Price Breakdown Contractor's price will be broken down for each item of the specification, as follows:
| SUBCONTRACTOR | |||||||||
| ITEM | TITLE | PRIME | LABOR | MATERIAL | LABOR | MATERIAL | OTHER | ||
| NO. | M/H | PRICE | PRICE | M/H | PRICE | PRICE | PRICE | TOTAL | |
| D-01 | Temporary Services | ||||||||
| D-02 | Breakers (Degaussing) Inspect & Test | ||||||||
| D-03 | Circuit Breakers(60Hz) Inspect & Test | ||||||||
| D-04 | Circuit Breakers (400 HZ) Inspect & Test | ||||||||
| D-05 | Commissary Hoist (GEN) Level 2 Inspect & Repair | ||||||||
| D-06 | Warping Capstan (GEN) Level 2 Inspect & Repair | ||||||||
| D-07 | Oily Water Separator Overhaul | ||||||||
| D-08 | Evaporators (GEN) Overhaul | ||||||||
| D-09 | Sewage Ejector Pump Overhaul | ||||||||
| D-10 | Vent Ducts (Galley & Pantry Room) Commercial Cleaning | ||||||||
| D-11 | Vent Ducting Cleaning Main Engine Air Intakes | ||||||||
| D-12 | MDE Filter Pod Renewal | ||||||||
| D-13 | Air Compressor Overhaul | ||||||||
| D-14 | Compressed Air Receivers Inspect & Test | ||||||||
| D-15 | Fuel Oil Manifold Valves Overhaul | ||||||||
| D-16 | EGT Day tank Preserve | ||||||||
| D-17 | Tank (Waste Oil) Clean | ||||||||
| D-18 | Grey water Holding Tanks, Clean & Inspect | ||||||||
| D-19 | Potable water Pneumatic Tank, Clean & Inspect | ||||||||
| D-20 | Tank (Sewage Holding) Preserve 100% | ||||||||
| D-21 | Water Tight Hatch 1-304-1 Repair | ||||||||
| D-22 | Starboard Boat Deck Plating Renewal | ||||||||
| D-23 | Fantail deck Exterior, Inspect & Preserve | ||||||||
| D-24 | After Steering (2-320-0-E) Deck Preservation | ||||||||
| D-25 | Fan room (1-280-1-Q) Deck Preservation & Repair | ||||||||
| D-26 | Fan room (01-97-1-Q) Deck Preservation & Repair | ||||||||
| D-27 | Rescue Gear Locker (01-108-1-A) Deck Plating Renewal | ||||||||
| D-28 | Storage locker 2-90-@-A Deck Plating Renewal | ||||||||
| D-29 | Stack Deck Preservation | ||||||||
| D-30 | Stack deck Structural Plating Renewal | ||||||||
| D-31 | Deck Drain Piping repair | ||||||||
| D-32 | Captain's Cabin Overhead Repairs | ||||||||
| D-33 | Deck plating renewal Mess deck Vestibules | ||||||||
| D-34 | Vacuum Sewage Pump Overhaul | ||||||||
| D-35 | Counter Measure Wash Down System; Renew | ||||||||
| D-36 | Firemain Pressure Sensor Line Repairs | ||||||||
| D-37 | Firemain & ASW Pressure Regulating Valve Overhaul | ||||||||
| D-38 | Chill water System Insulation renewal | ||||||||
| D-39 | Deck Covering (Interior Wet) Renew | ||||||||
| D-40 | Deck covering (Interior Quarry) Tile | ||||||||
| D-41 | Berthing Head Renovation | ||||||||
| Total Amount of Definite Items | |||||||||
| OPTIONAL ITEMS | |||||||||
| O-42 | Deck Repair After Steering (2-320-0-E) | ||||||||
| O-43 | Grey Water Holding tanks Preserve 100% | ||||||||
| Total Amount Of Optional Items | |||||||||
| Total Evaluated Amount of Definite & Optional Items |
| Composite Labor Hour Rate Applicable to Contract Changes: | |
| Labor Hour Rate | $________ |
| Estimated Composite Labor Hour | 1730 HRS |
| Extended Composite Labor Amount | $_______ |
NAME OF CONTRACTOR:
CONTRACTOR PRICE BREAKDOWN
HSCG85-11-R-P30001
ATTACHMENT J.5
Other files
| File | Type | Posted |
|---|---|---|
| SF3-A003.doc | DOC document | |
| SF3-A002.doc | DOC document | |
| Technical Evaluation Criteria | — | |
| SF3-A001.doc | DOC document | |
| Technical Evaluation Criteria | — | |
| Solicitation Pkg | — | |
| SF33 | — | |
| Request for Clarification | — | |
| NOTICE TO OFFERORS(IDIQ DS) | — | |
| DS IDIQ Prototype Specification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .