SCHEDULE_OF_SUPPLIES_SERVICES_FOR_CGC_PENDANT_(WYTL_65B)_DD_FQ1_RKW_15ER0.xls
XLS spreadsheet 27 KB Posted
- Attached to
- DRYDOCK FOR USCGC PENDANT (WYTL-65608)
- Solicitation number
- HSCG85-14-Q-P45H97
About this file
SCHEDULE OF SUPPLIES/SERVICES
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30_Amendment_01_CGC_PENDANT.pdf | ||
| SCHEDULE_OF_SUPPLIES_SERVICES_FOR_CGC_PENDANT_(WYTL_65B)_DD_070914_BLANK.xls | XLS spreadsheet | |
| SOLICITATION_PENDANT_DRYDOCK.pdf | ||
| GOVERNMENT_PROPERTY_REPORT.pdf | ||
| SPEC_REV0_050214_PENDANT_DD_.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE
| PRICING SCHEDULE FOR: | |||||
| USCGC PENDANT (WYTL-65B) DRYDOCK AVAILABILITY FY2015 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect | JOB | $0.00 | ||
| D-002 | Appendages (U/W), Leak Test | JOB | $0.00 | ||
| O-003 | Appendages (U/W) - Internal, Preserve | JOB | $0.00 | ||
| D-004 | Propeller, Remove, Inspect, and Reinstall | JOB | $0.00 | ||
| D-005 | Keel Coolers, Clean, Inspect and Hydro | JOB | $0.00 | ||
| D-006 | Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean | JOB | $0.00 | ||
| D-007 | Boiler Exhaust Stack Uptakes, Commercial Clean | JOB | $0.00 | ||
| D-008 | Sewage and Grey Water Tanks, Commercial Clean | JOB | $0.00 | ||
| D-009 | U/W Body, Preserve (100%) | JOB | $0.00 | ||
| D-010 | Cathodic Protection / Zinc Anodes, Renew WYTL 65’ | JOB | $0.00 | ||
| D-011 | Drydocking | JOB | $0.00 | ||
| D-012 | Temporary Services, Provide - Tender | JOB | $0.00 | ||
| D-013 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | $0.00 | ||
| O-014 | Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Repair | JOB | $0.00 | ||
| O-015 | Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Repair | JOB | $0.00 | ||
| O-016 | Hull and Structural Plating (General) - Degraded Weld (Steel), Repair | JOB | $0.00 | ||
| D-017 | Voids (Non-Accessible), Leak Test | JOB | $0.00 | ||
| O-018 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | $0.00 | ||
| D-019 | Handrails and Stanchions, Renew | JOB | $0.00 | ||
| O-020 | Propeller, Perform Minor Repairs and Reconditioning | JOB | $0.00 | ||
| D-021 | Propulsion Shafting, Remove, Inspect, and Reinstall | JOB | $0.00 | ||
| D-022 | Propulsion Shaft Bearings (External), Check Clearances | JOB | $0.00 | ||
| O-023 | Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) | JOB | $0.00 | ||
| 0-024 | Superstructure, Preserve “Partial” | JOB | $0.00 | ||
| D-025 | Fathometer Transducer, Renew | JOB | $0.00 | ||
| D-026 | Head Bulkhead, Renew | JOB | $0.00 | ||
| D-027 | Hull Plate, Inspection and Repair | JOB | $0.00 | ||
| D-028 | Air Handler Unit, Renew | JOB | $0.00 | ||
| D-029 | Deck Covering (Interior Wet/Dry), Renew | JOB | $0.00 | ||
| D-030 | Stack Metal Plating, Repair | JOB | $0.00 | ||
| D-031 | AC Unit Foundation Renew | JOB | $0.00 | ||
| D-032 | Engine Room Plating Renew | JOB | $0.00 | ||
| D-033 | Main Hold Plating Renew | JOB | $0.00 | ||
| D-034 | Sewage Void Plating Renewal | JOB | $0.00 | ||
| D-035 | Fixed Ballast (Lead Ingots), Remove, Encapsulate and Reinstall in Containment Boxes | JOB | $0.00 | ||
| D-036 | Compartments Interior, Lead Dust, Clean | JOB | $0.00 | ||
| O-00A | Composite Labor Rate | Hour | 240 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(5/2/2014) Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .