ATTACHMENT_2_-_Schedule_of_Supplies-Services.doc

DOC document 56 KB Posted

Attached to
USCGC STRATTON (WMSL 752) Dockside Repairs FQ1 FY15
Solicitation number
HSCG85-14-R-P45006
Issued by

About this file

ATTACHMENT 2 - Schedule of Supplies/Services

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES

B.1

CLIN 0001 - DEFINITE ITEMS

These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.

ITEM NO.
DESCRIPTION
AMOUNT
D-01
Tanks (MP Fuel Service), Clean and Inspect
$
D-02
Tanks (Ballast), Clean and Inspect
$
D-03
Tanks (Ballast), Clean and Inspect
$
D-04
Miscellaneous System Relief Valves, 5 Year, Certification
$
D-05
Ballast Tank Sounding Tube, Replace
$
D-06
Gooseneck Vent, Modify
$
D-07
Air Conditioning Plants, System Groom
$
D-08
Condenser Seawater Regulating Valve, Renew
$
D-09
Reverse Osmosis Unit, Groom
$
D-10
Fuel Oil Manifold Valves, Overhaul
$
D-11
Compressed Air Receivers Clean, Inspect and Hydro test
$
D-12
Fixed CO2, FM 200 and Ansul R-102 Systems Annual Certification
$
D-13
Portable Fire Extinguisher 5 Year Certification
$
D-14
Water Mist System, Annual Inspection and Biannual Discharge Test, Perform
$
D-15
Chain Hoist, Inspect and Test
$
D-16
Cargo Handling Elevator, Level 2 Inspect and Repair
$
D-17
Forward and Aft Capstans, Level 2 Inspect and Repair
$
D-18
Helo Talon Grids, Inspect and Test
$
D-19
Aircraft Bridge Cranes, Inspect and Test
$
D-20
Tanks (Water Mist), Preserve “Partial”
$
D-21
Temporary Services, Dockside, Home Pier
$
D-22
Deck Covering (Polymeric), Renew
$
D-23
Deck Covering (Polymeric), Seal
$
TOTAL AMOUNT OF ALL DEFINITE ITEMS
$

B.2

COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES

The following labor hour rate shall be used in pricing all contract changes in accordance with ATTACHMENT 3, Section 11, Page 6, entitled "COMPOSITE LABOR RATE.”

LABOR HOUR RATE

ESTIMATED QUANTITY

1436 hours

EXTENDED AMOUNT

**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.

File details come from the government source that posted it. Updated .