B.1
DEFINITE ITEMS:
| D-01 |
| Production Control, GANTT Bar Chart Provide |
| $ |
| D-02 |
| Chain Locker Clean and Inspect |
| $ |
| D-03 |
| Hull Plating, Underwater Body Inspect |
| $ |
| D-04 |
| Appendages (Underwater) Leak Test |
| $ |
| D-05 |
| Appendages (Underwater) Preserve, Internal |
| $ |
| D-06 |
| Fender Renewal (Johnson Duramax) 23 Ft ATON Boat |
| $ |
| D-07 |
| Voids (non-accessible) Leak test |
| $ |
| D-08 |
| Voids (non-accessible) Preserve, Internal |
| $ |
| D-09 |
| Tanks (MP Fuel Service) Clean and Inspect |
| $ |
| D-10 |
| Tanks (Potable Water) Clean and Inspect |
| $ |
| D-11 |
| Sea Bay Clean and Inspect |
| $ |
| D-12 |
| Watertight, Weathertight Door & Hatch Renewals |
| $ |
| D-13 |
| Propulsion Shaft Seals (Mechanical) Inspect and Clean |
| $ |
| D-14 |
| Propulsion Shaft Bearing (external) Check clearances |
| $ |
| D-15 |
| Controllable Pitch Propeller System Maintenance |
| $ |
| D-16 |
| Hubs General Maintenance |
| $ |
| D-17 |
| Auxiliary Seawater Pressure Regulating Valve Overhaul |
| $ |
| D-18 |
| Stern Tube Seawater Supply Modifications |
| $ |
| D-19 |
| Ship Service Diesel Generator Balance & Inspect |
| $ |
| D-20 |
| Fathometer Transducers General Maintenance |
| $ |
| D-21 |
| Vent Ducts (Engine & Motor Room, All) Commercial Clean |
| $ |
| D-22 |
| Vent Ducts (Galley, All) Commercial Clean |
| $ |
| D-23 |
| Vent Ducts (Laundry Exhaust) Commercial Clean |
| $ |
| D-25 |
| Sea Strainers (All Sizes) Overhaul |
| $ |
| D-26 |
| Sea Valve (<= 2.5 Inches) Renewal |
| $ |
| D-27 |
| Sea Valve (> 2.5 Inches) Overhaul |
| $ |
| D-28 |
| Potable Water Pneumatic Tanks, Clean, Inspect, and Hydro |
| $ |
| D-29 |
| Compressed Air Receivers (All) Clean, Inspect and Hydro |
| $ |
| D-30 |
| Hydraulic System Accumalators Inspect & Hydro Test |
| $ |
| D-31 |
| Rudder Access Cover Renewal |
| $ |
| D-32 |
| Rudder Inspect and Repair |
| $ |
| D-33 |
| Rudder Stock Bearings Check Clearances |
| $ |
| D-34 |
| Thruster Unit (General) Overhaul |
| $ |
| D-35 |
| Aft Cross Deck Winch Replacement |
| $ |
| D-36 |
| Forward Hydraulic Crossdeck Winches Inspect and Repair |
| $ |
| D-37 |
| Hydraulic Chainstoppers Level 2 Inspect and Repair |
| $ |
| D-38 |
| Mechanical Chain Stoppers Inspect and Repair |
| $ |
| D-39 |
| Anchor Windlass (Gen) Level 2 Inspect & Repair |
| $ |
| D-40 |
| Anchor Chain and Ground Tackle Inspect and Repair |
| $ |
| D-41 |
| Warping Capstan (Gen) Level 2 Inspect & Repair |
| $ |
| D-42 |
| Boat Boom Inspect, Repair, And Test |
| $ |
| D-43 |
| Single Point Davit Inspect. Repair. And Test |
| $ |
| D-44 |
| Buoy and Cargo Handling Crain Repair & Test |
| $ |
| D-45 |
| Dive Air Compressor Installation |
| $ |
| D-46 |
| Galley Grease Trap Renew |
| $ |
| D-47 |
| Oily Water Separator Overhaul |
| $ |
| D-48 |
| Grey Water Holding Tank Clean and Inspect |
| $ |
| D-49 |
| Sewage Holding Tank and Atmospheric Tank Clean & Inspect |
| $ |
| D-50 |
| Sewage Piping Clean and Inspect |
| $ |
| D-51 |
| Decks Exterior Preserve |
| $ |
| D-52 |
| Exhaust Stacks Exterior Preserve |
| $ |
| D-53 |
| Potable Water Pump Room Deck Repair and Preservation |
| $ |
| D-54 |
| Emergency Diesel Generator Room Deck Preservation |
| $ |
| D-55 |
| Weatherdeck Cofferdams and Goosenecks Renewal |
| $ |
| D-56 |
| Buoy Decks (Exterior) Preserve, 100% |
| $ |
| D-57 |
| Hull Plating, Underwater Body Preserve (100%) |
| $ |
| D-58 |
| Hull Plating, Freeboard Preserve |
| $ |
| D-59 |
| Cathodic Protection, Zinc Anode Renewal |
| $ |
| D-60 |
| Cathodic Protection System Repairs |
| $ |
| D-61 |
| Temporary Services, Drydock Provide |
| $ |
| D-63 |
| Drydocking Accomplish |
| $ |
| TOTAL AMOUNT OF ALL DEFINITE ITEMS |
| $ |
B.2
OPTIONAL ITEMS:
Optional Items will be awarded if inspection reports reveal the necessity for activation. If activation is required, it must be no later than 15 JUL 2009
| O-64 |
| Appendages (Underwater) Air Test |
| $ |
| O-65 |
| Voids (Underwater Air Test |
| $ |
| O-66 |
| Hydraulic Chain Inhaul Winch Alignment |
| $ |
| TOTAL AMOUNT OF ALL OPTIONAL ITEMS |
| $ |
B.3
BID FOR COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the clause of Section H entitled “COMPOSITE LABOR HOUR RATE FOR CONTRACT CHANGES.”
| LABOR HOUR RATE |
| ESTIMATED QUANTITY |
| ESTIMATED AMOUNT |
| $____________/HOUR |
| 3449 HOURS |
| $_________________ |
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of bids only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.
B.4
LAY DAYS
Provide a price for dry dock Lay Days in accordance with HSAR 3052.217-94 (DEC 2003). The quoted price per day will apply to all lay days. The estimated quantity of 3 days is for evaluation purposes only.
PRICE PER DAY:
| X 3 DAYS |
| EXTENDED AMOUNT: |