ANTHONY_PETIT _Questions_ _Answers _1_April_2015.doc
DOC document 23 KB Posted
- Attached to
- FY15 Dry-Dock Repair CGC ANTHONY PETIT
- Solicitation number
- HSCG85-15-Q-P45747
About this file
ANTHONY PETIT Questions Answers 1 April 2015
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ANTHONY_PETIT_FY15_DD _Q A _March_24 2015.doc | DOC document | |
| ANTHONY_PETIT_FY15_DD_Questions_ _Answers _20_Mar.doc | DOC document | |
| ANTHONY_PETIT_Solicitation _13_March_two.pdf | ||
| ANTHONY_PETIT _Specification _7_Jan_2015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANTHONY PETIT FY15 DRY DOCK, Question & Answers, 1 April 2015
1) On page 21 of 59 of the Contract Solicitation, the block for FAR 52.219-14 is checked. Invoking the FAR. FAR 52.219-14 is not applicable to this contract per 52.219-14 (b) as this Contract was not a Small Business Set Aside.
Per the Solicitation, Standard Form 1449, this contract is UNRESTRICTED.
Answer: That block is checked by mistake. This is an UNRESTRICTED requirement
2) In item 37 Bilges Preserve how many SQ FT is to be done in the bilges listed in table 1 in item 37? I see you have listed 50 SQ FT in the pump room but do not list the SQ FT in the other spaces listed in table 1.
Answer: Approx Sq ft is 150, 300, 50, & 100 top to bottom in the table.
3) In work Item 22, Paragraph 3.6 directs the Contractor to clean and flush approximately __________ linear feet of grey water piping...
Will the Government quantify the amount of piping to be cleaned with clear and concise boundaries?
Answer: System is Approx 250 linear feet
4) Item 39 hydraulic chain stopper:
In item 39 task 7 it tells the contractor to renew the hydraulic fluid, are we to drain the deck machinery HPU and refill it and if so can you supply the type of hydraulic fluid and the amount needed? As the tech pub 3939 dose not say anything about it.
Answer: the contractor(s) should quote "Sample and Test" in accordance with Para C2.1.3 of SFLC Standard Specification 5000, in lieu of “renew.”
File details come from the government source that posted it. Updated .