N |
| Brake Shoe Assembly |
| PN: 5520-6301 |
| 1 ea. |
| $1940.00 |
| 18 |
| N |
| Brake Cylinder Seal Kit |
| PN: 892-01001 |
| 1 ea. |
| $623.00 |
| 18 |
| N |
| Hex Skt HD Capscrew |
| PN: 617-04005 |
| 4 ea. |
| $18.80 |
| 18 |
| N |
| Hex Nut |
| PN: 629-00016 |
| 8 ea. |
| $21.90 |
| 18 |
| N |
| Plain Washer |
| PN: 647-00810 |
| 1 ea. |
| $32.00 |
| 18 |
| N |
| Plain Washer |
| PN: 647-00816 |
| 8 ea. |
| $46.00 |
| 18 |
| N |
| Plain Washer |
| PN: 647-00820 |
| 2 ea. |
| $3.40 |
| 18 |
| N |
| Plain Washer |
| PN: 647-00830 |
| 4 ea. |
| $21.00 |
| 18 |
| N |
| External Circlip |
| PN: 651-10030 |
| 4 ea. |
| $83.00 |
| 18 |
| N |
| External Circlip |
| PN: 651-10045 |
| 1 ea. |
| $81.00 |
| 18 |
| N |
| External Circlip |
| PN: 651-10050 |
| 1 ea. |
| $84.00 |
| 18 |
| N |
| External Circlip |
| PN: 651-10060 |
| 1 ea. |
| $91.00 |
| 18 |
| N |
| External Circlip |
| PN: 651-10065 |
| 4 ea. |
| $98.00 |
| 18 |
| N |
| Internal Circlip |
| PN: 652-10052 |
| 1 ea. |
| $115.00 |
| 18 |
| N |
| Split Cotter Pin |
| PN:677-40025F |
| 6 ea. |
| $24.00 |
| 18 |
| N |
| Split Cotter Pin |
| PN: 679-40030 |
| 2 ea |
| $18.00 |
| 18 |
| N |
| Compression spring |
| PN: 683-00327 |
| 4 ea. |
| $66.20 |
| 18 |
| N |
| Deep Groove Ball Bearing |
| PN: 7004-0050 |
| 1 ea. |
| $429.50 |
| 18 |
| N |
| Deep Groove Ball Bearing |
| PN: 7004-0045 |
| 1 ea. |
| $270.00 |
| 18 |
| N |
| Deep Groove Ball Bearing |
| PN: 7004-0050 |
| 1 ea. |
| $429.50 |
| 18 |
| N |
| Cylindrical Roller Bearing |
| PN: 7106-0045 |
| 1 ea. |
| $344.00 |
| 18 |
| N |
| Cylindrical Roller Bearing |
| PN: 7106-0055 |
| 1 ea. |
| $364.00 |
| 18 |
| N |
| Dry Sliding Bearing |
| PN: 7500-0612 |
| 2 ea. |
| $274.00 |
| 18 |
| N |
| Dry Sliding Bearing |
| PN: 7500-1220 |
| 2 ea. |
| $296.00 |
| 18 |
| N |
| Dry Sliding Bearing |
| PN: 7500-1850 |
| 2 ea. |
| $297.00 |
| 18 |
| N |
| Dry Sliding Bearing |
| PN: 7500-2330 |
| 1 ea. |
| $330.00 |
| 18 |
| N |
| O-Ring |
| PN: 7960-0453 |
| 1 ea. |
| $72.00 |
| 18 |
| N |
| O-Ring |
| PN: 7960-0603 |
| 1 ea. |
| $94.00 |
| 18 |
| N |
| O-ring |
| PN: 7960-1803 |
| 2 ea. |
| $36.00 |
| 18 |
| N |
| Oil Seal |
| PN: 7967-0401 |
| 1 ea. |
| $154.00 |
| 18 |
| N |
| Oil-Seal |
| PN: 7967-0453 |
| 1 ea. |
| $179.00 |
| 18 |
| N |
| Oil-Seal |
| PN: 7967-0551 |
| 1 ea. |
| $169.00 |
| 18 |
| N |
| Oil-Seal |
| PN: 7967-1351 |
| 2 ea. |
| $242.00 |
| 18 |
| N |
| Limit Switch-Roller Lever |
| PN: 859-01070 |
| 1 ea. |
| $644.00 |
| 18 |
| N |
| Miniature Immersion Heater |
| PN:859-01333 |
| 1 ea. |
| $365.00 |
| 18 |
| N |
| Rod Type Thermostat |
| PN: 859-01334 |
| 1 ea. |
| $128.00 |
| 18 |
| N |
| Grease Nipple |
| PN: 889-01049 |
| 1 ea. |
| $40.00 |
| 18 |
| N |
| Flanged Plug |
| PN: 889-02006 |
| 2 ea. |
| $212.00 |
| 18 |
| N |
| Sealing Washer |
| PN: 889-02105 |
| 2 ea. |
| $487.00 |
| 18 |
| N |
| Bonded Washer |
| PN: 890-90003 |
| 1 ea. |
| $19.40 |
| 18 |
| N |
| Expanded PVC Strip Seal |
| PN: 830-00110 |
| 2 meters |
| $296.00 |
| 18 |
| N |
| Pilot Light |
| PN: 859-02506 |
| 2 ea. |
| $162.40 |
| 18 |
| N |
| Safety Block (W/Install Kit) |
| PN: 892-02067 |
| 1 ea. |
| $6,047.70 |
| 18 |
| N |
| Accumulator Bottle Complete |
| PN: 885-02012 |
| 2 ea. |
| $10,123.00 |
| 18 |
| N |
| Cushion Ring (FCH) |
| PN: 891-00460 |
| 2 ea. |
| $190.00 |
| 18 |
| N |
| Collar |
| PN: 5223-1311 |
| 1 |
| $617.50 |
| 18 |
| N |
| Hex Nut |
| PN: 629-00024 |
| 6 |
| $23.10 |
| 18 |
| N |
| Hex HD Setscrew |
| PN: 609-24070 |
| 4 ea. |
| $41.40 |
| 18 |
| N |
| Breather |
| PN: 894-00830 |
| 1 ea. |
| $463.00 |
| 18 |
| N |
| Suction Strainer |
| PN: 894-00926 |
| 1 ea. |
| $462.00 |
| 18 |
| N |
| Return Filter Element |
| PN: 891-00452 |
| 1 ea. |
| $891.00 |
| 18 |
| N |
| Immersion Heater |
| PN: 894-00839 |
| 1 ea. |
| $1,435.00 |
| 18 |
| N |
| Luff Cylinder Seal Kit |
| PN: 894-01309 |
| 2 ea. |
| $968.00 |
| 18 |
| N |
| Test Port |
| PN: 891-11905 |
| 4 ea. |
| ?? |
| 18 |
| N |
| Door Locks |
| PN: 859-04213 |
| 3 ea. |
| $136.00 |
| 18 |
| N |
| Fuse |
| PN: 859-05556 |
| 3 ea. |
| $21.00 |
| 18 |
| N |
| Fuse |
| PN: 859-06051 |
| 1 ea. |
| $18.90 |
| 18 |
| N |
| AC Fan Heater |
| PN: 859-06040 |
| 1 ea. |
| $917.60 |
| 18 |
| N |
| Fuse |
| PN: 859-04897 |
| 3 ea. |
| $21.30 |
| 18 |
| N |
| Fuse |
| PN: 859-06044 |
| 1 ea. |
| $11.60 |
| 18 |
| N |
| Inverter Keypad |
| PN: 860-02023 |
| 1 ea. |
| ?? |
| 18 |
| N |
| SKT C’Sunk Setscew |
| PN: 617-22008 |
| 6 ea. |
| $24.50 |
| 18 |
| N |
| Warning Label |
| 5490-2711 |
| 1 ea. |
| $105.26 |
| 18 |
| N |
| Hylomar |
| 850-01003 |
| 1 ea. |
| $46.00 |
| 18 |
| N |
| Marking Tag |
| PN: 859-02419 |
| 3 ea. |
| $15.00 |
| 18 |
| N |
| Swing Gear Gearbox Seal Kit |
| PN: YMD-6847-R |
| 5 ea. |
| 3,250.00 |
| 18 |
| N |
| Swing Gear Brake O-ring Kit |
| PN: 12-501-002 |
| 5 ea. |
| 1,235.00 |
| 18 |
| N |
| Swing Gear Brake Lining Kit |
| PN: 12-501-004 |
| 5 ea. |
| 3,085.00 |
| 18 |
| N |
| Swing Gear Brake Bearing Kit |
| PN: 12-501-006 |
| 5 ea. |
| 1,190.00 |
| 18 |
| N |
| Swing Gear Brake Spring Kit |
| PN: 12-501-008 |
| 5 ea. |
| 1,635.00 |
| 18 |
| N |
| Swing Gear Motor Seal Kit |
| PN: YMD-8258-R |
| 5 ea. |
| 845.00 |
| 18 |
| N |
| Manifold Replacement Valves |
| PN: YMD-8259-R |
| 1 ea. |
| 2,244.00 |
| 18 |
| N |
| Luff Cylinder Seal Kit |
| PN: YMD-8260-R |
| 2 ea. |
| 756.00 |
| 18 |
| N |
| Luff Cylinder Pin |
| PN: MMD-3214 |
| 4 ea. |
| 18 |
| N |
| Extension Cylinder Seal Kit |
| PN: YMD-8261-R |
| 1 ea. |
| 169.00 |
| 18 |
| N |
| Extension Cylinder Pin |
| PN: MMD-3216 |
| 2 ea. |
| 18 |
| N |
| Luff Cylinder Counterbalance Valve Cartridge |
| PN: YMD-9612 |
| 2 ea. |
| 694.00 |
| 18 |
| N |
| Extension Cylinder Counterbalance Valve Cartridge |
| PN: YMD-9612 |
| 2 ea. |
| 694.00 |
| 18 |
| N |
| Main Hoist Block Repair Kit |
| PN: YMD-8267-R |
| 1 ea. |
| 2,144.00 |
| 18 |
| N |
| Aux Hoist Block/ |
| PN: YMD-8268 |
| 1 ea. |
| 18 |
| N |
| Sheave Replacement Bearings |
| PN: YMD-8269-R |
| 4 ea. |
| 3,380.00 |
| 18 |
| N |
| Replacement Filter Elements |
| PN: YMD-6732-R |
| 12 ea. |
| 720.00 |
| 18 |
| N |
| Bushings |
| PN: MMD-2020 |
| 8 ea. |
| 344.00 |
| 18 |
| N |
| Bushings, Heel |
| PN: MMD-2875 |
| 4 ea. |
| 620.00 |
| 18 |
| N |
| Slid Pad, Cylinder Support |
| PN: MMD-2023 |
| 6 ea. |
| 66.00 |
| 18 |
| N |
| Shim Set, Cylinder Support |
| PN: MMD-2080 |
| 6 ea. |
| 66.00 |
| 18 |
| N |
| Slid Pad |
| PN: MMD-1922 |
| 4 ea. |
| 288.00 |
| 18 |
| N |
| Shim Set |
| PN: MMD-1921 |
| 4 ea. |
| 100.00 |
| 18 |
| N |
| Slid Pad |
| PN: MMD-1918 |
| 4 ea. |
| 120.00 |
| 18 |
| N |
| Shim Set |
| PN: MMD-1919 |
| 4 ea. |
| 100.00 |
| 18 |
| N |
| Slid Puck |
| PN: MMD-3291 |
| 4 ea. |
| 268.00 |
| 18 |
| N |
| Shim Set |
| PN: WMD-2459 |
| 4 ea. |
| 28.00 |
| 18 |
| N |
| Thrust Washer |
| PN: WMD-1100 |
| 8 ea. |
| 96.00 |
| 18 |
| N |
| Thrust Washer |
| PN: MMD-1363 |
| 4 ea. |
| 504.00 |
| 18 |
| N |
| Snap ring |
| PN: WSM-700-S02 |
| 4 ea. |
| 500 |
| 18 |
| N |
| Anti-Two Block Limit Switch |
| PN: YMD-7378 |
| 2 ea. |
| 394.00 |
| 18 |
| N |
| Grease Fitting |
| PN: YMD-6033 |
| 18 ea. |
| 162.00 |
| 18 |
| N |
| Clamp Seal |
| PN: MMD-3280 |
| 1 ea. |
| 12.00 |
| 18 |
| N |
| Clamp Seal |
| PN: MMD-3279 |
| 1 ea. |
| 12.00 |
| 18 |
| N |
| Slide Pad |
| PN: MMD-3288 |
| 2 ea. |
| 226.00 |
| 18 |
| N |
| Slide pad |
| PN: MMD-3294 |
| 2 ea. |
| 142.00 |
| 18 |
| N |
| Electric Connection |
| PN: YMD-5956 |
| 18 ea. |
| 576.00 |
| 18 |
| N |
| Sealing Washers |
| PN: YMD-1828 |
| 8 ea. |
| 8.00 |
| 18 |
| N |
| Emergency Release Manifold Cartridge |
| PN: YMD-6895-R |
| 3 ea. |
| 639.00 |
| 18 |
| N |
| Gauge Snubber |
| PN: YMD-6201 |
| 2 ea. |
| 90.00 |
| 18 |
| N |
| Shuttle Valve |
| PN: YMD-1288 |
| 2 ea. |
| 70.00 |
| 18 |
| N |
| Pressure Gauge |
| PN: YMD-6822 |
| 2 ea. |
| 230.00 |
| 18 |
| N |
| Cab Penetration Gasket |
| PN: MMD-2753 |
| 3 ea. |
| 21.00 |
| 18 |
| N |
| Load Cell Main Fall |
| PN: YMD-8275 |
| 1 ea. |
| 5,913.00 |
| 18 |
| N |
| Load Cell Aux Fall |
| PN: YMD-8276 |
| 1 ea. |
| 5,913.00 |
| 18 |
| N |
| Main Fall Wire Rope |
| PN: YMD-8265 |
| 1 ea. |
| 2,520.00 |
| 18 |
| N |
| Aux fall Wire Rope |
| PN: YMD-8266 |
| 1 ea. |
| 1,948.00 |
| 18 |
| N |
| Pilot Valve for Crane Control Valve Manifold for Swing, Luff, Telescope, Main and Aux Winch Functions |
| PN: R900929529 |
| 5 ea. |
| 13,200.00 |
| 20 |
| N |
| Plate |
| 2990-01-F12-2653 / CAT P/N 9Y-3076 |
| 4 |
| 134.08 |
| 20 |
| N |
| Plate |
| 2990-01-F12-2652 / CAT P/N 9Y-3077 |
| 4 |
| 74.67 |
| 20 |
| Y |
| Engine Support Assy |
| 2995-01-F12-2649 / CAT P/N 9Y-2029 |
| 4 |
| 4,500.00 |
| 20 |
| N |
| Bolt (304.8MM LG) |
| 5306-01-F12-2651 / CAT P/N 7X-0825 |
| 8 |
| 55.00 |
| 20 |
| N |
| Dowel (Two dowels per engine support assembly P/N: 9Y-2029) |
| 2990-01-F12-2650 / CAT P/N 7N-2328 |
| 8 |
| 10.00 |
| 20 |
| N |
| Base Plate |
| 5975-01-F12-2657 / CAT P/N 4P-0398 |
| 4 |
| 100.00 |
| 20 |
| N |
| Set Screw |
| 5305-01-F12-2656 / CAT P/N 8T-4162 |
| 32 |
| 30.38 |
| 20 |
| Y |
| TSC T2 30/70 Unit Isolator |
| 5340-01-F12-2654 / Christy and Grey P/N T2.S30.70.C01.00 |
| 16 |
| 600.00 |
| 20 |
| N |
| Washer, Flat |
| 5310-01-102-2477 / Christy and Grey P/N 5P8248 |
| 32 |
| 11.00 |
| 20 |
| N |
| Bolt, Machine (3/4–10 x 1.5 in) |
| 5306-00-814-6588 / Christy and Grey P/N 0S1626 |
| 32 |
| 40.00 |
| 20 |
| N |
| Setscrew |
| 5305-01-F12-2655 / Christy and Grey P/N 4B-3620 |
| 64 |
| 27.72 |
| 20 |
| N |
| Bolt, Machine (1–14 x 8 in) |
| 5306-01-323-4140 / CAT P/N 8S-4757 |
| 8 |
| 60.00 |
| 20 |
| N |
| Washer, Flat |
| 5310-01-157-3394 / CAT P/N 5P-8250 |
| 16 |
| 6.00 |
| 20 |
| N |
| Bolt, Machine (1–8 x 4.75in) |
| 5306-00-530-9235 / CAT P/N 2A-1420 |
| 4 |
| 55.00 |
| 21 |
| Y |
| Weathertight Door Buoy Crane cab. |
| Appleton Marine Inc. Door RH, OEM# MND-0854 Cage# 70433 |
| 1 ea. |
| $6,200.00 |
| 24 |
| Y |
| Steel QAWTD 36x66” LH, 10–dog w/9” Fixed Light |
| SIM to NAVSEA 803-6397268 revision A mod to single handle |
fixed light reference 803-6397268
| 1 ea. |
| $6,200.00 |
| 24 |
| Y |
| Steel QAWTD 36x66” RH, 10–dog w/9” Fixed Light |
| SIM to NAVSEA 803-6397268 revision A mod to single handle |
fixed light reference 803-6397268
| 1 ea. |
| $6,200.00 |
| 25 |
| Y |
| 36x60 dia RWTH w/QAS, Steel, Raised Hatch, coaming 6” height |
| Hatch 805-1624079-MOD Scuttle 25” 805-1623054 Spring similar 803-1645097&8 |
| 1 ea. |
| $6,350.00 |
| 25 |
| Y |
| 36 X36 RWTH spring 8 dogs 21” flush QAWTS 8” coaming |
| Hatch 805-1624070 Scuttle 805-1623054 |
| 1 ea |
| $5500.00 |
| 26 |
| N |
| Turret mount Large-Red |
| 19.102.R.F |
| 08 ea. |
| 24.20 |
| 26 |
| N |
| Turret mount Large-Yellow |
| 19.102.Y.F |
| 16 ea. |
| 21.97 |
| 26 |
| N |
| Turret mount Large-Blue |
| 19.102.B.F |
| 08 ea. |
| 24.20 |
28.1 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 10 |
| Crossdeck Winches, Inspect and Service |
| 12 |
| Single Point Davit - Slewing Arm, Inspect and Service |
| 15 |
| Hydraulic Chain Stoppers, Inspect And Service |
| 16 |
| Anchor Windlass, Inspect and Service |
| 17 |
| Warping Capstan, Inspect and Service |
| 18 |
| Twin Pivot Arm Davit, Inspect and Service |
| 19 |
| Buoy Crane, Inspect and Service |
| 24 |
| Stack Lighting, Install |
Principal Characteristics
225' WLB (B-CLASS)
Physical
| Length overall |
| 225' 0" |
| Length between perpendiculars |
| 206' 0" |
| Maximum beam |
| 46' |
| Designed draft |
| 13' 0" |
| Full load displacement |
| 1905.6 Long Tons SW |
| Light ship displacement |
| 1500.7 Long Tons SW |
| Minimum operating displacement |
| 1869.2 Long Tons SW |
| Mast height (above 12' waterline) |
| 67' 5" |
| Anchor |
| Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-3/8 die lock chain |
Hull
| Bilge keels (port & starboard) |
| Frames 42-79 |
FRAME SPACING
| FR 0 to 12 |
| 21" |
| FR 12 to 30 |
| 22" |
| FR 30 to 102 |
| 24" |
Machinery
| Main propulsion |
| Diesel Reduction |
| Diesel engines |
| Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM |
| Number of propellers |
| 1 |
| Number of blades |
| 4 |
| Diameter |
| 10' |
| Pitch |
| Controllable |
| RPM |
| 254 |
| Ship's service diesel generators |
| Two Caterpillar 3508 TA, 450 KW |
| Emergency diesel generator |
| One Caterpillar 3406 DITA, 280 KW |
| Shore tie |
| Two 450 VAC, 400 Amp, 3-wire |
| Shaft bearing, forward |
| Cooper Bearing 01-BCP-1400-EX-TL |
| Shaft bearing, aft |
| Water Lubricated Cutless Bearing |
Tank CAPACITIES
| Diesel oil |
| 76,498 gal. |
| Fresh water capacity |
| 8056 gal. |
| Hydraulic oil capacity |
| 2785 gal. |
| Lube oil storage |
| 764 gal. |
| Grey water tank |
| 2700 gal. |
| Sewage holding tank |
| 1700 gal. |
00000_1214_FLT
REC_00000_FLT_ Commercial Project @ CG Facility (1212) General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings
None
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST)_M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using Wipe Sampling Methods for Subsequent Determination of Metals
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health Standards
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
Code of Federal Regulations (CFR) Title 33 CFR, Jul 2013, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment Code of Federal Regulations (CFR) Title 49, Oct 2013, Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with (COMDTINST)_MI0360.3C , Chapter 11 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 5 of COMDTINST MI0360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is not currently registered as a conditionally exempt small quantity generator.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
· Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
· National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
· Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content: None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document..
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (Frame References) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
25901_1014_FLT
REC_25901_FLT_225' WLB 'B' Class (ALL) (0411)
WORK ITEM 1: Main Diesel Engine (MDE) Exhaust Stack Uptakes, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the Main Diesel Engine (MDE) exhaust stacks.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 225B WLB 259-001, Rev C, Combustion Intake & Exhaust Diagram Coast Guard Drawing 225B WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940 Coast Guard Drawing 225B WLB 259-006, Rev C, Combustion Intake & Exhaust A&D Hull Blocks 970 & 975
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Other References
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2008, Occupational Safety and Health Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
· Access covers.
· Exhaust stack.
· MDE.
· Piping.
· Pipe insulation.
· Vent ducting.
· Wiring.
· Exhaust pipe expansion joints.
· Exhaust insulation blankets.
3.1.5 Work site access. The Contractor shall gain access to both MDE exhaust stacks via existing Access 02-79-2.
3.2 Scaffolding. The Contractor shall, in accordance with 29 CFR 1915, Subpart E, erect suitable staging or scaffolding, as required, to facilitate work.
3.3 Safety precaution. The Contractor shall rig suitable safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.4 Work plan. The Contractor shall develop and submit, to the COR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the MDE. The Contractor shall perform this work upon receiving Coast Guard approval of the plan.
3.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.
3.6 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping to the MDE, shown on Coast Guard Drawings 225B WLB 259-001, 225B WLM 259-005, and 225B WLB 259-006, to a condition free from soot, tar, and any other foreign matter as follows:
3.6.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.6.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.6.3 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.6.4 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.
3.7 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CFR:
· Exhaust stack access hatches, including all associated studs and nuts.
· All cleaned exhaust stack surfaces.
· All exhaust expansion joints, including associated bolts.
3.7.1 Following cleaning of the interior of each exhaust pipe system, demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of exhaust piping has been satisfactorily cleaned according to the work plan.
3.8 Touch-up preservation. The Contractor shall prepare and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems).
3.9 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the exhaust stack system to be in satisfactory operating condition. Submit a CFR
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
4. NOTES
This section is not applicable to this work item.
25902_1014_FLT
REC_25902_FLT_225' WLB 'B' Class (ALL) (0712)
WORK ITEM 2: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .