SYCAMORE_(WLB_225B)_UPDS_FQ4_KDM_13R0.pdf
PDF 837 KB Posted
- Attached to
- USCGC SYCAMORE CAT3 BUOY CRANE
- Solicitation number
- HSCG85-13-Q-P45U54
About this file
USCGC SYCAMORE Specification for CAT3 Buoy Crane
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question_ _Answer_for_00002.docx | DOCX document | |
| Amendment_00002_(SF30).docx | DOCX document | |
| Amendment_00001_(SF30).docx | DOCX document | |
| Question_ _Answer_for_00001.docx | DOCX document | |
| Combined_Synopsis_Solicitation-CAT3_Crane.docx | DOCX document | |
| Request_for_Clarification_(SYCAMORE).docx | DOCX document | |
| Government_Property_Report.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC SYCAMORE (WLB 209)
SPECIFICATION FOR UNPLANNED DOCKSIDE REPAIRS
FY2013
Developed By: CWO Ken Miller
Rev-0 8 August 2013
USCGC SYCAMORE (WLB-225B) UNPLANNED DOCKSIDE AVAILABILITY FY2013
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ...................................................................................................................................................... iii Consolidated List of References ............................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................................. vi Principal Characteristics .......................................................................................................................................... vii General Requirements WORK ITEM 1: Tanks (Hydraulic Oil Stowage and Service), Clean and Inspect WORK ITEM 2: Cargo Hatch (Hydraulic), Overhaul and Repair WORK ITEM 3: Hydraulic Chain Stoppers, Overhaul WORK ITEM 4: Crossdeck Winches, Overhaul WORK ITEM 5: Hydraulic Inhaul Winch, Inspect and Service – Tier II WORK ITEM 6: Anchor Windlass, Level 2 Inspect and Repair WORK ITEM 7: Buoy Crane, Inspect and Service - Tier II WORK ITEM 8: Crane and Deck Hydraulic System, Flush iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 528-002, Rev E, Weather Deck Drains Diagram
Coast Guard Drawing 225 WLB 549-001, Rev E, Onboard Lubrication Requirements
Coast Guard Drawing 225 WLB 556-001, Rev K, Hydraulic System Diagram
Coast Guard Drawing 225 WLB 801-020, Rev B, Tank CAPACITY - 95% Curves
Coast Guard Drawing 225B WLB 573-001, Rev E, Buoy Handling System Arrangement
Coast Guard Drawing 225B WLB 549-001, Rev A, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram
Coast Guard Drawing 225B WLB 573-001, Rev G, Buoy Handling System Arrangement
Coast Guard Drawing 225B WLB 573-002, Rev -, Weight Handling System Arrangement
Coast Guard Drawing 225B WLB 573-009, Rev E, Bi-Dir Ch Stopper With Retractable Roller Stopper
Coast Guard Drawing 225B WLB 581-001, Rev C, Anchor Handling System Arrangement
Coast Guard Drawing 225B WLB 601-002, Rev H, Booklet of General Drawings
Coast Guard Drawing 225B WLB 801-005, Rev A Tank CAPACITY - 95% Curves
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1
Coast Guard Fleet Drawing FL-1702-11, Rev -, Inspection of Sheaves
Coast Guard Fleet Drawing FL-2605-29, Rev H, Chain Stopper System – Rising Sheave Assembly
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3498, Section A, Feb 2008, Buoy Chain Winch http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace v (Rev-0)
Coast Guard Technical Publication (TP) 3557, Section 573-C, Feb 2010, Manufacturer's Instruction
Book-SWBS Group 568-573, Buoy Crane – Model EB-480-60-40 (Hulls 206, 207, 208, 209, 210, 211, 212, 213, 214, 215, 216)
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS
Group(s) 573, Section A, Cross Deck Winch – Model BMD-390
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS
Group(s) 573, Section B, Cross Deck Winch – Model BMD-471
Coast Guard Technical Publication (TP) 3559, SWBS 581B, Jan 1997, Anchor Windlass, P/S - Model
BMD-478
Coast Guard Technical Publication (TP) 3559, SWBS 573-D, Jan 1997, Chain Stopper
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Command (SFLC) Naval Engineering Directive (NED) 5735-01, Inspection and
Test Procedure for Buoy Chain Winch Model CW-1 Onboard WLM 551-564 and WLB 201-215, May 2010
OTHER REFERENCES
American National Standard Institute/American Water Works Association ANSI/AWWA C217, 2009, Petrolatum and Petroleum Wax Tape Coatings for the Exterior of Connections and Fittings for Steel
Water Pipeline
Code of Federal Regulations (CFR) Title 33 CFR, Jul 2010, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cutback, Cold-Application
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning vi (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
7 N Bearing Sleeve
(luffing cylinder bushing)
3120-014241044 6 104.83
7 Y Luffing Cylinder 3040-014722151 2 30,060.63
7 Y DCV 1
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter vii Rev-0
PC_225B_WLB_1109
PRINCIPAL CHARACTERISTICS
225' WLB (B-CLASS)
PHYSICAL CHARACTERISTICS
Length Overall 225' 0"
Length between Perpendiculars 206' 0"
Maximum Beam 46'
Designed Draft 13' 0"
Full Load Displacement 2000 long tons
Light Ship Displacement 1523 long tons
Minimum Operating Displacement 1800 long tons
Mast Height (Above 12' Waterline) 67' 5"
Anchor
Two 4000 lb standard Navy stockless anchors, 10 shots each, port and starboard, 1-3/8 die lock chain
HULL CHARACTERISTICS
Bilge Keels (Port & Starboard) Frames 42-79
Frame Spacing
FR 0 to 12 21"
FR 12 to 30 22"
FR 30 to 102 24"
MACHINERY CHARACTERISTICS
Main Propulsion Diesel Reduction
Diesel Engines Two Caterpillar 3608, TA, viii Rev-0
3100 BHP each @ 900 RPM
Number of Propellers 1
Number of Blades 4
Diameter 10'
Pitch Controllable
RPM 254
Ship's Service Diesel Generators Two Caterpillar 3508 TA, 450 kW
Emergency Diesel Generator One Caterpillar 3406 DITA, 280 kW
Shore Tie Two 450 VAC, 400 Amp, 3-wire
Shaft Bearing, Forward Cooper Bearing 01-BCP-1400-
EX-TL
Shaft Bearing, Aft Water Lubricated Cutless
Bearing
TANK CAPACITIES
Diesel Oil 76,498 gal
Fresh Water Capacity 8056 gal
Hydraulic Oil Capacity 2785 gal
Lube Oil Storage 764 gal
Grey Water Tank 2700 gal
Sewage Holding Tank 1700 gal
1 Rev-0
00000_0613_FLT
REC_00000_FLT_ Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
OTHER REFERENCES
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
Code of Federal Regulations (CFR) Title 33 CFR, Jul 2010, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
2 Rev-0
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with SFLC Std Spec 6310, Chapter 11 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 11 of SFLC Std Spec 6310) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazardous wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40
CFR 262, applicable to handling of hazardous wastes.
3.5.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available its facility’s EPA Generator Identification
(ID) Number for manifesting of hazardous wastes.
3.5.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the facility’s HM/HW Coordinator. Notify the ship’s HW
Coordinator prior to any transfers of HW from ship to shore.
3.5.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW
Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COR in writing 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.4 The Contractor shall be aware of the following:
3.5.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3 Rev-0
3.5.4.2 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with local and state regulations.
3.5.4.3 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the
Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.
3.6 SFLC Standard Specification Approved Changes. The Contractor shall be aware that the following are approved changes to published SFLC 2012 Edition Standard Specifications and supersede published content:
3.6.1 SFLC Std Spec 8634, Drydocking, Appendix A, page A5, paragraph A2.7.1.3 Side Blocks. Remove formula value shown as g – Acceleration of gravity – 32.3 Ft/sec , and replace with formula value g -
Acceleration of gravity - 32.174 ft/sec
3.6.2 SFLC Std Spec 0740, Welding and Allied Processes. SFLC Std Spec 0740 added Appendix E, Stray
Current Protection. New Appendix is posted with SFLC Standard Specifications as a separate document on internet and intranet webpage.
3.6.2.1 SFLC Std Spec 0740, Welding and Allied Processes, page 1, paragraph 1.2 Appendices. Add ‘Stray
Current Protection’ to ‘Process Standard column of appendices table. Add ‘E’ to ‘Appendix’ column of appendices table.
3.6.2.2 SFLC Std Spec 0740, Welding and Allied Processes, page 4, paragraph 3.1.3 Stray current protection.
Add “The Contractor shall meet all requirements for stray current protection as specified in Appendix E - Stray
Current Protection.” directly after paragraph 3.1.3 title.
3.6.2.3 SFLC Std Spec 0740, Welding and Allied Processes, page 4, paragraph 3.1.3 Stray current protection.
Delete paragraphs 3.1.3.1 and 3.1.3.2.
3.6.3 SFLC Std Spec 0450, Electrical Power for Contractor’s Tools and Equipment, page 1, paragraph 1.1 Intent.
Add sentence, “Note that stray current protection for welding equipment is covered in SFLC Standard
Specification 0740, Welding and Allied Processes, Appendix E.” to end of paragraph.
3.6.3.1 SFLC Std Spec 0450, Electrical Power for Contractor’s Tools and Equipment, page 5, paragraph 3.4
Equipment Grounding. Add sentence, “Stray current protection for welding equipment is covered in SFLC
Standard Specification 0740, Welding and Allied Processes, Appendix E.” to end of paragraph.
3.6.3.2 SFLC Std Spec 0450, Electrical Power for Contractor’s Tools and Equipment, page 6, paragraph 3.4
Equipment Grounding. Delete paragraphs 3.4.1.4 and 3.4.1.5.
3.6.3.3 SFLC Std Spec 0450, Electrical Power for Contractor’s Tools and Equipment, page 6, paragraph 3.4
Equipment Grounding. Delete Figure 5.
4 Rev-0
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 Rev-0
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
6 Rev-0
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL.
HUMID-
ITY DEW
PT.
SURFACE AMBIENT
ΔT
| DP -
Surface |
7 Rev-0
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
8 Rev-0
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
_____ mils _____ mils _____ mils _____ mils _____ mils
9 Rev-0
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS
CONDUCTIVITY
(microsiemens/cm)
10 Rev-0
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction
Time
Coating System Sequence
(Primer/Touchup/3rd Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled) Average DFT
11 Rev-0
12310_0712_FLT
REC_12310_225’ WLB ‘B’ Class (ALL) (1111)
WORK ITEM 1: Tanks (Hydraulic Oil Stowage and Service), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TYPE OF TANK LOCATION CAPACITY -
95%
(gallons)
LOW
SUCTION
(gallons)
Hydraulic Oil 2-10-0-F 706 50
Hydraulic Oil 2-10-1-F 919 50
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 601-002, Rev H, Booklet of General Drawings
Coast Guard Drawing 225B WLB 801-005, Rev A Tank CAPACITY - 95% Curves
Coast Guard Drawing 225 WLB 801-020, Rev B, Tank CAPACITY - 95% Curves
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary Machine Systems
OTHER REFERENCES
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
12 Rev-0
3. REQUIREMENTS
3.1 General. The Contractor shall accomplish the following for all designated tanks in paragraph 1.1
(Intent). Use Coast Guard drawings 225B WLB 601-002, 225B WLB 801-005 and 225B WLB 801-020 for guidance.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences
3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs, as applicable, to demonstrate existing operational condition. Submit a CFR.
3.1.6 Tank contents. The Contractor shall remove and dispose of up to a total of 1650 gallons of hydraulic oil. Contents shall be utilized to flush piping and system and disposed of upon completion of all authorized work; the Contractor shall renew the hydraulic fluid in accordance with SFLC Std Spec 5000, Appendix C, Paragraph C2.1 (Fluids) and equipment manufacturer recommendations.
NOTE
Vessel may come in with less tank fluid contents than specified above.
3.2 Cleaning requirements. The Contractor shall remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.
3.3 Tank content and waste disposal. The Contractor shall dispose of residual tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.4 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
Tank structural condition.
13 Rev-0
Inaccessible areas.
Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
Tank level indicator (TLI) and/or float switch condition, as applicable.
Sounding tube and striker plate condition.
Suction and discharge piping condition.
Fastener material and condition (correct fastener material is stainless steel).
3.5 Tank closing. After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
3.6 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of all designated tank TLIs, as applicable, to prove satisfactory operating condition. Submit a CFR.
This section is not applicable to this work item.
14 Rev-0
16700_PWB_0812_225WLB
SYY_NNN_16700_CargoHatch_225WLB_OvhlRepair_AUTH_MMYY_Hull#
WORK ITEM 2: Cargo Hatch (Hydraulic), Overhaul and Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform overhaul and maintenance repairs on the Cargo Hatch.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 528-002, Rev E, Weather Deck Drains Diagram
Coast Guard Drawing 225 WLB 549-001, Rev E, Onboard Lubrication Requirements
Coast Guard Drawing 225 WLB 556-001, Rev K, Hydraulic System Diagram
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
15 Rev-0
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Electrical and hydraulic switches.
Dogs.
Toggles.
Hydraulic cylinders.
Hydraulic lines.
Electrical cables.
Hoses.
Overhead insulation.
3.1.5 Reference documents. The Contractor shall perform the work described herein in accordance with
SFLC Std Spec 5000, CG TP-3717, and all Coast Guard Drawings listed in Section, as applicable.
16 Rev-0
3.2 Overhaul particulars.
ADDITION REQUIREMENTS
# TASK TYPE QTY COMPONENT
OR ASSEMBLY
APPENDIX
AND PARA.
FROM
5000_STD
OTHER
1 Dissemble and
Inspect
1 Hydraulic hatch lift cylinder
3.2.3 (Dissemble and inspect)
Submit CFR Renew all disturbed seals
2 Dissemble and
Inspect
2 Hydraulic hatch dogging cylinder
3.2.3 (Dissemble and inspect)
Submit CFR Renew all disturbed seals
3 Dissemble and
Inspect
1 Hydraulic hatch
DCV
3.2.3 (Dissemble and inspect)
Submit CFR Renew all disturbed seals and orings
4 Operational
Testing – Post
Repairs
1 Cargo Hatch N/A Raise and lower, dog and un-dog, the hatch three complete cycles. Verify hatch operates in accordance with parameters specified in TP-3717 with no unusual noise or binding.
Submit CFR.
CAUTION!
DO NOT PAINT GASKETS OR ANY MOVING PARTS, INCLUDING
DOGS, NUTS, WEDGES, SPINDLES, YOKES, PACKING, CONNECTING
RODS AND HINGE PINS.
17 Rev-0
57301_Hyd_Chain_Stopper_Overhaul_ANK_0712_FLT
REC_57321_FLT_225’ WLB ‘B’ Class (ALL) (0811)
WORK ITEM 3: Hydraulic Chain Stoppers, Overhaul
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to overhaul the port and starboard hydraulic chain stoppers.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Fleet Drawing FL-2605-29, Rev H, Chain Stopper System – Rising Sheave
Assembly
Coast Guard Drawing 225B WLB 573-009, Rev E, Bi-Dir Ch Stopper With Retractable Roller
Stopper
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3559, SWBS 573-D, Jan 1997, Chain Stopper
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary Machine Systems
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures - hydraulic system. The Contractor shall maintain existing hydraulic system cleanliness; take all necessary precautions to prevent the introduction of contaminants into the hydraulic
18 Rev-0 system. Whenever disconnecting or removing components from the hydraulic system, completely seal all openings to the rest of the system, immediately, using either caps (for externally threaded connection points), bolt-on blanks, or taped-on discs/covers (durable plastic or sheet-metal no less than 1/16-inch thick).
NOTE
Plastic bags may be used only when arrangement or configuration prevents the use of the other sealing methods specified above.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences).
3.1.5 Work coordination. The Contractor shall coordinate this work item with all other weight handling -associated jobs that are included in this specification package.
3.2 Inspection and repair tasks. The Contractor shall refer to Coast Guard Drawings 225B WLB 573-009
FL-2605-29, and TP 3559, SWBS-573-D as guidance. Perform all work in accordance with SFLC Std
Spec 5000.
ADDITION REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA. REF.)
QTY COMPONENT
OR ASSEMBLY
APPENDIX AND PARA.
FROM SFLC STD SPEC
OTHER
1 Disassemble and
Inspect
2 Directional control valve assembly
C2.4 (Valves and manifolds)
Submit CFR.
2 Disassemble and
Inspect
4 Hydraulic cylinder 3.2.3 (Disassemble and
Inspect)
Submit CFR.
Renew all seals
3 Final Test 2 Hydraulic Chain
Stopper Assembly
B2.2 (Hydraulic chain stoppers)
Operational Load Test
Weight: 16,500 (+0 -825) pounds
Submit CFR.
4 Fabricate and
Install
2 Label Plate B2.9 (Label plates) Weight: 16,500 (+0 -825) pounds
3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 1 below, the Contractor shall refer to the corresponding Appendix or paragraph of SFLC Std Spec 5000.
TABLE 1 – SPECIAL REQUIREMENTS
COMPONENT
APPENDIX & PARAGRAPH
IN SFLC STD SPEC 5000
Fluids C2.1
Hose assemblies C2.2
19 Rev-0
Piping and tubing C2.3
Valves and manifolds C2.4
Gages C2.5
Gas charged accumulators C2.6
Heat exchangers and fluid coolers C2.7
Systems C2.8
Fastener assemblies D2.1
Wire rope assemblies D2.2
Brakes and clutches D2.3
Open gearing and gear reducers D2.4
Cutter will provide weights needed to perform the weight test.
20 Rev-0
57302_Crossdeck_Ovhl_PWB_0712_FLT
REC_57302_XDckWinch_FLT _225’ WLB ‘B’ Class (ALL) (0211)
WORK ITEM 4: Crossdeck Winches, Overhaul
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to overhaul the below-listed crossdeck winches.
EQUIPMENT
Port Fwd Crossdeck Winch (PFW)
Stbd Fwd Crossdeck Winch (SFW)
Port Aft Crossdeck Winch (PAW)
Stbd Aft Crossdeck Winch (SAW)
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 549-001, Rev A, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram
Coast Guard Drawing 225B WLB 573-001, Rev E, Buoy Handling System Arrangement
Coast Guard Drawing 225B WLB 573-002, Rev -, Weight Handling System Arrangement
Coast Guard Fleet Drawing FL-1702-11, Rev -, Inspection of Sheaves
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-
SWBS Group(s) 573, Section A, Cross Deck Winch – Model BMD-390
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-
SWBS Group(s) 573, Section B, Cross Deck Winch – Model BMD-471
OTHER REFERENCES
21 Rev-0
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures - hydraulic system(s). The Contractor shall maintain existing hydraulic system cleanliness; take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Whenever disconnecting or removing components from the hydraulic system, completely seal all openings to the rest of the system, immediately, using either caps (for externally threaded connection points), bolt-on blanks, or taped-on discs/covers (durable plastic or sheet-metal no less than 1/16-inch thick).
NOTE
Plastic bags may be used only when arrangement or configuration prevents the use of the other sealing methods specified above.
3.1.4 Interferences.
None.
3.1.5 Reference documents. The Contractor shall perform the work described herein in accordance with
SFLC Std Spec 5000, Coast Guard Drawings 225B WLB 549-001, 225B WLB 556-001, 225B WLB
573-002 and CG TP-3498, as applicable.
3.2 Inspection and repair particulars.
ADDITIONAL REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA. REF.)
QTY COMPONENT OR
ASSEMBLY
APPENDIX AND
PARA. FROM
SFLC STD SPEC
OTHER
1 Disassemble and Inspect
4 Winch Brake
Assembly
D2.3 (Brakes and clutches)
Submit CFR. Renew all friction discs/springs.
2 Disassemble and Inspect
4 Hydraulic Control
Valve Assembly
C2.4 (Valves and manifolds)
Submit CFR.
3 Disassemble and Inspect
4 Winch Hydraulic
Motor Assembly
3.2.3
(Disassemble and inspect)
Submit CFR.
4 Weight Test 4 Crossdeck Winch
Assembly
B2.3 (Winches) Static Load Test Weight:
15,600 (+780 -0) pounds
Rated Load Test Weight :
22 Rev-0
ADDITIONAL REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA. REF.)
QTY COMPONENT OR
ASSEMBLY
APPENDIX AND
PARA. FROM
SFLC STD SPEC
OTHER
10,400 (+0 -520) pounds
5 Fabricate and
Install
4 Label Plate B2.9 (Label plates)
3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 1 below, the Contractor shall refer to the corresponding Appendix or paragraph of SFLC Std Spec 5000.
TABLE 1 – SPECIAL REQUIREMENTS
COMPONENT
APPENDIX & PARAGRAPH
IN SFLC STD SPEC 5000
Fluids C2.1
Hose assemblies C2.2
Piping and tubing C2.3
Valves and manifolds C2.4
Gages C2.5
Gas charged accumulators C2.6
Heat exchangers and fluid coolers C2.7
Systems C2.8
Fastener assemblies D2.1
Wire rope assemblies D2.2
Brakes and clutches D2.3
Open gearing and gear reducers D2.4
23 Rev-0
57302_ANK_0113_IBCT
REC_57302_225_Hydraulic_Inhaul_IBCT_225’ WLB (‘B’ Class Hull 206-216) (0113)
WORK ITEM 5: Hydraulic Inhaul Winch, Inspect and Service – Tier II
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and service the hydraulic inhaul (buoy chain) winch.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 549-001, Rev A, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 556-001, Rev F, Hydraulic System Diagram
Coast Guard Drawing 225B WLB 573-001, Rev E, Buoy Handling System Arrangement
Coast Guard Drawing 225B WLB 573-002, Rev -, Weight Handling System Arrangement
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3498, Section A, Feb 2008, Buoy Chain Winch
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Command (SFLC) Naval Engineering Directive (NED) 5735-01, Inspection and Test Procedure for Buoy Chain Winch Model CW-1 Onboard WLM 551-564 and WLB 201-215, May 2010
OTHER REFERENCES
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cutback, Cold-
Application
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface
Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
24 Rev-0
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following task(s) in
Table I:
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the
Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.3.1 Protective measures - hydraulic system. The Contractor shall maintain existing hydraulic system cleanliness and take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Immediately after disconnecting or removing components from the hydraulic system, the Contractor shall completely seal all openings to the rest of the system using caps for externally threaded connection points, bolt-on blanks, or taped-on discs/covers made of durable plastic or sheet-metal that is no less than 1/16-inch thick.
NOTE
Plastic bags may be used only when arrangement or configuration prevents the use of the other sealing methods specified above.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences).
3.1.6 General hydraulic system requirements. The Contractor shall perform all work in accordance with paragraph 3.1 of SFLC Std Spec 5000, as applicable.
3.1.7 Contractor-furnished parts. The Contractor shall furnish all snap rings, bearings, thrust buttons, seals, o-rings, gaskets, seal washers, keys, shims, lockwashers, bushings, dowel pins, thrust washers, cotter pins, rope clamp, foundation bolts and nuts, as applicable, in accordance with Coast Guard
Drawings 225B WLB 549-001, 225B WLB 556-001, 225B WLB 573-001, and 225B WLB 573-002.
3.2 Recurring Maintenance Requirements. The Contractor shall perform the tasks designated in Table I below.
TABLE I – RECURRING MAINTENANCE REQUIREMENTS
ADDITION REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA. REF.)
QTY COMPONENT OR
ASSEMBLY
APPENDIX AND
PARA. FROM SFLC
STD SPEC 5000
OTHER
1 Disassemble and
Inspect
1 Level Wind Arm
Hydraulic Cylinder
3.2.3 (Disassemble and
Inspect)
Submit CFR. Renew all seals
2 Disassemble and 1 Level Wind Cylinder 3.2.3 (Disassemble and Submit CFR. Renew all
25 Rev-0
ADDITION REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA. REF.)
QTY COMPONENT OR
ASSEMBLY
APPENDIX AND
PARA. FROM SFLC
STD SPEC 5000
OTHER
Inspect Control Block (DCV) Inspect) seals
3 Disassemble and
Inspect
1 Chain Winch Control
Block (DCV)
C2.4 (Valves And
Manifolds)
Submit CFR. Renew all seals
4 Disassemble and
Inspect
1 Hydraulic motor and hydraulic manifold
3.2.3 (Disassemble and
Inspect)
Submit CFR. Renew all seals
5 Align 1 Buoy Chain In-haul
Winch Assembly
Perform alignment per
Appendix E of Tech Pub
3498, Chain Winch
Realignment Instructions.
Submit CFR
6 Groom and
Lubricate
1 Buoy Chain In-haul
Winch and Level Wind
Arm Assembly
3.2.6 (Groom and
Lubricate)
Perform all adjustments in
Chapter 6-2 of TP-3498.
7 Weight Test 1 Buoy Chain In-haul
Winch and Level Wind
Arm Assembly
Perform all weight testing specified in NED 5735-01
NOTE: A Coast Guard
Inspector will operate the equipment.
See Table II below.
Submit CFR.
8 Fabricate and
Install
1 Label plate B2.9 (Label Plates)
TABLE II – TEST WEIGHTS
MAIN HOIST TEST WEIGHTS
Static 24,750 (+5% - 0%) lbs
Rated 16,500 (+5% - 0%) lbs
Emergency Brake
Release 5,000 (+0% - 5%) lbs
3.4 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table IV below, the Contractor shall refer to the corresponding Appendix or paragraph of SFLC Std Spec 5000.
TABLE 1V – SPECIAL REQUIREMENTS
COMPONENT
APPENDIX &
PARAGRAPH IN SFLC
STD SPEC 5000
Fluids C2.1
Hose assemblies C2.2
Piping and tubing C2.3
Valves and manifolds C2.4
Gages C2.5
Gas charged accumulators C2.6
Heat exchangers and fluid coolers C2.7
26 Rev-0
Systems C2.8
Fastener assemblies D2.1
Wire rope assemblies D2.2
Brakes and clutches D2.3
Open gearing and gear reducers D2.4
Cutter will provide weights needed to perform the weight test.
27 Rev-0
58100_ANK_1211_225B
WORK ITEM 6: Anchor Windlass, Level 2 Inspect and Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and repair the port and starboard Anchor Windlasses.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 581-001, Rev C, Anchor Handling System Arrangement
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3559, SWBS 581B, Jan 1997, Anchor Windlass, P/S -
Model BMD-478
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary Machine Systems
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
Not applicable.
28 Rev-0
3.1.4 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed. Handle all interferences in accordance with SFLC Std Spec 0000, paragraph
3.3.5 (Interferences):
Port and starboard anchors (remove at the swivel shot).
Port and starboard anchor chains.
NOTE
Each anchor weighs 2,250 pounds and each chain is 1-1/8 inch Stud-Link, Grade III with a length of 7 shots.
3.1.5 Reference documents. The Contractor shall perform the work described herein in accordance with
SFLC Std Spec 5000, TP-3559, SWBS 581B, and Coast Guard Drawing 225B WLB 581-001.
3.2 Inspection and repair requirements. The Contractor shall accomplish the following:
ADDITIONAL REQUIREMENTS
# TASK TYPE QTY COMPONENT
OR
ASSEMBLY
APPENDIX AND
PARA. FROM SFLC
STD SPEC 5000
OTHER
1 Disassemble and
Inspect 2 Hydraulic Disc
Brake Assembly
D2.3 (Brakes and clutches)
Submit a CFR. Renew springs/discs/pads.
Renew all disturbed seals/orings/gaskets
2 Disassemble and
Inspect 2 Directional
Control Valve assembly
C2.4 (Valves and manifolds)
Submit a CFR. Renew all disturbed seals/orings/gaskets
3 Disassemble and
Inspect 2 Holding Valve assembly
C2.4 (Valves and manifolds)
Submit a CFR. Renew all disturbed seals/orings/gaskets
4 Final Operational and/or weight test 2 Anchor Windlass B2.5 (Anchor windlass) Submit CFR.
5 Fabricate and
Install 2 Label plate B2.9 (label plates)
3.3 Special requirements for various components. If a Change Request has been authorized for additional work on any of the components listed in Table 1 below, the Contractor shall refer to the corresponding Appendix or paragraph of SFLC Std Spec 5000, as applicable.
TABLE 1 – SPECIAL REQUIREMENTS
COMPONENT
APPENDIX &
PARAGRAPH IN SFLC
STD SPEC 5000
Fluids C2.1
Hose assemblies C2.2
Piping and tubing C2.3
Valves and manifolds C2.4
Gages C2.5
29 Rev-0
Gas charged accumulators C2.6
Heat exchangers and fluid coolers C2.7
Systems C2.8
Fastener assemblies D2.1
Wire rope assemblies D2.2
Brakes and clutches D2.3
Open gearing and gear reducers D2.4
30 Rev-0
58911_ANK_0613_225B
WORK ITEM 7: Buoy Crane, Inspect and Service - Tier II
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform inspections and repairs for the Appleton EB-480-60-40 Crane.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N Bearing Sleeve (luffing cylinder bushing)
3120-014241044 6 104.83
Y Luffing Cylinder 3040-014722151 2 30,060.63
Y DCV block 1
**New or refurbished equipment…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .