Crane Cert.pdf
PDF 261 KB Posted
- Solicitation number
- HSCG85-12-Q-P30775
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 00001 HSCG85-12-Q-P30775.pdf | ||
| Solicitation For USCGC IDA LEWIS_WLM_551_DOCKSIDE.docx | DOCX document | |
| One Day Pass Request.xlsx | XLSX spreadsheet | |
| NAVSTA Newport Pier Restriction.pdf | ||
| IDA LEWIS SPECIFICATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIGURE P-1
APPENDIX P – CONTRACTOR CRANE (OR ALTERNATE MACHINE USED TO LIFT
SUSPENDED LOAD) AND RIGGING GEAR REQUIREMENTS
CERTIFICATE OF COMPLIANCE
This certificate shall be signed by an official of the company that provides cranes (or multi-purpose machines, material handling equipment, or construction equipment used to lift loads suspended by rigging gear) or rigging gear for any application under this contract. Post a completed certificate on each crane or alternate machine (or in the contractor’s on-site office for rigging operations) brought onto Navy property.
CONTRACTING OFFICER’S POINT OF CONTACT
(Government Representative)
PHONE
PRIME CONTRACTOR/PHONE
CONTRACT NUMBER
CRANE OR ALTERNATE MACHINE SUPPLIER/PHONE
(if different from prime contractor)
CRANE OR
ALTERNATE MACHINE
NUMBER (i.e., ID number)
CRANE OR ALTERNATE MACHINE MANUFACTURER/TYPE/CAPACITY
CRANE OR ALTERNATE MACHINE OPERATOR'S NAME(S)
I certify that
1. The above noted crane or alternate machine and all rigging gear conform to applicable OSHA regulations (host country regulations for naval activities in foreign countries) and applicable ASME B30 standards. The following OSHA regulations and ASME standards apply:________________________________________________________
2. The operators noted above have been trained and are qualified for the operation of the above noted crane(s) or alternate machine(s).
3. The operators noted above have been trained not to bypass safety devices during lifting operations.
4. The operators, riggers and company officials are aware of the actions required in the event of an accident as specified in the contract.
COMPANY OFFICIAL SIGNATURE
DATE
COMPANY OFFICIAL NAME/TITLE
POST ON CRANE (OR ALTERNATE MACHINE)
(IN CAB OR VEHICLE)
(or in the contractor’s on-site office for rigging operations)
| P-1.pdf |
| CONTRACTING OFFICER’S POINT OF CONTACT |
| CRANE OR ALTERNATE MACHINE SUPPLIER/PHONE |
| Company: |
| Crane ManufactuwCrane ModeVCrane Number: |
| Date of Annual Inspection Expiration: |
| Date of Quadrennial Inspection Expiration: |
| Contracting OIftclal: |
| Phone Number: |
| Location of lift site: |
| Duration crane will be continuously on the job site hrs days weeks: |
| Which OSHA regulations does the certificate of compliance indicate For cranes used in cargo transfer 29 CFR 1917 applies for cranes used in construction demolition or maintenance 29 CFR 1926 applies for cranes used in shipbuilding ship repair or ship breaking 29 CFR 1915 applies: |
| Does the plan designate a qualified RiggerinCharge: |
| What is the weight of the heaviest load to be lifted: |
| What is the weight of the rigging gear: |
| Main Block: |
| Aux Block: |
| Jib Stowed: |
| Jib Erected: |
| Other: |
| What is the main boom length If a jib will be utilized indicate the length and offset: |
| What are the minimum and maximum load radii I Min: |
| Max: |
| What are the environmental conditions under which crane operations are to be stopped: |
| What circumstances require this lift to be classified as a critical lift Blind lift 75 of chart nonroutine rigging etc: |
| What are the exact dimensions of the load L x W x H: |
| Does the plan indicate the crane position Overhead view: |
| What is the maximum lift height of the lift: |
| What is the minimum boom angle: |
| What is the maximum boom angle: |
| What is the name of the operator: |
| Indicate names of backup operator if required: |
| Does the plan show lift points: |
| Does the plan describe the rigging procedures: |
| Does the plan indicate rigging hardware requirements: |
| What are the coordination and communication requirements for the l lift eg radio and hand signals: |
| What is the name of the lift supervisor: |
| Does the plan indicate the qualifications of the lift supervisor: |
| What are the names of the riggers: |
| I: |
| I_3: |
| I_4: |
| Proposed Dates of Entry: |
| Prime Contractor: |
| Prime Contractor POe I Phone: |
| Contracting Officer: |
| Phone I Contract Number: |
| Crane SupplierlPhooc if different from prime contractor I Serial number: |
| Crane Manufacturer I Crane Model I Crane Number: |
| 2: |
| Manufacturers Maximum Rated Capacity I Heaviest Lift: |
| 3: |
| Text82: |
| Check Box83: Off |
| Check Box84: Off |
| Check Box85: Off |
| Check Box86: Off |
| Check Box88: Off |
| Check Box89: Off |
| Check Box90: Off |
| Check Box91: Off |
| Check Box92: Off |
| Check Box93: Off |
| Check Box94: Off |
| Check Box95: Off |
| Check Box96: Off |
| Check Box97: Off |
| Text98: |
| Check Box99: Off |
| Check Box101: Off |
| Check Box102: Off |
| Text103: |
| Text104: |
| Text105: |
| Text106: |
| Text107: |
| Text108: |
| Text109: |
| Text110: |
| Check Box111: Off |
| Check Box112: Off |
| Check Box113: Off |
| Check Box114: Off |
| Check Box115: Off |
| Check Box116: Off |
| Check Box117: Off |
| Check Box118: Off |
| Check Box119: Off |
| Check Box120: Off |
| Check Box121: Off |
| Check Box122: Off |
| Check Box123: Off |
| Check Box124: Off |
| Check Box125: Off |
| Check Box126: Off |
| Check Box127: Off |
| Check Box128: Off |
| Check Box129: Off |
| Check Box130: Off |
| Check Box131: Off |
| Check Box132: Off |
| Check Box133: Off |
| Check Box134: Off |
| Check Box135: Off |
| Check Box136: Off |
| Check Box137: Off |
| Check Box138: Off |
| Check Box139: Off |
| Check Box140: Off |
| Check Box141: Off |
| Check Box142: Off |
| Check Box143: Off |
| Check Box144: Off |
| Check Box145: Off |
| Check Box146: Off |
| Check Box147: Off |
| Check Box148: Off |
| Check Box149: Off |
| Check Box150: Off |
| Check Box151: Off |
| Check Box152: Off |
| Text154: |
| Text155: |
| Text156: |
| Text157: |
| Text158: |
| Check Box162: Off |
| Check Box163: Off |
| Check Box164: Off |
| Check Box165: Off |
| Check Box166: Off |
| Text167: |
| Check Box168: Off |
| Check Box169: Off |
| Check Box170: Off |
| Check Box171: Off |
| Check Box172: Off |
| Check Box173: Off |
| CONTRACTING OFFICERS POINT OF CONTACT Government Representative: |
| PHONE: |
| PRIME CONTRACTORPHONE: |
| CONTRACT NUMBER: |
| CRANE OR ALTERNATE MACHINE SUPPLIERPHONE if different from prime contractor: |
| Text1: |
| CRANE OR ALTERNATE MACHINE MANUFACTURERTYPECAPACITY: |
| CRANE OR ALTERNATE MACHINE OPERATOR S NAMES: |
| apply: |
| COMPANY OFFICIAL SIGNATURE: |
| DATE: |
| COMPANY OFFICIAL NAMETITLE: |
File details come from the government source that posted it. Updated .