WIRE_(WYTL_65612)_DD_13Rev0_doc_17JAN13.pdf
DoD Form Rev. 0, Jan 17, 2013 PDF 1 MB Posted
- Attached to
- USCGC WIRE (WYTL-65612) FY13 DD
- Solicitation number
- HSCG85-13-Q-P45763
About this file
SPECIFICATIONS FOR CGC WIRE FY13 DRY-DOCK
View the file
Other versions and copies of DD Form 13
Who attaches DD Form 13
| Agency | Files |
|---|---|
| Department of Health and Human Services | 3 |
| Department of Homeland Security US Coast Guard | 2 |
| State | Files |
|---|---|
| Ohio | 3 |
Other files
| File | Type | Posted |
|---|---|---|
| Question_ _Answer_for_00003.docx | DOCX document | |
| 00003_SF30.docx | DOCX document | |
| image001.jpg | JPG image | |
| Question_ _Answer_for_00002.docx | DOCX document | |
| 00002_SF30.docx | DOCX document | |
| 00001_SF30.docx | DOCX document | |
| Foreseeables_for_CGC_WIRE_(2).docx | DOCX document | |
| Solicitation_For_USCGC_WIRE_(WYTL-65612)_Dry-Dock.docx | DOCX document |
On GovTribe
Work with this file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC WIRE (WYTL 65612)
65 FOOT "C CLASS" SMALL HARBOR TUG
SPECIFICATION FOR DRYDOCK REPAIRS
FY2013
Developed By: Spencer E. Ross
(Rev-0, 18 January 2013)
USCGC WIRE (WYTL-65C) DRYDOCK AVAILABILITY FY2013
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ...................................................................................................................................................... iii Consolidated List of References ............................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................................ vii Consolidated List of Critical Inspection Items ....................................................................................................... viii Principal Characteristics - Tender ............................................................................................................................ ix General Requirements WORK ITEM 1: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 2: Appendages (U/W), Leak Test WORK ITEM 3: Appendages (U/W) - Internal, Preserve WORK ITEM 4: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 5: Propulsion Shafting, Straighten WORK ITEM 6: Propulsion Shaft Bearings (External), Check Clearances WORK ITEM 7: Propeller, Remove, Inspect, and Reinstall WORK ITEM 8: Propeller, Clean and Inspect WORK ITEM 9: Propeller, Perform Minor Repairs and Reconditioning WORK ITEM 10: Vent Ducts (Engine and Motor Room All), Commercial Cleaning WORK ITEM 11: Sea Strainers - Simplex, Overhaul & Renew WORK ITEM 12: Halon 1301 Fire Extinguishing System Cylinder, Inspect and Test WORK ITEM 13: Rudder Assembly, Remove, Inspect and Reinstall WORK ITEM 14: Boat Davit, Level 2 Inspect and Repair WORK ITEM 15: Cathodic Protection / Zinc Anodes, Renew WORK ITEM 16: Drydocking WORK ITEM 17: Temporary Services, Provide WORK ITEM 18: Deck Covering (Wet/Dry), Seal WORK ITEM 19: Hull and Structural Plating - 15.3-Pound (3/8”) Steel Plate, Repair WORK ITEM 20: Hull and Structural Plating – 7.65-Pound (5/16”) Steel Plate, Repair WORK ITEM 21: Hull and Structural Plating - Cracked Steel Welds, Repairs WORK ITEM 22: Hull and Structural Plating - Degraded Weld (Steel), Repair WORK ITEM 23: Fathometer Transducer, Renew WORK ITEM 24: U/W Body, Preserve “100%” WORK ITEM 25: Keel Coolers, Clean, Inspect and Hydro WORK ITEM 26: Decks – Exterior, Prepare {and Coat} (Pre Slip-Resistant Sheet Installation) WORK ITEM 27: Hull and Structural Plating (General) -10.2-Pound Steel, Repair WORK ITEM 28: Forepeak Deck Repair WORK ITEM 29: Longitudinal Frame Renew WORK ITEM 30: SCBA Cylinders, Install WORK ITEM 31: Compartment Interior, Partially Abate Lead and Asbestos Coatings on Bulkhead and
Overhead Surfaces iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing _______________, Booklet of General Plans
Coast Guard Drawing 65 WYT 0103-002, Rev B, Outboard, Inboard Profiles, and General Arrangements
Coast Guard Drawing 65 WYT 1112-001, Rev A, Strut, Skeg, Main Engine and Generator Foundation
Details
Coast Guard Drawing 65 WYT 3801-5, Rev -, HVAC System Equipment and Duct Modifications
Coast Guard Drawing 65B WYT 0700-004, Rev -, Docking Block Arrangement („B‟ & „C‟ Class)
Coast Guard Drawing 65B WYT 0700-004, Rev -, Docking Block Arrangement (“B &C” Class)
Coast Guard Drawing 65B WYT 0700-004, Rev-, Docking Block Arrangement (“B &C” Class)
Coast Guard Drawing 65B WYT 1101-001, Rev E, Construction Plan, Shell Expansion and Sections
Coast Guard Drawing 65B WYT 2200-001, Rev B, Rudder and Steering Gear (65607-65612)
Coast Guard Drawing 65B WYT 2200-001, Rev B, Rudder and Steering Gear
Coast Guard Drawing 65B WYT 4103-004, Rev C, Engine Starting F/O and Engine Cooling System
Arrangement and Details (65613-15)
Coast Guard Drawing 65B WYT 4301-002, Rev C, Shafting & Bearings
Coast Guard Drawing 65B WYT 4301-002, Rev C, Shafting & Bearings
Coast Guard Drawing 65B WYT 4400-003, Rev C, Propeller (65613-65615)
Coast Guard Drawing 65B WYT 4800-2, Rev A, Firemain and Bilge System & Plumbing Drains
Coast Guard Drawing 65 WYT 664-001, Rev A, Damage Control SCBA Installation
Coast Guard Drawing 65B WYTL 3801-1, Rev E, Ventilation Systems Arrangement http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace v (Rev-0)
Coast Guard Drawing 65-WYT 9300-3, Rev -, Fire Alarm / Detection System Mods (Supersedes 65-
WYT -9300-2)
Coast Guard Drawing 8201-052, Rev C, Harbor Tug Boat Hdlg Mods for 4 M. RHI
Coast Guard Drawing FL 6713-201, Rev B, CRP-V850 Transducer (B-14) Adapter Assembly
NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
COAST GUARD PUBLICATIONS
Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Color Manual
Coast Guard Commandant Instruction (COMDTINST) M9000.6, Oct 2004, Naval Engineering Manual
(NEM)
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 3210, Manufacturer's Instruction Book-SWBS Group(s)(s) 555
Naval Ship's Technical Manual (NSTM) Chapter 245, Rev 5, Propellers
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General
Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, Jan 2009, Inspect, Repair, And Test Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), Jan 2009, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan 2009, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide
Temporary Services
OTHER REFERENCES
American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2007, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface
Profile of Blast Cleaned Steel
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component
Adhesives (An)
Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 46, Part 147, Section 65, 2007, Coast Guard, Department of
Homeland Securtiy, Carbon Dioxide and Halon Fire Extinguishing Systems.
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation vi (Rev-0)
COMDTPUB P16700.4, NVIC 3-95, 6/19/1995; Periodic Inspection and Testing of Fixed Halon Fire
Fighting Equipment Aboard Mechant Vessels
Commercial Item Description (CID) A-A-52624, Nov 2008, Antifreeze, Multi Engine Type, Ethylene
Glycol (For Caterpillar equipment applications, use CAT Extended Life Pre-Mix coolant.)
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust-
Petrolatum
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
Commercial Item Descriptions (CID) A-A-59316, Nov 2003 Abrasive Materials for Blasting
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
Fernstrum Gridcooler Installation and Maintenance Manual, 2006, Form 165
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller -
Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller -
Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)
MIL-D-3134, Sep 1989, Deck Covering Materials
MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)
MIL-STD-2191, Nov 1992, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel
Surfaces Prepared by Dry Abrasive Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of
Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating vii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
4 Y **Propeller shaft NSN: 2010-01-040-5504 1 ea.
7 Y **Propeller NSN: 2010-01-482-6135 1 ea. 6,561.81
11 Y **4- inch Simplex
Strainer (Hayward, Model # b148)
Hayward, Model # B148 1 ea. 1,339.00
11 N Simplex Strainer Krasll, Model # 72-8F 1 ea.
14 N Wire Rope 1 ea.
16 Y *Transducer Cover
Plate
N/A 1 ea. 50.00
23 N ***Fathometer
Transducer, Shallow
Water, 50-200 kHz
NSN: 5845-01-470-2500
Airmar Technology SS505
1 ea. 148.92
25 N 50/50 Premix
Coolant
N/A 110 gallons
200.00
29 N Air cylinder and Valve
Assembly
NSN: 8120-01-550-8120 10 ea. 870.00
29 N Cylinder Mate, Bottle
Stowage
PN: CM-6000 (OEM) 10 ea 175.00
29 N MDL-11 Stowage
Locker, PN: 53711-7246013 (OEM) 1 ea. 300.00
29 N Case, Photogra.
Equipment (1650
Pelican Case)
NSN: 6760-01-491-2821 3 ea. 325.00
29 N MSA M7 Firehawk
Responder SCBA
NSN: 4240-01-587-6781 4 ea. 5,500.00
29 N SCBA, Photo-
Luminescent Sign
NSN: 7690-01-462-6306 1
pg****
128.00
29 N CYLINDERS, Photo-
Luminescent Sign
NSN: 7690-01-462-6303 1pg**** 180.00
29 N Strap, Ratchet PN: 31025T925 (OEM) 1 ea. 120.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter viii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph
3.2.6.5 (Inspection report particulars)):
Work
Item Title
1 Hull Plating (U/W Body), Ultrasonic Testing
2 Appendages (U/W), Leak Test
3 Appendages (U/W) - Internal, Preserve
4 Propulsion Shafting; Remove, Inspect, and Reinstall
6 Propulsion Shaft Bearings (External), Check Clearances
8 Propeller, Clean and Inspect
11 Sea Strainers
13 Rudder Assembly, Remove, Inspect and Reinstall
14 Boat Davit, Level 2 Inspect and Repair
25 Keel Coolers, Clean, Inspect and Hydro ix (Rev-0)
PC_65C_WYTL_0909
PRINCIPAL CHARACTERISTICS - TENDER
65' WYTL („C‟ Class: Hulls 65610-65612)
PHYSICAL CHARACTERISTICS
Length Overall 65' 5-1/2"
Depth 8' 11"
Maximum Beam 19' 7-1/2"
Height of Highest Projection N/A
Full Load Draft 6' 2"
Full Load Displacement 72 long tons
Shore Tie Voltage Requirements 440-460
Frame Spacing 1' 6"
HULL CHARACTERISTICS
Hull/Main Weatherdeck Material Steel
Superstructure Aluminum/Steel
MACHINERY CHARACTERISTICS
Number of Propellers 1
Number of Blades 4
Diameter of Propeller 60"
Pitch 39"
RPM 400
1 (Rev-0)
00000_PWB_0312_FLT
REC_0000_FLT_ Commercial Project @ Contractor‟ Facility (0212)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and
Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
OTHER REFERENCES
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface
Profile of Blast Cleaned Steel
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel
Surfaces Prepared by Dry Abrasive Blast Cleaning
Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety
Administration, Department Of Transportation
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.3.1 HY-130 material substitution. The Contractor shall be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-
Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 shall be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-
130.
3.3.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-
Class” cutters, perform all welding and allied processes, and non-destructive testing/inspection (NDT/NDI) in accordance with NAVSEA TP 1688. The Contractor shall be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.3.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-
Class” cutters, the Contractor shall provide written Performance Qualification Records (PQR‟s) for each process to be used. The PQR‟s shall be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor shall ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA APPROVAL IS NOT REQUIRED FOR WELDING PROCEDURES SUBMITTED BUT THE
PROCEDURES MUST BE REVIEWED AND SHOWN TO SATISFY THE REQUIREMENTS SET
FORTH IN NAVSEA TP 1688, BY A WELDING REGULATORY AGENCY. THE REQUIREMENTS
FOR WELDING WELDOX 900 SHALL BE CONSIDERED THE SAME AS THOSE FOR WELDING
HY-130
3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility‟s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:
3.4.1 Contractor‟s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.
3 (Rev-0)
3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.
3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.
3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.
3.5 Interim changes and additions to SFLC Std Spec 0000. The Contractor shall be aware of the following interim changes and additions to the 2009 Edition of SFLC Std Spec 0000:
3.5.1 Acronyms and term definitions – paragraph 1.3 (Acronym and term definitions).
3.5.1.1 The term “COTR” has been replaced with “COR”, which is defined as follows:
“COR”: Contracting Officer‟s Representative – the person delegated by the KO as the on-scene representative for matters concerning performance of work; this includes correctness, timeliness, and quality of the Contractor‟s work. Normally, the CO/OINC is designated the COR.”
3.5.1.2 Definition addition for the term “Ungrounded, as follows:
“Ungrounded”: A power system where all of the current-carrying conductors and windings
(including any neutral connection) are insulated from ground. In contrast, a generator or transformer in which at least one conductor or point (usually the midpoint or corner of a delta winding or the common center of a wye winding) is intentionally grounded, either solidly or through an impedance, is considered grounded. Note that the distinction concerns only current-carrying conductors; for both ungrounded and grounded power systems, non-current carrying metal parts and equipment grounding conductors are always bonded to earth ground for personnel safety. At non-Governmental facilities, dockside wye connected transformer secondary windings are almost always grounded and are generally not suitable for connection to a Coast Guard cutter without a separate Contractor furnished isolation transformer.”
3.5.2 Changes to paragraph 3.2.4 2.3 (QP-1 Inspector or Tech Rep duties).
“3.2.4.2.3 QP 1 Inspector or Tech Rep duties.
3.2.4.2.3.1 The Coating Inspector for the “QP 1-certified” Contractor or the Contractor-provided
NACE-certified Tech Rep shall remain on site, to perform the following duties, as applicable, for each work item that involves preservation of “critical-coated surfaces”:
Verify inspection instrument calibration.
Verify and approve the suitability of ambient conditions before surface preparation is begun, and before each coat of paint is applied.
Verify all aspects of surface preparation – including, but not limited to:
o Cleanliness of compressed air.
o Adequacy of solvent cleaning.
o Proper handling of blast media.
o Actual surface preparation procedure.
Inspect and approve final surface preparation, before application of primer coat.
Supervise and approve coating system preparation and application procedures, including but not limited to: mixing and thinning, stripe coating application, spray techniques, and film thickness measurements and recordings.
4 (Rev-0)
Determine when applied coats have sufficiently cured for overcoating, or for system service resumption (see paragraph A2.1.18 (Critical drying time requirements)).
Complete and sign the quality assurance (QA) inspection forms (see QA-1 thru QA-5), provided in Appendix A (Requirements for Preservation of Ship Structures) of this document.
Submit all completed QA inspection forms to the COR (through the Contractor), upon completion of work.
3.2.4.2.3.2 The Contractor shall ensure the NACE Inspector is formally informed - via suitable subcontract documentation- and is willing and able to perform of all duties listed above. Submit documentation of this contract and assumption of duties to the KO at the Arrival Conference.”
3.5.3 Changes to contents of paragraph 3.2.5 (Planning document).
“3.2.5 Planning document. The Contractor shall generate a legible Planning Document (PD) with the following characteristics:
Graphical in format (see Fig. 1 (Sample Planning Document Submittal)).
Shows overall period of performance for each CLIN, with start and stop dates of major sub-tasks.
Contains due dates for Critical Inspection Reports (CIR) and any events requiring Coast
Guard Inspector presence.
Identifies all work item time periods that require OEM Tech Rep assistance.
Identifies the “critical paths” for the project.
Shows calculations for the “float” along the critical paths and labels the critical paths with the number of delay days the critical paths can absorb without affecting the final delivery date.
NOTE
Float is the number of days that the critical paths can be delayed without affecting the final delivery date.
3.2.5.1 Ensure that the PD also includes the names, contact information, and written commitment from all
Tech Reps required by the Contract - indicating they are available for work during the proposed time period.
3.2.5.2 Submit a preliminary electronic copy of the PD to the COR - for Government review - no later than one week after contract award.
3.2.5.3 Submit 3 copies of the PD to the COR, 15 days prior to the start of the performance period, and at all weekly Progress Meetings.
NOTE
A separate document, specifically prepared for the Government is not desired or required. A copy or summary of the Contractor‟s internal scheduling document is preferred.
FIG. 1 - SAMPLE PLANNING DOCUMENT SUBMITTAL
5 (Rev-0)
3.2.5.4 When the critical path extends beyond or encroaches upon the final delivery date, provide a resource constraint and scheduling evaluation of the critical path before any request for extension will be entertained. Submit the resource constraint and scheduling evaluation via a CFR.
NOTE
The intent of the resource constraint and scheduling evaluation is to identify the resources necessary to
„crash‟ the critical path or make adjustments to the production schedule to meet the delivery date in lieu of a project extension.”
3.5.4 Additional sub-paragraphs to paragraph to 3.2.6.5 (Inspection report particulars).
“3.2.6.5.3 CFR tracking system. The Contractor shall create and maintain a CFR tracking system for the project. At a minimum, ensure that the CFR tracking system shall list all required reports, broken down by the following:
Work item and paragraph number.
Due dates.
Submission dates.
CFR/CIR submission number.
3.2.6.5.3.1 Be aware that the COR will respond via the CFR reply as to whether the CIR/CFR „fully‟ or
„partially‟ satisfied the inspection and reporting requirements in the associated work item.
3.2.6.5.3.2 When submitting a CFR, ensure that the applicable work item and paragraph number for which the inspection report is being submitted is included on the CFR.
3.2.6.5.3.3 Submit a copy of the CFR tracking sheet to the COR at the arrival conference.
3.2.6.5.3.4 At a minimum the Contractor shall update and submit a copy of the CFR tracking sheet to the
COR the day before each weekly progress meeting. At the required CFR due date, submit the CFR tracking sheet to the COR via a CFR for review and formal archiving with the project records.”
3.5.5 Changes to contents of paragraph 3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems).
“3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems.
When the shipboard grey water and sewage systems are disrupted due to repairs required by contract work, the Contractor shall provide vessel-personnel with a sanitary facility, within a five minute walking distance from the vessel, to include the amenities listed in Table II (Sanitary Facility Amenities). Ensure the following:
Shower stalls are equipped with privacy screens.
Sinks are provided with fresh hot and cold water.
Electrical convenience GFI receptacles, in accordance with NFPA 70, National Electric
Code (NEC), are located in vicinity of sinks.
Toilets have doors or privacy dividers.
Lockers are capable of being locked.”
3.5.6 Changes to contents of paragraph 3.3.2.1.1 (Water depth).
6 (Rev-0)
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
Ordinary low water mark on non-tidal rivers.
At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”
3.5.7 Electrical compliance planning.
“3.3.14 Electrical compliance planning. For cutter availabilities, the Contractor shall submit to the KO the following electrical compliance planning documentation during the pre-award phase of the contract.
3.3.14 1 Shore power. When ungrounded shore power is to be provided per SFLC Std Spec 8635, provide a one line electrical diagram showing how such power will be supplied, including the winding and grounding configuration and rating of any generator or isolation transformer. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.
3.3.14.2 Arc welding. When electric arc welding is to be performed per SFLC Std Spec 0740 while the vessel is waterborne, provide a diagram showing the general proposed location of each welding machine, the grounding configuration of each machine, and the return current conductor size and length. For drydock availabilities, separate diagrams may be necessary for waterborne and non-waterborne periods.
3.3.14.3 Hull bonding and lightning protection. For work periods while the vessel is not waterborne, provide a diagram showing how the hull grounding straps required by SFLC Std Spec 8635 will be sized
(length and gauge) and connected.
3.3.14.4 Tool and equipment power. Provide a diagram showing how Contractor tool and equipment power will be supplied and distributed for dockside and shipboard use in accordance with SFLC Std Spec
0450. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.”
3.5.8 Changes to paragraph to A2.1.1.3 (Document submission).
A1.1 “A2.1.1.3 Document submission.
A1.2 A2.1.1.3.1 For all work involving preservation of “critical-coated surfaces”, ensure the following is submitted to the COR at the Arrival Conference, for each coating system intended to be applied:
Coating system manufacturer‟s name.
Product data sheets.
MSDS.
COC.
A1.3 A2.1.1.3.2 Documentation shall be broken out by work item, to also include the following information:
Brand name.
Color.
Intended mil thickness.
Time between coats.
Intended final cure time prior to immersion or full duty rating, as applicable.
7 (Rev-0)
A1.4 A2.1.1.3.3 For work involving preservation of surfaces not designated as “critical-coated surfaces”, submit all product data sheets, MSDS, and COC to the COR, prior to commencement of work.”
3.5.9 Requirements changes to paragraphs A2.1.5 (Tenting) and A2.1.6 (Ambient condition control).
“A2.1.5 Tenting and ambient condition control – “for critical-coated surfaces”.
A2.1.5.1 When the ambient condition parameters necessary for full paint cure or to meet environmental conditions, as required in paragraph A.2.1.4 (Ambient condition parameters), cannot be met for successful application and curing of “critical-coated” surface coating systems, the Contractor shall provide the following, at no additional cost to the Government:
Suitable tenting, as applicable, for exterior surface preservation.
Suitable ambient condition control equipment, which may include, but not be limited to the below-listed, to create and maintain ambient conditions recommended by the coating system‟s manufacturer, and facilitate successful coating application and curing.
o AC system.
o Heaters.
o Blowers.
o Dehumidifiers.
A2.1.5.2 Submit an ambient condition control plan to the COR within 24 hours prior to initiating ambient condition control process
NOTE
The Contractor is expected to be aware of the advent of environmental conditions that are adverse to preservation of critical-coated surfaces and include all costs in
3.5.10 Pre-surface preparation requirements – additional to paragraph A2.1.7 (Pre-surface preparation requirements).
“A2.1.7.4 Coupon test. In order to ensure production of required surface profile, the Contractor shall accomplish the following, tasks, whenever abrasive-blasting is required in a work item:
A2.1.7.4.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Use a new metal plate, of the same metal type and material properties as the area to be blasted, steel or aluminum plate, as applicable. For steel plates, the new plate shall have the mill scale intact and the plate will be in a Rust Grade "A" condition, per the SSPC-VIS 1 visual standard cards. No existing anchor profile, other than the surface irregularities from the manufacturing process are permitted on the test coupon. The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot. The test coupon shall be affixed so as to not permit excessive movement during the performance test.
CAUTION!
Do not affix the coupon to the vessel nor shall the blast media from the performance test strike the vessel during the test
8 (Rev-0)
A2.1.7.4.2 Ensure that the abrasive blasting operation test on the test coupon is with the very same setup that will be used to blast the vessel. The setup shall include, but not be limited to:
The abrasive media to be used (material and media size).
Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
Delivery rate and pressure settings.
A2.1.7.4.3 Blast an one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the applicable work item and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, method A or C. Notify the COR in advance of the abrasive blasting operation test, to permit the witnessing of the test by appropriate Coast Guard personnel. Submit a CFR documenting the results of the abrasive blasting operation test. CFR shall include at a minimum, the following:
Area of the vessel that the verified setup will be used to abrasive blast with.
The abrasive media used.
The nozzle size and type.
The delivery rate and pressure.
The test coupon starting properties (material type and surface conditions).
The resultant anchor profile readings from the test.
NOTES
1. ULTRA HIGH PRESSURE WATER JETTING DOES NOT CREATE AN ANCHOR PROFILE
AND IS EXEMPT FROM THE ANCHOR PROFILE TEST COUPON CHECK.
2. THE REVERSE SIDE OF THE TEST COUPON MAY BE USED FOR THE SUBSEQUENT
TEST, PROVIDED THAT THE CONDITIONS IN PARAGRAPH A2.1.7.4 (COUPON TEST) ARE
MET.
A2.1.7.4.3 Repeat the abrasive blasting operation test in the following instances:
The setup, as defined in paragraph A2.1.7.4.1 is changed.
The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
When Directed by the COR.
NOTE
A performance test of the abrasive blasting operations on a test coupon and measuring the anchor profile prior to performing the operation on the cutter, in order to confirmed that the anchor profile range that the operation is going to produce. An abrasive blasting operation test is prudent, as there are enough variables in the equipment setup and media properties that the resulting anchor profiles from one contractor to the next vary significantly.
3.5.11 Post-surface preparation requirements - additional to paragraph A2.1.8 (Post-surface preparation requirements).
9 (Rev-0)
A2.1.8.8 Substrate profile measurements - during and post-surface preparation. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item for complete preservation of a ”critical-coated” surface:
A2.1.8.8.1 During surface preparation by abrasive blasting or waterjetting operations, spot check the existing anchor profile per 500-square feet, in order to 'project' the need to manage the excessive anchor inspect for both excessive and insufficient anchor profiles . When the Contractor elects to prepare a substrate by waterjetting, the Contractor shall inspect the substrate for areas of insufficient or excessive anchor profile, both visually and in accordance with ASTM D4417, Method A or C. Submit a CFR detailing the location, square footage, measured anchor profiles, and the anchor profile range required for the applicable coating system.
A2.1.8.8 2 Post completion of surface preparation, measure the profile of the resultant bare surfaces, in accordance with ASTM D4417, Method A or C.”
3.5.12 Caution verbiages – additional to paragraph A2.1.18 (Critical drying and cure time requirements).
“CAUTIONS!
1. Hard cure times or cure time prior to immersion for any “critical coated system” shall be met as published on the Product Data Sheets available online. No early undocking or relaxation of these published requirements is permitted without prior approval from the KO. Coating system manufacturer‟s Sales or Technical
Representatives may not relax these requirements. Painting and curing of all tank coating systems (except for tanks that are inboard and not touching the skin of the vessel (side and/or bottom) shall occur while the cutter is out of the water.
2. CAPAC systems shall not be energized until full cure of all underwater paint systems has occurred.”
3.5.13 Preservation Plan.
“A2.2 Preservation Plan (PP). The contractor shall submit a PP to the COR at the arrival conference, to allow for review of all work items pertaining to the preservation of the vessel. At a minimum, PP shall include the following and be broken down by work item:
Coatings to be applied – listed by manufacturer and product identification numbers.
Target wet and dry film thickness values.
Authorized reducers/solvents - including maximum percent by volume for reducers/solvents.
Colors by FED-STD-595 color number.
Application method for each coat.
Application pressure and nozzle size requirements listed on the manufacturer‟s product data sheet(s).
Minimum recoat windows for applying subsequent coats, maximum recoat windows to apply subsequent coats, adjusted for anticipated temperatures.
Any special instructions or environmental limits listed by the coating manufacturer.
Intended final cure times prior to immersion or full duty rating (as applicable).”
3.5.14 Changes to paragraph B2.2.3.3.1.
“B2.2.3.3.1 Do not release lead or lead-contaminated materials into the environment. Conduct periodic air monitoring (as appropriate) for lead in the worker‟s breathing zone, during the course of any
10 (Rev-0) abatement work involving lead containing materials, to prevent exposure at or above the PEL. Submit results of all air monitoring samples to the COR, within 24 hours of completion of sampling.”
3.5.15 Booming requirements during the offload or on-load of petroleum products.
“B2.2.10 Booming requirements during the offload or load of petroleum products. The Contractor shall provide a containment boom system and boom off the cutter during all petroleum cargo on-loads and offloads. The cutter shall be boomed off by the contractor during both shipyard functions and the final bunkering of the cutter by ship's force. The contractor is responsible to provide the labor to deploy and recover the boom during all operations, including operations conducted by ship's force. The containment boom shall at a minimum, fullly encapsulate the cutter from the pier wall in front of the cutter to the pier wall at the stern of the cutter. When moored alongside a pier that does not provide a fully intact pier wall that will contain a spill, the containment boom shall wrap completely around the cutter on all sides to provide spill containment. For tug and barge configurations, the containment boom shall encapsulate both the cutter and the barge, as applicable.”
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
http://www.uscg.mil/directives/cim.asp
11 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer‟s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer‟s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
12 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame &
Deck, relation to equipment, etc.)
TEMPERATURE % REL.
HUMID-
ITY DEW PT. SURFACE AMBIENT
ΔT
| DP - Surface |
13 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Place Surface Profile
Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
14 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location.
When an area is divided into separate sections, maintain a separate log for each section.
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Reading: _____ mils _____ mils _____ mils _____ mils _____ mils
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
_____ mils _____ mils _____ mils _____ mils _____ mils
15 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS
CONDUCTIVITY
(microsiemens/cm)
16 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction
Time
Coating System Sequence
(Primer/Touchup/3 rd
Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Location (Frame Reference): ___________________
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation
3 Before
Adjustments
After Adjustments
Avg.
Application Method (Airless, Conventional Spray, Rolled) Average DFT
17 (Rev-0)
11010_UT_0712_FLT
REC_11010_UT_FLT_65‟ WYTL („C‟ Class: Hulls 65610-65612) (0911)
WORK ITEM 1: Hull Plating (U/W Body), Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to conduct ultrasonic testing (UT) of U/W hull plating.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 65B WYT 0700-004, Rev-, Docking Block Arrangement (“B &C”
Class)
Coast Guard Drawing 65B WYT 1101-001, Rev E, Construction Plan, Shell Expansion and Sections
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and Allied Processes
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
3.2 (UT measurements).
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
18 (Rev-0)
3.1.4 Interferences.
None.
3.2 UT measurements. The Contractor shall perform 200 UT measurements of U/W hull surfaces, in locations designated by the Coast Guard Inspector, using Coast Guard Drawings 65B
WYT 0700-004 and 65B WYT 1101-001 for guidance, in accordance with SFLC Std Spec 0740, Appendix C. Mark up a copy of Coast Guard Drawing 65B WYT 1101-001 to show all locations selected for measurement and record all measurements in Table I (UT Measurements Summary
Sheet - Port/Stbd Shell) provided at the end of this item.
This is the start of the file's text. The full file is on GovTribe.