1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 30 Sept 2014
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
USCG COMMAND
Surface Forces Logistics Centers, C&PD2‐LREPL 1301 Clay Street, Suite 800N, Oakland, CA 94612
SAME AS BLOCK #6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
TO ALL PROSPECTIVE OFFERORS
HSCG85‐14‐R‐P45006
9B. DATE (SEE ITEM 11)
September 23, 2014
10A. MODIFICATION OF CONTRACT/ORDER
NO. ?
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: RFP No. HSCG85-14-R-P45006 CGC STRATTON (WMSL 752), Dockside Repairs FQ1 FY15
SEE PAGE 2 FOR DESCRIPTION
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
HSCG85-14-R-P45006
CGC STRATTON (WMSL 752) Dockside Repairs FQ1 FY15 Amendment No. 0001
The purpose of this amendment is to revise the specifications (ATTACHMENT 1 of the RFP) as follows:
1. Work Item 08 – Condenser Seawater Regulating Valve, Renew – Removed paragraph 3.4.1 which states: Prior to installation, the Contractors shall hydrostatically test the valves in accordance with SFLC Std Spec 0740, Appendix C, “Hydrostatic Test”. Ensure zero leakage from or permanent deformation of pressure-containing parts by repairing all leaks, deformations, and discrepancies. Submit a CFR.
2. Work Item 17 – Forward and Aft Capstans, Level 2 Inspect and Repair:
a. Page 120, Table 2, Recurring Maintenance Requirements - Item #2 (Disassemble and Inspect, 1 Capstan Assembly, 3.2.3 (Disassemble and Inspect), Install protective barriers to cover hole on deck) is removed.
b. Page 121, Table 2, Recurring Maintenance Requirements - The referenced table in the “OTHER” column for Item #5 (Disassemble and Inspect, 1, Brake Assembly, 3.2.3 (disassemble and Inspect), The contractor will renew all parts listed in Table 1 below.
Submit CIR) is changed from “Table 1” to “Table 4”.
c. Page 121, Table 2, Recurring Maintenance Requirements - The referenced table in the “OTHER” column for Item #6 (Disassemble and Inspect, 1, Planetary Gear Reducer,
3.2.3 (disassemble and Inspect), See Para 3.3.1. Verify output bearing is grease lubricated. Renew all parts listed in Table 2 below. Submit CIR), is changed from “Table 2” to “Table 3”.
d. Page 121, Table 3, Planetary Gear Reducer Parts - The five middle items are removed (01-405-0561, 01-160-0720, 01-402-0030, 01-160-0700, and 01-160-0710).
e. Page 121, Table 3, Planetary Gear Reducer Parts - The quantity for the first item (01-402- 0560), is changed from “2” to “8”.
f. Page 121, Table 3, Planetary Gear Reducer Parts - The quantity for the last item (01-402- 0010), is changed from “2” to “4”.
g. Page 121-122, Table 4, Brake Assembly Parts - All quantities are changed by multiplying the original by 4. First item is changed from “1” to “4”, second item from “2” to “8”, third item from “3” to “12”, and last item from “1” to “4”.
h. Page 122, Table 4, Brake Assembly Parts, the last item (P/N 8-076-203-00) is changed to 8-069-203-00.
i. Page 121, Paragraph 3.3.1 is revised to add the following “and all lubricants required for completion of this work item."
Attached are copies of the revised Work Item 08 and Work Item 17, incorporating the changes noted above. An updated version of the specifications, incorporating all the changes noted in this amendment, will be provided at time of award.
| Amendment 0001.pdf |
| Amendment 0001 page 2 |