MOBILEBAYPROPERTY.docx

DOCX document 23 KB Posted

Attached to
DRYDOCK REPAIRS FOR THE USCGC MOBILE BAY AND BARGE
Solicitation number
HSCG85-15-Q-P45577
Issued by

About this file

PROPERTY FORM

View the file

Other files

File Type Posted
AMEND0001MOBILEBAYFY15.doc DOC document
SECTIONB_MOBILE_BAY.xls XLS spreadsheet
MOBILE_BAY_SPECIFICATIONS.doc DOC document
USCGCMOBILEBAYFY15.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GOVERNMENT PROPERTY REPORT

The contractor shall complete each column throughout the contract performance period with the assistance of the Government Property Administrator, as needed.

CONTRACT NUMBER: HSCG80-14-C-P45634

VESSEL: USCGC CUSHING (WPB-1321)

CONTRACTOR POINT OF CONTACT : MICHAEL RAYMOND

CONTRACTOR’S ADDRESS: 1800 GRANT STREET, TAMPA, FL 33605

The chart below is for use during the performance of the above listed contract. The contractor shall complete each column of the chart with the assistance of the Government Property Administrator, as needed.

1
2
3
4
5
6

TYPE OF PROPERTY RECEIVED (INCLUDE NAME, DESCRIPTION , NSN AND SERIAL #)

VALUE OF

PROPERTY

DATE RECEIVED

DATE INSTALLED/

CONSUMED

DISPOSITION INSTRUCTIONS ARE:

(STATE WHETHER FOR SERVICEABLE , SALVAGE OR SCRAP PROPERTY)

DATE

DISPOSITION

CARRIED OUT

DESCRIPTION
NSN\SERIAL\P/N

* Definitions (all property defined below will require disposition instructions):

Serviceable - defined as property that was pre-existing in a location that was, during the course of performance, replaced and which will be turned in by the Coast Guard for future use.

Salvage – defined as property that has no serviceable value, but that has some value in excess of its scrap value.

Scrap – defined as property having no value except for it basic material content.

The undersigned hereby certify that all property provided under referenced contract has been accounted for. That is property has either been consumed in the performance of the contract or disposition instructions, as listed above, have been provided.

PROPERTY ADMINISTRATOR DATE

(Sign at time disposition instructions are given)

CONTRACTOR SIGNATURE DATE

(sign after execution of disposition instructions)

NOTE: The contractor must carry out all disposition instructions as instructed above. This report must accompany the contractor’s final invoice. (03/01)

File details come from the government source that posted it. Updated .